Details

Title

Production Logistics Simulation Supported by Process Description Languages

Journal title

Management and Production Engineering Review

Yearbook

2016

Numer

No 1

Publication authors

Divisions of PAS

Nauki Techniczne

Publisher

Production Engineering Committee of the Polish Academy of Sciences, Polish Association for Production Management

Date

2016

Identifier

ISSN 2080-8208 ; eISSN 2082-1344

References

Zhong (2013), Petri Net Modelling : Container Terminal Production Operation Processing System Analysis and, Applied Mechanics Materials, 409, doi.org/10.4028/www.scientific.net/AMM.409-410.1320 ; Shah (2005), Process industry supply chains : advances and challenges Computers and Chemical, Engineering, 29. ; Osak (2014), A method for modelling the flow of objects to be machined in FMS using Enterprise Dynamics Computer, Applied Science, 10, 46. ; Antuela (2012), The application of discrete event simulation and system dynamics in the logistics and supply chain context Support, Decision Systems, 52, 802, doi.org/10.1016/j.dss.2011.11.015 ; Cheng (2011), A Petri net simulation model for virtual construction of earthmoving operations in, Automation Construction, 17, 181, doi.org/10.1016/j.autcon.2010.09.015 ; Kalinowski (2014), The model of discrete production scheduling system in UML notation - classes diagrams Materials, Advanced Research, 837, doi.org/10.4028/www.scientific.net/AMR.837.416 ; Rostkowska (2014), Simulation of production lines in the education of engineers : how to choose the right software Management and Production Engineering, Review, 24, 53, doi.org/10.2478/mper-2014-0036 ; Tserng (2010), The use of knowledge map model in construction industry of Civil Engineering and, Journal Management, 16, 332, doi.org/10.3846/jcem.2010.38 ; Löfstrand (2014), Ky osti Evaluating availability of functional products through sim - ulation Simulation Modelling Practice and, Theory, 47. ; Chai (2013), Virtual Production Line Design Based on the IDEF Method and, Applied Mechanics Materials, 4, 274. ; Cheng (2010), Modelling and monitoring of construction supply chains, Advanced Engineering Informatics, 24, doi.org/10.1016/j.aei.2010.06.009 ; Mazanek (2011), Constructing a bidirectional transformation between BPMN and BPEL with a functional logic programming language of Visual Languages, Journal Computing, 22, 66, doi.org/10.1016/j.jvlc.2010.11.005 ; Yang (2012), Critical path effect based delay analysis method for construction projects of, International Journal Project Management, 30, 385, doi.org/10.1016/j.ijproman.2011.06.003 ; Kłos (2015), Using computer simulation method to improve throughput of productions systems by buffers and workers allocation Management and Production Engineering, Review, 6, 60, doi.org/10.1515/mper-2015-0037 ; Björk (2013), Adoption processes for EDM EDI and BIM technologies in the construction industry of Civil Engineering and, Journal Management, 19, 172, doi.org/10.3846/13923730.2013.801888 ; Gola (2013), Design of storage subsystem of flexible manufacturing system using the computer simulation method Actual Problems of, Economics, 142.

DOI

10.1515/mper-2016-0002

×