Wyniki wyszukiwania

Filtruj wyniki

  • Czasopisma
  • Autorzy publikacji
  • Słowa kluczowe
  • Data
  • Typ

Wyniki wyszukiwania

Wyników: 9
Wyników na stronie: 25 50 75
Sortuj wg:

Abstrakt

The coal exploitation in the Upper Silesia region (along the Vistula River) triggers the strata seismic activity, characterized by very high energy, which can create mining damage of the surface objects, without any noticeable damages in the underground mining structures. It is assumed that the appearance of the high energy seismic events is the result of faults’ activation in the vicinity of the mining excavation. This paper presents the analysis of a case study of one coal mine, where during exploitation of the longwall panel no. 729, the high energy seismic events occurred in the faulty neighborhood. The authors had analyzed the cause of the presented seismic events, described the methods of energy decreasing and applied methods of prevention in the selected mining region. The analysis concluded that the cause of the high energy seismic events, during the exploitation of the longwall panel no. 729 was the rapid displacements on the fault surface. The fault’s movements arose in the overburden, about 250 m above the excavated longwall panel, and they were strictly connected to the cracking of the thick sandstone layer.
Przejdź do artykułu

Abstrakt

The paper presents a new geotechnical solution indicating a possibility of effective building structures protection. The presented solutions enable minimization of negative effects of underground mining operations. Results of numerical modelling have been presented for an example of design of preventive ditches reducing the influence of mining operations on the ground surface. To minimize the mining damage or to reduce its reach it is reasonable to look for technical solutions, which would enable effective protection of building structures. So far authors concentrated primarily on the development of building structure protection methods to minimize the damage caused by the underground mining. The application of geotechnical methods, which could protect building structures against the mining damage, was not considered so far in scientific papers. It should be noticed that relatively few publications are directly related to those issues and there are no practical examples of effective geotechnical protection. This paper presents a geotechnical solution indicating a possibility of effective protection of building structures. The presented solutions enable minimization of negative effects of underground mining operations. Results of numerical modelling have been presented for an example of design of preventive ditches reducing the influence of mining operations on the ground surface. The calculations were carried out in the Abaqus software, based on the finite element method.
Przejdź do artykułu

Ta strona wykorzystuje pliki 'cookies'. Więcej informacji