Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 9
items per page: 25 50 75
Sort by:

Abstract

The article presents an analysis of stresses in the current tool system of the die during the implementation of the third forging operation of the screw M12 class 10.9 with cylinder head and hexagonal socket. It was assumed that the level of negative cracking due to stress can be reduced by using a mounting interference between the die and the tube blank. Due to the design of the tool system value of the die, the interference value cannot be too large. Therefore, an analysis of the influence of the interference between the die and the tube blank in a die tool system on the value and distribution of stresses in the individual components. An analysis of the assembly stresses and the stresses occurring during the process of deformation of the shaped head of the screw was done. The calculations were performed using a commercial software package MARC / Mentat.
Go to article

Abstract

The quantitative description of an airlift bioreactor, in which aerobic biodegradation limited by carbonaceous substrate and oxygen dissolved in a liquid takes place, is presented. This process is described by the double-substrate kinetics. Mathematical models based on the assumption of plug flow and dispersion flow of liquid through the riser and the downcomer in the reactor were proposed. Calculations were performed for two representative hydrodynamic regimes of reactor operation, i.e. with the presence of gas bubbles only within the riser and for complete gas circulation. The analysis aimed at how the choice of a mathematical model of the process would enable detecting the theoretical occurrence of oxygen deficiency in the airlift reactor. It was demonstrated that the simplification of numerical calculations by assuming the “plug flow” model instead of dispersion with high Péclet numbers posed a risk of improper evaluation of the presence of oxygen deficiency zones. Conclusions related to apparatusmodelling and process design were drawn on the basis of the results obtained. The paper is a continuation of an earlier publication (Grzywacz, 2012a) where an analysis of single-substrate models of the airlift reactor was presented.
Go to article

Abstract

Rock excavation is a basic technological operation during tunnelling and drilling roadways in underground mines. Tunnels and roadways in underground mines are driven into a rock mass, which in the particular case of sedimentary rocks, often have a layered structure and complicated tectonics. For this reason, rock strata often have highly differentiated mechanical properties, diverse deposition patterns and varied thicknesses in the cross sections of such headings. In the field of roadheader technology applied to drilling headings, the structure of a rock mass is highly relevant when selecting the appropriate cutting method for the heading face. Decidedly differentiated values of the parameters which describe the mechanical properties of a particular rock layer deposited in the cross section of the drilled tunnel heading will influence the value and character of the load on the cutting system, generated by the cutting process, power demand, efficiency and energy consumption of the cutting process. The article presents a mathematical modelling process for cutting a layered structure rock mass with the transverse head of a boom-type roadheader. The assumption was made that the rock mass being cut consists of a certain number of rock layers with predefined mechanical properties, a specific thickness and deposition pattern. The mathematical model created was executed through a computer programme. It was used for analysing the impact deposition patterns of rock layers with varied mechanical properties, have on the amount of cutting power consumed and load placed on a roadheader cutting system. The article presents an example of the results attained from computer simulations. They indicate that variations in the properties of the rock cut – as cutting heads are moving along the surface of the heading face – may have, apart from multiple other factors, a significant impact on the value of the power consumed by the cutting process.
Go to article

Abstract

This article considers designing of a renewable electrical power generation system for self-contained homes away from conventional grids. A model based on a technique for the analysis and evaluation of two solar and wind energy sources, electrochemical storage and charging of a housing area is introduced into a simulation and calculation program that aims to decide, based on the optimized results, on electrical energy production system coupled or separated from the two sources mentioned above that must be able to ensure a continuous energy balance at any time of the day. Such system is the most cost-effective among the systems found. The wind system adopted in the study is of the low starting speed that meets the criteria of low winds in the selected region under study unlike the adequate solar resource, which will lead to an examination of its feasibility and profitability to compensate for the inactivity of photovoltaic panels in periods of no sunlight. That is a system with fewer photovoltaic panels and storage batteries whereby these should return a full day of autonomy. Two configurations are selected and discussed. The first is composed of photovoltaic panels and storage batteries and the other includes the addition of a wind system in combination with the photovoltaic system with storage but at a higher investment cost than the first. Consequently, this result proves that is preferable to opt for a purely photovoltaic system supported by the storage in this type of site and invalidates the interest of adding micro wind turbines adapted to sites with low wind resources.
Go to article

Abstract

By simulating the actual working conditions of a cable, the temperature variation rule of different measuring points under different load currents was analyzed. On this basis, a three-dimensional finite element model (FEM) was established, and the difference and influence factors between the simulation temperature and the experimental measured value were discussed, then the influence of thermal conductivity on the operating temperature of the conductor layer was studied. Finally, combined with the steady-state thermal conductivity model and the experimental measured data, the relation between thermal conductivity and load current was obtained.
Go to article

Abstract

The cohesion and internal friction angle were characterized as quadratic functions of strain and were assumed to follow the Mohr-Coulomb criterion after the yield of peak strength. These mechanical parameters and their variations in post-peak softening stage can be exactly ascertained through the simultaneous solution based on the data points of stress-strain curves of triaxial compression tests. Taking the influence of the fault into account, the variation of strata pressure and roadway convergence with coal advancement, the temporal and spatial distribution of axial bolt load were numerically simulated by FLAC3D (Fast Lagrangian Analysis of Continua) using the ascertained post-peak mechanical parameters according to the cohesion weakening and friction strengthening model. The change mechanism of axial load of single rock bolt as abutment pressure changes was analyzed, through the comparison analysis with the results of axial bolt load by field measurements at a coal mine face. The research results show that the simulated results such as the period of main roof weighting, temporal and spatial distribution of axial bolt load are in accordance with field measurement results, so the validity of the numerical model is testified. In front of the working face, the front abutment pressure increases first and then decreases, finally tends to be stable. A corresponding correlation exists between the variation of axial bolt load and rock deformation along the bolt body. When encountered by a fault, the maximum abutment pressure, the influential range of mining disturbance and the roadway convergence between roof and floor before the working face are all increased. In the roadways along the gob, axial bolt loads on the side of the working face decrease, while the other side one increases after the collapse of the roof. As superficial surrounding rock mass is damaged, the anchoring force of rock bolts will transfer to inner rock mass for balancing the tensile load of the bolts.
Go to article

Abstract

Re-design of a given antenna structure for various substrates is a practically important issue yet non trivial, particularly for wideband and ultra-wideband antennas. In this work, a technique for expedited redesign of ultra-wideband antennas for various substrates is presented. The proposed approach is based on inverse surrogate modeling with the scaling model constructed for several reference designs that are optimized for selected values of the substrate permittivity. The surrogate is set up at the level of coarse-discretization EM simulation model of the antenna and, subsequently, corrected to provide prediction at the high-fidelity EM model level. The dimensions of the antenna scaled to any substrate permittivity within the region of validity of the surrogate are obtained instantly, without any additional EM simulation necessary. The proposed approach is demonstrated using an ultra-wideband monopole with the permittivity scaling range from 2.2 to 4.5. Numerical validation is supported by physical measurements of the fabricated prototypes of the re-designed antennas.
Go to article

Abstract

The paper analyzes the prospects for the formation and implementation of digital data transmission technologies on railways of Kazakhstan, taking into account the potential for the development of high-speed railway transport (HSRWT), as well as new approaches for solving the development problems of advanced automated dispatch control systems (ADCS). It was shown that the solution of these problems is possible by automatization of the train traffic coordination based on the use of the potential of the GPRS data transmission technology. The work further developed models and algorithms used in ADCS of the railway transport. There has been carried out the formalization of the tasks of navigation data transmission for ADCS and for the subsystems of the railway rolling stock movement coordination, including HSRWT using GPRS data transmission technology. Also, the article describes a modernized algorithm for simulation of the GPRS channels operation in ADCS. The proposed algorithm differs from the existing ones by the ability to make predictive estimates for determination of the railway rolling stock location. Also, the developed algorithm provides opportunities for coordination of the trains movement, taking into account the optimization of the GPRS resources use.
Go to article

Abstract

This paper presents a simplified modeling, simulation and Experimental analysis of permanent magnet brushless dc motors (PMBLDC) for sensorless operation. This model provides a mechanism for monitoring and controlling of voltage, current, Speer and torque. The sensorless scheme employs direct back emf based zero crossing detection for controlling the dynamic characteristics.
Go to article

This page uses 'cookies'. Learn more