Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 539
items per page: 25 50 75
Sort by:

Abstract

This article presents the use of a multi-criterion Analytic Hierarchy Process (AHP) method to assess geological and mining condition nuisance in longwall mining operations in selected coal mines in Poland. For this purpose, a methodology has been developed which was used to calculate the operational nuisance indicator (WUe) in relation to the cost of mining coal in individual longwalls. Components of the aggregate operational nuisance indicator include four sub-indicators: the natural hazards indicator (UZN), an indicator describing the seam parameters (UPZ), an indicator describing the technical parameters (UT) and an environmental impact indicator (UŚ). In total, the impact of 28 different criteria, which formed particular components of the nuisance indicators were analysed. In total 471 longwalls in 11 coal mines were analysed, including 277 longwalls that were mined in the period of 2011 to 2016 and 194 longwalls scheduled for exploitation in the years 2017 to 2021. Correlation analysis was used to evaluate the relationships between nuisance and the operating costs of longwalls. The analysis revealed a strong correlation between the level of nuisance and the operating costs of the longwalls under study. The design of the longwall schedule should therefore also take into account the nuisance arising from the geological and mining conditions of the operations. Selective operations management allows for the optimization of costs for mining in underground mines using the longwall system. This knowledge can also be used to reduce the total operating costs of mines as a result of abandoning the mining operations in entire longwalls or portions of longwalls that may be permanently unprofitable. Currently, underground mines do not employ this optimization method, which even more emphasizes the need for popularizing this approach.
Go to article

Abstract

The paper presents a new geotechnical solution indicating a possibility of effective building structures protection. The presented solutions enable minimization of negative effects of underground mining operations. Results of numerical modelling have been presented for an example of design of preventive ditches reducing the influence of mining operations on the ground surface. To minimize the mining damage or to reduce its reach it is reasonable to look for technical solutions, which would enable effective protection of building structures. So far authors concentrated primarily on the development of building structure protection methods to minimize the damage caused by the underground mining. The application of geotechnical methods, which could protect building structures against the mining damage, was not considered so far in scientific papers. It should be noticed that relatively few publications are directly related to those issues and there are no practical examples of effective geotechnical protection. This paper presents a geotechnical solution indicating a possibility of effective protection of building structures. The presented solutions enable minimization of negative effects of underground mining operations. Results of numerical modelling have been presented for an example of design of preventive ditches reducing the influence of mining operations on the ground surface. The calculations were carried out in the Abaqus software, based on the finite element method.
Go to article

Abstract

This article describes stability issues of main excavations in deep copper mines in Poland, from the perspective of mining work safety. To protect main transportation and ventilation routes, parts of rock are left untaken to form so-called protective pillars. The problem was to determine the size of main excavations protective pillars in deep underground copper mines in which provide stability of main excavations. The results of numerical simulations of the stability of protective pillars under specific geological and mining conditions are presented, covering: underground depth and width of protective pillar, number, size and layout geometry of protected excavations, as well as the impact of parameters of surrounding gob areas. Problem was solved applying numerical simulations based on the finite element method which were performed in a plane state of strain by means of Phase2 v. 8.0 software. The behavior of the rock mass under load was described by an elastic-plastic model. The Mohr-Coulomb criterion was used to assess the stability of the rock mass. The results of numerical modeling have practical applications in the designing of protective pillars primarily in determining their width. These results were used to prepare new guidelines for protective pillars in Polish copper mines in the Legnica-Glogow Copper District.
Go to article

Abstract

Lower Carboniferous limestone has been extracted in the “Czatkowice” open-pit hill-slope quarry in southern Poland since 1947, for the needs of metallurgical and building industries, as well as farming. We can distinguish two aquifers in the Czatkowice area: the Quaternary porous aquifer and the Carboniferous fissure-porous one. Two vertical zones representing different hydrodynamic characteristics can be indentified in the Carboniferous formations. One is a weathering zone and the other one the zone of fissures and interbedding planes. Groundwater inflows into the quarry workings have been observed at the lowest mining level (+315 m above the sea level (asl)) for over 30 years. This study concerns two hypotheses of the sources of such inflows originating either from (a) the aeration zone or from (b) the saturation zone. Inflows into the quarry combine into one stream flowing gravitationally to the doline under the pile in the western part of the quarry. This situation does not cause a dewatering need. Extending eastward mining and lowering of the exploitation level lead to increased inflows.
Go to article

This page uses 'cookies'. Learn more