Search results

Filters

  • Journals
  • Date

Search results

Number of results: 4
items per page: 25 50 75
Sort by:

Abstract

The tests reported in this paper were carried out to evaluate the exposure of soldiers to noise at operator and control positions during military field exercises. The tests were conducted during firing from a T-72 tank, a BWP-1 Infantry Fighting Vehicle, antitank guided missiles, a ZU-23-2K anti-aircraft gun, and a 2S1 GOZDZIK howitzer. The evaluation of noise exposure showed that the limit values of sound pressure level, referred to by both Polish occupational noise protection standards and the Pfander and Dancer hearing damage risk criteria developed for military applications, were repeatedly exceeded at the tested positions. Despite of the use of tank crew headgear, the exposure limit values of sound pressure level were exceeded for the crew members of the T-72 tank, the BWP-1 infantry fighting vehicle, and the 2S1 GOZDZIK howitzer. The results show that exposure of soldiers to noise during military field exercises is a potentially high hearing risk factor.
Go to article

Abstract

The main goal of this work is to show the new approach to determining safety technological levels (SLs) in terms of water quality and its chemical stability, as well as issues of water corrosion properties in water distribution systems (WDSs), due to the fact that water supply pipes are prone to corrosion. In the paper the methodology of determining the risk associated with threat to technical infrastructure was considered. The concept was studied on the basis of real operational data from the water treatment plant. The probability of exceeding the individual parameters for WTPI is slightly larger than for WTPII, which means that this water treatment process may cause lack of chemical stability in the water supply network. Operators should anticipate in the process of designing water distribution system, using proper materials, as to ensure an adequate level of safety from the water source to the water recipient. It should be noted that it is necessary to adjust the material of internal installation of water supply networks to the parameters of the water. At present, there are no correlations between the designing step and water parameters. It was concluded that to protect the water supply infrastructure, which belongs to critical infrastructure, water company should put more emphasis on distribution of stable water that has not potentially corrosion properties. Some suggestions were made for the protection of WDS and to ensure safety of system functioning and long-term usability of water pipes.
Go to article

Abstract

The difficulty of innovation risk assessment makes it necessary to use a multi-criteria analysis. Innovative projects are related to unstructured problems and the uncertainty, therefore, the use of fuzzy logic in the innovation risk assessment is analyzed. This paper proposes a method of determining the weights of criteria in order to innovation risk assessment. The weights are determined by 5 general criteria and 14 detailed criteria of innovation risk assessment. The proposed method is an extension of the fuzzy AHP method. The extension consists in taking into consideration the group decision-making approach with experts’ psychological conditions. The groups of experts have been chosen based on an elaborated form. The form makes it possible to characterize the persons within the scope of different psychological conditions. The proposed method provides objective and rational decision-making. The paper presents also a comparison of results with the fuzzy AHP method without the group decision making. The weights obtained by the proposed method are more diversified and bring out the most important criteria.
Go to article

This page uses 'cookies'. Learn more