Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 1
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

Ground settlement during and after tunnelling using TBM results in varying dynamic and static load action on the geo-stratum. It is an undesirable effect of tunnel construction causing damage to the surface and subsurface infrastructure, safety risk, and increased construction cost and quality issues. Ground settlement can be influenced by several factors, like method of tunnelling, tunnel geometry, location of tunnelling machine, machine operational parameters, depth & its changes, and mileage of recording point from starting point. In this study, a description and evaluation of the performance of the arti?cial neural network (ANN)was undertaken and a comparison with multiple linear regression (MLR) was carried out on ground settlement prediction. The performance of these models was evaluated using the coefficient of determination R2, root mean square error (RMSE) and mean absolute percentage error (MAPE). For ANN model, the R2, RMSE and MAPE were calculated as 0.9295, 4.2563 and 3.3372, respectively, while for MLR, the R2, RMSE and MAPE, were calculated as 0.5053, 11.2708, 6.3963 respectively. For ground settlement prediction, bothANNandMLRmethodswere able to predict significantly accurate results. It was further noted that the ANN performance was higher than that of the MLR.
Go to article

Authors and Affiliations

Baoping Zou
1
ORCID: ORCID
Musa Chibawe
1
ORCID: ORCID
Bo Hu
1
ORCID: ORCID
Yansheng Deng
1
ORCID: ORCID

  1. School of Civil Engineering and Architecture, Zhejiang University of Science and Technology, Hangzhou 310023, China

This page uses 'cookies'. Learn more