Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The dynamic characteristics of the hydraulic leg are essential for determining the safe working range of roof supports operating in seams threatened by rock mass tremors. The systematic increase in the support of the hydraulic legs due to deteriorating geological-mining conditions has increased their diameters, which currently exceed 0.32 m for the 1st hydraulic stage. Evaluation of the dynamic properties of the roof support and the hydraulic legs are carried out by the Central Mining Institute through calculation methods as an implementation of the Regulation of the Minister of Energy on occupational safety and health. However, the issue of validating the calculations concerning natural scale studies still needs to be addressed. There are significant limitations in this area due to the technical and metrological capabilities of the testing stations. This paper presents an attempt to evaluate bench testing of a hydraulic leg with 0.32 m of the 1st hydraulic stage diameter for the validation of computational and test methods. Results of previous studies affecting the evaluation of the research methods used are also cited. According to the authors, the optimal and economically justifiable direction is to undertake model tests using numerical analyses and to validate these results, based on the study of models of hydraulic legs that are in use at a reduced scale. The construction of testing stations to ensure adequate dynamic loading for the support of the largest diameter hydraulic legs is currently not economically viable. The problem presented, however, is important given the constantly deteriorating geological-mining conditions and the associated threat of rock mass tremors.
Go to article

Authors and Affiliations

Kazimierz Stoiński
1
ORCID: ORCID
Marek Płonka
1
ORCID: ORCID
Janina Świątek
1
ORCID: ORCID

  1. Central Mining Institute (GIG ), 1 Gwarków Sq., 40-166 Katowice, Poland
Download PDF Download RIS Download Bibtex

Abstract

The stability of longwall mining is one of the most important and the most difficult aspects of underground coal mining. The loss of longwall stability can threaten lives, disrupt the continuity of the mining operations, and it requires significant materials and labour costs associated with replacing the damages. In fact, longwall mining stability is affected by many factors combined. Each case of longwall mining has its own unique and complex geological and mining conditions. Therefore, any case study of longwall stability requires an individual analysis. In Poland, longwall mining has been applied in underground coal mining for years. The stability of the longwall working is often examined using an empirical method. A regular longwall mining panel (F3) operation was designed and conducted at the Borynia-Zofiówka-Jastrzębie (BZJ) coal mine. During its advancement, roof failures were observed, causing a stoppage. This paper aims to identify and determine the mechanisms of these failures that occurred in the F3 longwall. A numerical model was performed using the finite difference method - code FLAC2D, representing the exact geological and mining conditions of the F3 longwall working. Major factors that influenced the stability of the F3 longwall were taken into account. Based on the obtained results from numerical analysis and the in-situ observations, the stability of the F3 longwall was discussed and evaluated. Consequently, recommended practical actions regarding roof control were put forward for continued operation in the F3 longwall panel.
Go to article

Authors and Affiliations

Phu Minh Vuong Nguyen
1
ORCID: ORCID
Sylwester Rajwa
1
ORCID: ORCID
Marek Płonka
1
ORCID: ORCID
Waldemar Stachura
2

  1. Central Mining Institute (GIG), 1 Gwarków Sq., 40-166 Katowice, Poland
  2. Jastrzębska Spółka Węglowa SA, Poland

This page uses 'cookies'. Learn more