Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

Influenced by the dynamic pressure of the front abutment pressure and the lateral abutment pressure, large deformation of surrounding rock occurs advancing working face in the entry heading adjacent to the active longwall mining face. Based on the cause analysis of entry large deformation, a new technology was put forward to solve the problem, and the designing method of drilling hole parameters for directional hydraulic fracturing was formed. Holes are drilled in the entry or in the high drainage entry to a certain rock layer over the adjacent working face, hydraulic cutting or slotting at the bottom of a borehole were also applied in advance to guide the hydraulic fractures extend in expected direction, through which the hard roof above the coal pillar can be cut off directionally. As a result, the stress concentration around the entry was transferred, and the entry was located in a destressing area. The field test at Majialiang coal mine indicates that the propagation length of cracks in single borehole is more than 15 m. After hydraulic fracturing, the large deformation range of the entry is reduced by 45 m, the average floor heave is reduced by 70%, and the average convergence of the entry’s two sides is reduced by 65%. Directional hydraulic fracturing has a better performance to control the large deformation of the dynamic pressure of the entry heading adjacent to the advancing coal face. Besides, it can improve the performance of the safety production.

Go to article

Authors and Affiliations

Bingxiang Huang
Xinglong Zhao
Jian Ma
ORCID: ORCID
Tianyuan Sun

This page uses 'cookies'. Learn more