Abstract

The paper presents the problem of building disturbances, which are usually an inseparable element during the implementation of construction projects. They were classified, their causes and sides of the construction process responsible for their creation were identified on the basis of the analyzed construction investment. In addition, using the Earned Value Management method, the scale of delays arising in construction works and the related effects were determined. The important role of close cooperation and good communication between all participants of the construction process was emphasized, which would reduce the phenomenon of building disturbances, but also mitigate the negative effects of delays that have already occurred.

Go to article

Authors and Affiliations

A. Starczyk-Kołbyk
L. Kruszka
Download PDF Download RIS Download Bibtex

Abstract

In pursuing numerous construction projects, investors and contractors regularly face construction delay problems, many of which are likely to have been avoidable. There is found that payment delays and project delays are the two most critical effects of risk factors of construction management. The paper presents the practical application of the Earned Value Management method, which was used to estimate the possible extension of the duration of construction works during which realization disturbances occurred on the example of selected construction investment. The realization disturbances are usually an inseparable element in the implementation of construction works. They are the result of, among others: additional works, changes or design defects, as well as a badly adopted logistics strategy regarding the supply of construction materials. Delays or increasing the total cost of investment is a problem often encountered in the implementation of construction investments, despite advanced construction technologies, including system technologies and proven tools supporting the management of the construction process. The EVM method is used to control investments. It allows you to control delays and acceleration of construction works as well as to estimate their cost and completion date. In the analyzed case it was used to determine the scale of delays arising in construction works and related effects with the specification of the participation of individual participants of the investment process for delays. This paper is a continuation and supplementation of the research presented in the article: “The influence of construction works disturbances on the EVM analysis outcomes – case study” [23].
Go to article

Bibliography


[1] N. Kongchasing, and G. Sua-Iam, “The major causes of construction delays identified using the Delphi technique: perspectives of contractors and consultants in Thailand”. Int J Civ Eng (2020). https://doi.org/10.1007/s40999-020-00575-8.
[2] K. Park, H.W. Lee, K. Choi, et al., “Project Risk Factors Facing Construction Management Firms”. Int J Civ Eng 17, pp. 305–321 (2019). https://doi.org/10.1007/s40999-017-0262-z
[3] ANSI EIA – 748 Standard – Earned Value Management Systems.
[4] K. Araszkiewicz, and M. Bochenek, “Control of construction projects using the Earned Value Method – case study”, Open Engineering 9 (2019), pp. 186–195. https://doi.org/10.1515/eng-2019-0020
[5] M. Bilal, L.O. Oyedele, H.O. Kusimo, H.A. Owolabi, L.A. Akanbi, A.O. Ajayi, O.O. Akinade, and J.M.D. Delgado, “Investigating profitability performance of construction projects using big data: A project analytics approach”, Journal of Building Engineering, 26 (2019). https://doi.org/10.1016/j.jobe.2019.100850
[6] D.W.M. Chan, T. O. Olawumi, and A. M.L. Ho, “Perceived benefits of and barriers to Building Information Modelling (BIM) implementation in construction: The case of Hong Kong”, Journal of Building Engineering, 25 (2019). https://doi.org/10.1016/j.jobe.2019.100764
[7] R. Charef, S. Emmitt, H. Alaka, and F. Fouchal, (2019). “Building Information Modelling adoption in the European Union: An overview”. Journal of Building Engineering, 25, (2019). https://doi.org/10.1016/j.jobe.2019.100777
[8] T. Chen et al, “How do project management competencies change within the project management career model in large Chinese construction companies?”, International Journal of Project Management, 37 (2019), pp. 485–500. https://doi.org/10.1016/j.ijproman.2018.12.002
[9] U. Dwivedi, “Earned Value Management Explained”, 2019 Project Smart reserved, https://www.projectsmart.co.uk/earned-value-management-explained.php
[10] F. Elghaish, S. Abrishami, M. RR. Hosseini, S. Abu-Samra, and M. Gaterell, “Integrated project delivery with BIM: An automated EVM-based approach”, Automation in Construction, 106, (2019). https://doi.org/10.1016/j.autcon.2019.102907
[11] M. Lendo-Siwicka, M. Poloński, and K. Pawluk, “Identification of the interference in the investment process during the realization of a shopping centre – a case study”, Archives of Civil Engineering, LXII (2016), pp. 159–172. https://doi.org/10.1515/ace-2015-0058
[12] L. Lin, R. Müller, F. Zhu, and H. Liu, “Choosing suitable project control modes to improve the knowledge integration under different uncertainties”, International Journal of Project Management, 37 (2019), pp. 896–911. https://doi.org/10.1016/j.ijproman.2019.07.002
[13] L. Song, “Earned Value Management: A Global Cross-Industry Perspective on Current EVM Practice”. PMI 2010.
[14] S.T. Matarneha, M. Danso-Amoako, S.T. Matarneh, S. Al-Bizri, M. Gaterell, and R. Matarneh, “Building information modeling for facilities management: A literature review and future research directions”, Journal of Building Engineering, 24 (2019). https://doi.org/10.1016/j.jobe.2019.100755
[15] P. A de Andrade, A. Martens, and M. Vanhoucke, ”Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities”, Automation in Construction, 99 (2019), pp. 68–78. https://doi.org/10.1016/j.autcon.2018.11.030
[16] A. Miguel, W. Madria, and R. Polancos, “Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management”, 6th International Conference on Industrial Engineering and Applications (ICIEA), Tokyo, Japan, 2019, pp. 622–628
[17] N. Moradi, S.M. Mousavi, and B. Vandani, “An earned value model with risk analysis for project management under uncertain conditions”, Journal of Intelligent & Fuzzy Systems, 32 (2017), pp. 97–113. https://doi.org/10.3233/JIFS-151139
[18] S.A. Mubarak, “Construction Project Scheduling and Control”. John Wiley & Sons, 2015.
[19] M. Oraee, M.R. Hosseini, D.J. Edwards, H. Li, E. Papadonikolaki, and D. Cao, “Collaboration barriers in BIM-based construction networks: A conceptual model”, International Journal of Project Management, 37 (2019), pp. 839–854. https://doi.org/10.1016/j.ijproman.2019.05.004
[20] E. Papadonikolaki, C. van Oel, and M. Kagioglou, “Organising and Managing boundaries: A structurational view of collaboration with Building Information Modelling (BIM)”, International Journal of Project Management, 37 (2019), pp. 378–394. https://doi.org/10.1016/j.ijproman.2019.01.010
[21] P. Piroozfar, E. R.P. Farr, A.H.M. Zadeh, S.T. Inacio, S. Kilgallone, and R. Jin, “Facilitating Building Information Modelling (BIM) using Integrated Project Delivery (IPD): A UK perspective”, Journal of Building Engineering, 26 (2019). https://doi.org/10.1016/j.jobe.2019.100907
[22] B. Roseke, “The Earned Value Method”. https://www.projectengineer.net/the-earned-value-method/
[23] A. Starczyk-Kołbyk, and L. Kruszka, “The influence of construction works disturbances on the EVM analysis outcomes – case study”, Archives of Civil Engineering, LXVI (2020), pp. 161–177. https://doi.org/10.24425/ace.2020.131781
[24] A. Webb, “Using Earned Value – a project manager guide”. Gower Publishing, Ltd., 2003.
Go to article

Authors and Affiliations

Anna Starczyk-Kołbyk
1
ORCID: ORCID
Leopold Kruszka
2
ORCID: ORCID

  1. Military University of Technology, Faculty of Civil Engineering and Geodesy, ul. gen. Sylwestra Kaliskiego 2, 00–908 Warsaw, Poland
  2. Military University of Technology, Faculty of Civil Engineering and Geodesy, ul. gen. Sylwestra Kaliskiego 2,00–908 Warsaw, Poland
Download PDF Download RIS Download Bibtex

Abstract

The Randomized Earned Value Method enable to control the time and cost of works during the implementation of a construction project. The method allows to assess the compliance of the current advancement in time and actually incurred costs with the adopted plan. It also allows to predict the date and amount of the project completion costs. Individual assessment indicators (BCWS, BCWP, ACWP) are calculated after the ongoing control of the progression of works. In the case of randomly changing of implementation conditions, the calculated in this way values of the indicators may be unacceptable because of overlarge differences in comparison to actual values. Therefore, it is proposed an EVM enhancement and additional risk conditions analysis. In this approach data from the quantity survey of works are randomized based on analysis of variations between actually measured and planned values of duration and cost of implemented works. It is estimated the randomized values of individual indicators after successive controls of the progress of works. After each project advancement control the duration and cost of the works that remain to be performed are estimated. Moreover, new verified overall time and total cost of the project implementation are also estimated. After the last inspection, randomized values of the final date and total cost of completion of the project are calculated, as well as randomized values of time extension and total cost overrun. Of course, for randomized values, standard deviations of individual quantities are calculated. Therefore, the risk of time and the risk of cost of the project implementation are presented in the risk charts. The proposed approach provides a better assessment of the progress of works under risk conditions. It is worth to add that the method does not require significant changes to the typical construction management process, however, it ensures realistic consideration of the influence of random factors on the course and results of individual works and the entire project.
Go to article

Authors and Affiliations

Tadeusz Kasprowicz
1
ORCID: ORCID
Anna Starczyk-Kołbyk
1
ORCID: ORCID

  1. Military University of Technology, Faculty of Civil Engineering and Geodesy, ul. gen. Sylwestra Kaliskiego 2, 00–908 Warsaw, Poland
Download PDF Download RIS Download Bibtex

Abstract

The REVM method is a modernized option of classical EVM method. The new method has been developed for applying in unstable condition of works implementation. When the works can be accidentally disturbed and the impact of random disruption factors on course and results of works must be taken into consideration. Next, Randomized Budgeted Duration to Completion and Randomized Budgeted Cost to Completion that is duration and cost of works remaining to execution after each inspection, as well as the Randomized Budgeted Duration at Completion and Randomized Budgeted Cost at Completion that is duration and cost of all works of the project completion after the site inspection. Moreover, the risk of durations and costs overrun of works are evaluated. It is important that input data required for the REVM method are the similar and are measured in the same way as in typical control of advancement works. But results of the application consist new decision information. Control of the investment under deterministic conditions, without taking into account the risk of disruptions, resulted in a final deviation from the planned budget of over 7%, and from the planned completion of the investment by almost 12%. Without analysing the factor related to disruptions at the investment implementation stage, the material and financial schedule was completely outdated. On the other hand, when controlling the investment under risk conditions and introducing organizational and technological changes adequate to the inspection reports, the final deviation from the planned budget was less than 2%, and slightly more than 2% from the planned completion date. Researches confirm that the results received by using the REVM method well reflect real situation of works implementation.
Go to article

Authors and Affiliations

Tadeusz Kasprowicz
1
ORCID: ORCID
Anna Starczyk-Kołbyk
1
ORCID: ORCID

  1. Military University of Technology, Faculty of Civil Engineering and Geodesy, ul. gen. Sylwestra Kaliskiego 2, 00–908 Warsaw, Poland