Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

In this work we consider a problem from the field of power- and energy-aware scheduling, in which a set of batteries have to be charged in a minimum time. The formulated problem is to schedule independent and nonpreemptable jobs to minimize the schedule length, where each job requires some amount of power and consumes a certain amount of energy during its processing. We assume that the power demand of each job linearly decreases with time, as it is the case when Li-ion batteries are being charged. For the assumed job model we prove that each next job should be started as soon as the required amount of power is available. Basing on the proven theorem we formulate a procedure generating a minimum-length schedule for an assumed order of jobs. We also analyze the case of identical jobs, and show some interesting properties of this case.

Go to article

Authors and Affiliations

R. Różycki
G. Waligóra
J. Węglarz

This page uses 'cookies'. Learn more