Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 4
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

Current methods of fault diagnosis for the grounding grid using DC or AC are limited in accuracy and cannot be used to identify the locations of the faults. In this study, a new method of fault diagnosis for substation grounding grids is proposed using a square-wave. A frequency model of the grounding system is constructed by analyzing the frequency characteristics of the soil and the grounding conductors into which two different frequency square-wave sources are injected. By analyzing and comparing the corresponding information of the surface potentials of the output signals, the faults of the grounding grid can be diagnosed and located. Our method is verified by software simulation, scale model experiments and field experiments.

Go to article

Authors and Affiliations

Peng-He Zhang
Jun-Jia He
Dan-Dan Zhang
Lan-Min Wu
Download PDF Download RIS Download Bibtex

Abstract

In this paper, a creative dung beetle optimization (CDBO) algorithm is proposed and applied to the offline parameter identification of permanent magnet synchronous motors. First, in order to uniformly initialize the population state and increase the population diversity, a strategy to improve the initialization of the dung beetle population using Singer chaotic mapping is proposed to improve the global search performance; second, in order to improve the local search performance and enhance the convergence accuracy of the algorithm, a new dung beetle position update strategy is designed to increase the spatial search range of the algorithm. Simulation results show that the proposed optimization algorithm can quickly and accurately identify parameters such as resistance, inductance, and magnetic chain of the PMSM, with significant improvements in convergence algebra, identification accuracy and stability.
Go to article

Authors and Affiliations

Xiaoliang Yang
1 2
ORCID: ORCID
Yuyue Cui
1 2
Lianhua Jia
3
Zhihong Sun
3
Peng Zhang
3
ORCID: ORCID
Jiane Zhao
4
Rui Wang
1 2
ORCID: ORCID

  1. School of Electrical and Information Engineer, Zhengzhou University of Light Industry, Zhengzhou, China
  2. Henan Key Lab of Information based Electrical Appliances, Zhengzhou, China
  3. China Railway Engineering Equipment Group Co. Ltd, Zhengzhou, China
  4. School of Electrical and Electronic Engineering, Zhengzhou University of Science and Technology, Zhengzhou, China
Download PDF Download RIS Download Bibtex

Abstract

The running speed of high-speed trains in the tunnel is as high as 350 km, which is very sensitive to the construction disturbance of the new shield tunnel. Therefore, it is of positive significance to study the influence of shield tunneling on existing high-speed railway lines and tunnel structures and control standards. Combined with centrifuge test and three-dimensional numerical simulation, the dynamic response of shield tunnel undercrossing existing high-speed railway tunnel is studied, and the influence of settlement joint and steel pipe pile reinforcement on existing tunnel is analyzed. Studies have shown that the existence of existing tunnels will reduce the surface settlement caused by tunnel excavation, but this shielding effect will be reduced if the influence of construction joints is considered. Therefore, if the construction joint is not considered in the numerical calculation, the ground deformation will be underestimated and the mechanical performance of the existing tunnel structure will be overestimated. In addition, steel pipe piles can effectively control the settlement of existing tunnels.
Go to article

Authors and Affiliations

Ruizhen Fei
1 2
ORCID: ORCID
Limin Peng
1
ORCID: ORCID
Chunlei Zhang
2
ORCID: ORCID
Jiqing Zhang
2
ORCID: ORCID
Peng Zhang
2
ORCID: ORCID

  1. Central South University, School of Civil Engineering, Changsha, 410075, China
  2. China Railway Design Corporation, Tianjin, 300142, China
Download PDF Download RIS Download Bibtex

Abstract

In order to study the ground disturbance and the influence relationship between the two tunnels during the construction of the new shield tunnel undercrossing the existing high-speed railway tunnel, the centrifuge test was used to simulate the construction of the parallel shield tunnel undercrossing the high-speed railway tunnel, and the variation law of the internal force, segment deformation and surface settlement of the existing high-speed railway tunnel undercrossing the shield was studied. It is found that the adverse effects caused by the later tunnel are less than those caused by the first tunnel excavation. For the existing tunnels without settlement joints, the longitudinal settlement of the inverted arch and the vault is U-shaped and anti-U-shaped respectively. The settlement value of the ground surface and the existing tunnel is increased by more than 100%. When the shield passes through the high-speed railway tunnel, the transverse bending strain is larger than the longitudinal, and special attention should be paid at the corner.
Go to article

Authors and Affiliations

Ruizhen Fei
1 2
ORCID: ORCID
Limin Peng
1
ORCID: ORCID
Chunlei Zhang
2
ORCID: ORCID
Jiqing Zhang
2
ORCID: ORCID
Peng Zhang
2
ORCID: ORCID

  1. Central South University, School of Civil Engineering, Changsha, 410075, China
  2. China Railway Design Corporation, Tianjin, 300142, China

This page uses 'cookies'. Learn more