Wyniki wyszukiwania

Filtruj wyniki

  • Czasopisma
  • Data

Wyniki wyszukiwania

Wyników: 1
Wyników na stronie: 25 50 75
Sortuj wg:

Abstrakt

The aim of the presented work was to examine the reliability assessment model on the example of a selected power grid object. The analyzed object was tested based on assumptions about technological breaks that were caused by overvoltage, among others. The study was conducted to check the reliability of integral elements of the power grid object and to assess the change in reliability level as a function of the frequency of inspections. The test results are to determine the optimal frequency of inspections of individual power grid objects in order to increase its reliability. In addition, the possibility of correlating optimal inspection periods resulting from the findings of this paper with periodic inspections of power network facilities was assessed.

Przejdź do artykułu

Autorzy i Afiliacje

M. Borecki
M. Ciuba
Y. Kharchenko
Y. Khanas

Ta strona wykorzystuje pliki 'cookies'. Więcej informacji