Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 1
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The continuous improvement in the industries and organizations hinges upon the evaluation of their performance. In fact, the performance evaluation assists organizations to identify their strengths and weaknesses and, accordingly, enhance their efficiency. As soon as the concept of sustainability was propounded in the engineering based industries, the performance evaluation got more importance due to the environmental issues and social concerns along with the economical aspects. Therefore, this paper is an attempt to propose an approach based on fuzzy best-worst method (BWM) and fuzzy inference system (FIS) in order to evaluate the performance of an Iranian steel complex in terms of sustainability concept. In the proposed approach, the weights of some selected criteria were determined by fuzzy BWM method and, then, the score of the under study industry was calculated in terms of economic, environmental, and social aspects. At the end, an FIS was developed to calculate the final score of the intended industry. In order to check the efficiency of the proposed approach, its performance was measured using expert knowledge as well as real data of a steel complex in Iran. A moderate to high performance has been achieved for the understudy case through conducting the proposed approach. It was suggested that the industry should focus on the criteria with both high weights and low evaluated scores (for example the environmental management technologies and knowledge criterion) to increase its performance evaluation score. The obtained results were indicative of the efficiency of the proposed approach.

Go to article

Authors and Affiliations

Mehdi Pezeshkan
Navid Hosseini

This page uses 'cookies'. Learn more