Abstract

This paper presents simulation results of the consolidation process of the flotation waste landfill “Żelazny Most”. The mathematical model used in presented research is based on Biot’s model of consolidation and is extended with rheological skeleton. The load is the mass pressure of the landfill itself. The initial point selected for calculations was based on the ground water level calculated in a landfill. The creeping process in this waste landfill was analyzed along the north – south section. The solution is therefore 2D with the assumption of a plane strain state. Effective model parameters data were obtained in laboratory tests on the material from the waste landfill. Results obtained for a stress state in a storage state can help to determine whether the adopted linear model of visco-elastic medium does not lead to changes in the Coulomb – Mohr potential yield, showing the emergence of plasticity of material storage areas.

Go to article

Authors and Affiliations

T. Strzelecki
M. Bartlewska-Urban
Download PDF Download RIS Download Bibtex

Abstract

The subject of the research is one of the largest World’s mine tailings disposal sites, i.e. Żelazny Most in the Legnica-Głogów Copper Mining District (south-western Poland), where flotation tailings are poured out after copper ore treatment. The protective hydraulic barrier made of 46 vertical drainage wells was characterized and evaluated in view of reduction of major contaminants (Cl, Na, SO4, Ca) migrating from the facility to its foreground. The efficiency of groundwater protection was determined on the basis of a new approach. In applied method the loads of characteristic and commonly recognizable compounds, i.e. salt (NaCl) and gypsum (CaSO4) were calculated, instead their chemical components. The temporal and spatial variability of captured main contaminants loads as well as its causes are discussed. The paper ends with the results of efficiency analyses of the barrier and with respect to the predicted increase in contaminant concentrations in the pulp poured out to the tailings site.
Go to article

Authors and Affiliations

Robert Duda
Download PDF Download RIS Download Bibtex

Abstract

The hydraulic fill method of erecting dams was characterized. The main assumptions and practical aspects of sand spigot were discussed on the example of the spigot of the dam body of the Zelazny Most Tailings Storage Facility (TSF). The advantages and disadvantages of the method are discussed, and the directions of attempts to implement pipelines rising along with sedimenting waste are presented, which are to reduce earthworks.
Go to article

Authors and Affiliations

Zbigniew Skrzypczak
1
ORCID: ORCID
Adrian Różański
2
ORCID: ORCID
Irena Bagińska
2
ORCID: ORCID
Robert Pratkowiecki
1
ORCID: ORCID

  1. KGHM Polska Miedz S.A. Oddział Zakład Hydrotechniczny, Polkowicka 52, 59-305 Rudna
  2. Wroclaw University of Technology, Faculty of Civil Engineering, Wybrzeze Wyspianskiego 27, 50-370 Wrocław, Poland

This page uses 'cookies'. Learn more