Abstract

A project scheduling problem investigates a set of activities that have to be scheduled

due to precedence priority and resource constraints in order to optimize project-related

objective functions. This paper focuses on the multi-mode project scheduling problem concerning

resource constraints (MRCPSP). Resource allocation and leveling, renewable and

non-renewable resources, and time-cost trade-off are some essential characteristics which are

considered in the proposed multi-objective scheduling problem. In this paper, a novel hybrid

algorithm is proposed based on non-dominated sorting ant colony optimization and genetic

algorithm (NSACO-GA). It uses the genetic algorithm as a local search strategy in order to

improve the efficiency of the ant colony algorithm. The test problems are generated based on

the project scheduling problem library (PSPLIB) to compare the efficiency of the proposed

algorithm with the non-dominated sorting genetic algorithm (NSGA-II). The numerical result

verifies the efficiency of the proposed hybrid algorithm in comparison to the NSGA-II

algorithm.

Go to article

Authors and Affiliations

Jafar Bagherinejad
Fariborz Jolai
Raheleh Abdollahneja
Mahnaz Shoeib
Download PDF Download RIS Download Bibtex

Abstract

To improve the dynamic adaptability and flexibility of process route during manufacturing, a dynamic optimization method of multi-process route based on improved ant colony algorithm driven by digital twin is proposed. Firstly, on the basis of part manufacturing features analysis, the machining methods of each process are selected, and the fuzzy precedence constraint relationship between machining metas and processes is constructed by intuitionistic fuzzy information. Then, the multi-objective optimization function driven by digital twin is established with the optimization objectives of least manufacturing cost and lowest carbon emission, also the ranking of processing methods is optimized by an improved adaptive ant colony algorithm to seek the optimal processing sequence. Finally, the transmission shaft of some equipment is taken as an engineering example forverification analysis, which shows that this method can obtain a process route that gets closer to practical production.
Go to article

Authors and Affiliations

Zhaoming Chen
Jinsong Zou
Wei Wang
ORCID: ORCID

This page uses 'cookies'. Learn more