The main scope of the article is the development of a computer system, which should give advices at problem of cooper alloys
manufacturing. This problem relates with choosing of an appropriate type of bronze (e.g. the BA 1044 bronze) with possible modification
(e.g. calcium carbide modifications: Ca + C or CaC2) and possible heat treatment operations (quenching, tempering) in order to obtain
desired mechanical properties of manufactured material described by tensile strength - Rm, yield strength - Rp0.2 and elongation - A5. By
construction of the computer system being the goal of presented here work Case-based Reasoning is proposed to be used. Case-based
Reasoning is the methodology within Artificial Intelligence techniques, which enables solving new problems basing on experiences that
are solutions obtained in the past. Case-based Reasoning also enables incremental learning, because every new experience is retained each
time in order to be available for future processes of problem solving. Proposed by the developed system solution can be used by
a technologist as a rough solution for cooper alloys manufacturing problem, which requires further tests in order to confirm it correctness.
The authors developed the definition of construction defect and fault and construction defect management based on Polish and foreign publications. In order to assist identification of faults and their analysis in the process of home collection, the authors applied the Case Based Reasoning (CBR) method. In the paper, the authors used Case Based Reasoning (CBR) to support acceptance of apartments. The CBR method allows to determine the magnitude of global similarity for the problem under consideration between the new and old case from the Case Base, using weighted sums of local similarities using criteria weights as coefficients. As a result of CBR-based solutions, an Employer’s representative receives information about the type of construction defects that can be expected, their location and significance, occurrence frequency, and estimated repair cost.