Search results

Filters

  • Journals
  • Keywords
  • Date

Search results

Number of results: 3
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The first post-war, comprehensive Gdynia Downtown Plan was at the same time one of the first spatial development plans in Poland defining the directions of transformation of multifunctional downtown structures in the new system and legal realities. It was the Plan of the Polish Breakthrough related to the realities of the downtown area of Gdynia. The study area included the Gdynia Valley limited by the hills of Kamienna Góra, Redłowo and Chylońskie Forests with the development of a complete pre-war city developing in accordance with the fi rst plan of Adam Kuncewicz from 1925 in the zone of 3 km, counted from the center of the inner port. The aim of the plan was to look for centralizing potential in the fi eld of research. This concept was treated as a power degree related to the then existing state, as well as the possibility of further development or transformation.

Go to article

Authors and Affiliations

Barbara Bańkowska
Download PDF Download RIS Download Bibtex

Abstract

This paper presents a synthesis of research in the field of social activity in development of urban public spaces. Interest in social participation in which many groups sees a remedy to the problems of the city - including spatial chaos - has many causes. One of them is the lack of trust in the social side to the profession of architecture. The article indicates the possible cause of this state for which it was flawed legislation and the planning system, which in practice is not conducive to the formation of order, harmony and beauty, but facilitate the implementation of the narrow groups of interests, bringing the rank of designer as creator of the role of the investor's decision executor.

Go to article

Authors and Affiliations

Miłosz Zieliński
ORCID: ORCID
Download PDF Download RIS Download Bibtex

Abstract

During the 1920s and 1930s Gdynia transformed from a small fishing village into a dynamically developing city through the construction in its vicinity of the largest seaport of interwar Poland. The city’s first expansion plan (1926, Adam Kuncewicz, Roman Feliński), designed for approximately 100 000 inhabitants, had to be revised already within a few years because development of the port has proved to be faster and the terrain requirements of the port substantially greater than originally predicted. In effect grounds originally planned for general city functions were yielded to the rapidly developing port. It was not until 2003 when the port boundaries shifted significantly as a result of restrictions and changes in the nature of port activity. These changes freed around 53 ha of post-harbour sites for new development, attractively located in the immediate vicinity of the existing city centre and waterfront. In 2015 the port boundaries shifted again adding 3 ha more of post-harbour sites. The changes also spurred investment in the north of downtown Gdynia – in accordance with the intentions of first city planners. Ideas how to make good use of post-harbour areas have been invented and evolved since 1990s. The concept which is currently under development was prepared in 2008 by the City Planning Offi ce of Gdynia. Since 2010 analyses and studies of future development have been conducted using 3D model. The concept is continuously updated and new details are added based on projects obtained through architectural competitions. Since 2015 development areas of the northern part of the city center were rebranded as Gdynia Sea City. In accordance with this concept Gdynia Sea City will be the modern city centre with areas designed for leisure, relaxation and business and will be inhabited by more than 10 thousand people. The area’s new grid is a continuation of the urban grid of historical downtown Gdynia and draws upon unrealized city plans of the interwar period. The scale of new buildings in the area is reminiscent of the historical buildings in the area. Groups of higher buildings are allowed outside of a protected area of the historic center, in areas selected through view and cityscape analysis. The residential and commercial complex Sea Towers together with two other newly constructed tall buildings is currently the dominant in this area. Several new development complexes are under construction. Planning concepts assume public availability of quays around the port basins and maintaining spacious openings towards the sea. Construction of marinas is expected using part of the docks and the ability to expand and reduce existing wharves, movement of pedestrians and cyclists between Fishermen Pier and South Pier will be facilitated through the construction of a bridge or a ferry connection. The planned enlargement into the post-harbour areas will double the current potential of Gdynia downtown, and enlarge the scope of representative areas and change the panorama from the historic city center and from the sea. Attractive downtown sites can provide an answer to the issue of uncontrolled urban spill into peripheral areas of adjacent municipalities.

Go to article

Authors and Affiliations

Marek Karzyński

This page uses 'cookies'. Learn more