This paper investigates the fact that construction projects, due to their specificity, are complex, temporary and dynamic. Over their course, participants change, successive construction works are done and new information becomes available. This carries over to difficulties in communication. In the literature, numerous studies note the fact that a network-based approach to the analysis and monitoring of communication as a part of complex construction projects is commendable. Relations between agents, knowledge and tasks in the context of communication within a construction project can be visualized in the form of a meta-network, and suitably developed structural measures can be used to analyze them.
In this paper, the authors used meta-network theory to analyze relations between project participants, knowledge and tasks in the context of communication within a construction project, on the basis of the construction of a housing estate located in Katowice, Poland. Meta-network structural analysis allowed for a deeper understanding of these relations and the detection of essential information about the level of communication in the project under investigation, which was a basis for further discussion. The authors also stress the benefits from the approach presented and argue that it should be a starting point for effective management in the sphere of communication in construction companies.
Go to article

Authors and Affiliations

Ewelina Kania
1
ORCID: ORCID
Grzegorz Śladowski
1
ORCID: ORCID
Elżbieta Radziszewska-Zielina
1
ORCID: ORCID
Bartłomiej Sroka
1
ORCID: ORCID

  1. Cracow University of Technology, Faculty of Civil Engineering, ul.Warszawska 24, 31-155 Cracow, Poland
Download PDF Download RIS Download Bibtex

Abstract

The article proposes a new approach to the identification of key agents, knowledge and resources required to complete tasks being performed as a part of construction projects. The author used the concept of meta-networks to model the relations between agents, knowledge, resources and tasks of a project. Up until now, the identification of key means of production employed a measure of performance of the project that was modelled using a metanetwork. However, this measure is limited as it does not take into consideration the significance of individual tasks or the relations between them. The author thus proposed a structural modification of the performance measure for the purposes of identifying key agents, knowledge and resources of a planned project. A case study analysis has confirmed the application potential of the proposed approach. In practice, the results that were obtained can aid planners in evaluating the performance of a project's plan. Information about key agents, knowledge and resources can constitute the basis for drafting alternative plans which would be more resistant to failure due to the possible loss of key means of production over the course of carrying out a project.