Search results

Filters

  • Journals

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The acoustic climate assessment needed for the selection of solutions (technical, legal and organisational), which will help to minimise the acoustic hazards in the analysed areas, is realised on the basis of acoustic maps. The reference computational algorithms, assigned to them, require very thorough preparation of input data for the considered noise source model representing - in the best possible way - the acoustic climate. These input data are burdened with certain uncertainties in this class of computational tasks. The uncertainties are related to the problem of selecting proper argument values (from the interval of their possible variability) for the modelled processes. This situation has a direct influence on the uncertainty of acoustic maps.

The idea of applying the interval arithmetic for the assessment of acoustic models uncertainty is formulated in this paper. The computational formalism assigned to the interval arithmetic was discussed. The rules of interval estimations for the model solutions determining the sound level distribution around the analysed noise source - caused by possible errors in the input data - were presented. The application of this formalism was illustrated in uncertainty assessments of modelling acoustic influences of the railway noise linear source on the environment.

Go to article

Authors and Affiliations

Wojciech Batko
Paweł Pawlik
Download PDF Download RIS Download Bibtex

Abstract

A novel approach for treating the uncertainty about the real levels of finished products during production planning and scheduling process

is presented in the paper. Interval arithmetic is used to describe uncertainty concerning the production that was planned to cover potential

defective products, but meets customer’s quality requirement and can be delivered as fully valuable products. Interval lot sizing and

scheduling model to solve this problem is proposed, then a dedicated version of genetic algorithm that is able to deal with interval

arithmetic is used to solve the test problems taken from a real-world example described in the literature. The achieved results are compared

with a standard approach in which no uncertainty about real production of valuable castings is considered. It has been shown that interval

arithmetic can be a valuable method for modeling uncertainty, and proposed approach can provide more accurate information to the

planners allowing them to take more tailored decisions.

Go to article

Authors and Affiliations

J. Duda
A. Stawowy

This page uses 'cookies'. Learn more