Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 1
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

Improper planning of inventory will affect the factory operating costs, building costs, the cost of loss, and the cost of product defects due to being stored for too long which will eventually become a loss. This research discusses the processing industry which is experiencing lumpy demand. In carrying out the production process, the company has never made plans for future demand, resulting in a waste of message costs due to repeated orders of raw materials ordered to suppliers. This paper contributes to overcoming this issue by simulating future demand by using the Material Requirement Planning (MRP) method with a probabilistic Economic Order Quantity (EOQ) and Periodic Order Quantity (POQ) model. The demand in the coming period is determined using the Autoregressive Integrated Moving Average (ARIMA) method, and an aggregate plan is carried out to determine the regular cost of raw material production and optimal subcontracting. The final analysis states that the calculation of MRP on the selected items using POQ produces the lowest cost for planning S45C-F, SGT-R, and SKD11-R, while SLD-R uses the probabilistic EOQ method.
Go to article

Authors and Affiliations

Filscha Nurprihatin
1
Glisina Dwinoor Rembulan
2
Yohanes Dwi Pratama
2

  1. Department of Industrial Engineering, Sampoerna University, Indonesia
  2. Department of Industrial Engineering, Universitas Bunda Mulia, Indonesia

This page uses 'cookies'. Learn more