Results of fly ashes from combustion of hard coal and co-combustion of alternative fuel (SRF) with coal in the stoker boiler WR-25 type studies have been shown. Samples of fly ashes were acquired during industrial combustion tests of hard coal and blend of coal with 10% SRF. The scope of comparative research included: chemical composition, contents of combustible parts and trace elements and also of microscopic analysis. The specific surface area SBET was established and tests of water extract were conducted. Chemical composition of mineral substance of both studied ashes is similar. Main ingredients are: SiO2, Al2O3, Fe2O3 and CaO. Fly ash from co-combustion of SRF with coal in a stoker boiler is characterized by high contents of combustible parts (on 30% level), higher than ash from hard coal combustion. Both tested ashes are characterized by specifi c surface area SBET on the level of 8–9 m2/g. In porous structure mesopores are dominant (>60%), and their volume is higher for fly ash from co-combustion of SRF with coal. Fly ash from co-combustion of waste is characterized by high contents of heavy metals. Nevertheless these metals and also other pollutants do not show leachability exceeding acceptable values for wastes different than hazardous. The microscopic structure of fly ashes from combustion of hard coal and co-combustion of alternative fuel studies showed crucial differences, especially in reference to organic material. Presented research results have shown that fly ash from co-combustion of SRF with coal in a stoker boiler can obtain the status of non-hazardous waste.
The process of synchronization of synchronous generators and power electronic converters with the power grid may take on quite different forms. This is due to their specific principles of operation and essential differences in energy conversion process. However, since synchronous generators and power converter often operate in the same utility network, coherent rules should be defined for them. Therefore, this paper aims at a formulation of the uniform and consistent interpretation of synchronization with the power grid for both types of aforementioned units. The author starts from the classic interpretation of synchronization for synchronous generators and power electronic converters, considered as micro-generators, specifies their mathematical and numerical models and then performs simulation tests. Selected synchronization algorithms are described in detail. Simulation tests are used for analysis of the elaboration of outcomes. The results of simulation tests are handled to formulate a uniform interpretation of synchronization for the micro-generation systems considered. Based on the results obtained, appropriate parallels are built between the two systems being compared. It is shown that the synchronization processes are identical regardless of the micro-generation unit considered. Nonetheless, they differ significantly due to their properties in transient states. Inverter systems have higher dynamics but their disadvantage lies in the relatively high sensitivity to disturbances and the complex selection process of the synchronization algorithm.
The ILC is an immense e+e- machine planned since 2004 by a large international collaboration, to be potentially built in Japan [1]. The gigantic size of the whole research infrastructure, the involved human, technical and financial resources, and the pressure of new emerging and potentially soon to be competitive accelerator technologies, make the final building decision quite difficult. A vivid debate is carried on this subject globally by involved accelerator research communities. The European voice is very strong and important in this debate, and has recently been essentially refreshed by clear statements in a few official documents [2]. The final HEP European Strategy Document is just under preparation. This paper is a very modest and subjective voice in this debate originating from Poland, which around 50 researchers are present at the list of 2400 signatories for the original ILC TDR document published in 2013 [3].