In case of the private procurement auctions the entrepreneurs are not forced to limit themselves to the standard auction rules, and in practice one can observe many hybrid or quasi-auction mechanisms spontaneously introduced. The paper analyzes two of them, which start as a first-price sealed-bid auction, followed by a run-off in a form of an English auction, and which differ by the transparency of rules concerning the initiation of the second stage. The focus of the paper is on the analysis of the price and allocative efficiency of these mechanisms, in order to determine whether they can serve as an alternative to the standard auction rules. Theoretical analyses are followed by the laboratory experiments, which demonstrate that the mechanisms under study are characterized by both high price and allocative efficiency, and therefore could be considered an interesting substitute of the standard auction rules.
With the upcoming implementation of the centralized capacity market in Poland, capacity auctions will be organized where domestic power companies will offer their available capacities. It is assumed that bidding will be auctioned according to the so called descending clock auction system with uniform-price (Pay-as-Clear), which will lead to the market equilibrium price. Some analysts, however, are of the view that it is more appropriate to organize capacity auctions in the Pay-as-Bid formula, as this system should lead to lower prices that those of Pay-as-Clear, hence lower costs of capacity purchase. However, this opinion does not confirm the practice – theoretical considerations do not take into account such important factors as the behavior of market players and the tendency of bidders to accept a higher risk or the lack of access to advanced analyses, and thus better information for all market participants. This paper presents a hypothetical calculation of the prices in the centralized capacity market using Monte Carlo simulations. The results of the study confirm that the price level for the Pay-as-Bid system, due to the asymmetry of information and the level of concentration of the power generation sector in Poland would lead to higher prices than for the Pay-as-Clear system on average by approximately 2.5%. The implementation of the PAB system would, therefore, be less efficient to electricity consumers.
Electronic reverse auctions (e-RAs) are considered to be an effective tool for negotiating tender prices and achieving cost savings. Furthermore, if multicritera evaluation is used, it can be expected that e-RAs will also contribute to achieving benefits in other areas, e.g. helping to minimize life-cycle costs. This study aims to analyse the mutual relationships between selected e-RA variables. More specifically, correlation analysis is applied to explore real e-RA data representing public tenders for construction work. This study’s findings reveal that the correlations examined are generally weak or very weak. Furthermore, it has been found that the value of correlation coefficients varies depending on the type of structure, and that public tenders are usually evaluated solely on the basis of the criterion of the lowest bid price. Recommendations for public authorities in using e-RAs in the role of the buyer are also provided at the end of this paper.
The paper investigates the supply structure of the capacity market in Poland in the coming years. The results of the capacity auctions conducted in 2018 are analyzed for this purpose. Three auctions were held at that time. The products traded in the capacity market are capacity obligations for the following years: 2021, 2022 and 2023. The auctions were organized in accordance with (i) he Act of December 8, 2017 on the Capacity Market and the (ii) Capacity Market Regulations published by the Polish Power Grid. The source of data used in this study is the official information of the President of the Energy Regulatory Office on the final results of the main auctions for 2021–2023 delivery periods. The list of the capacity suppliers who won capacity auctions contains the type of capacity market units, the volume of capacity obligations, the duration of capacity agreements and the business name of the capacity suppliers. The conducted analysis indicates that the auction for 2021 was won mainly by existing units (45.81%) and refurbishing units (33.51%). In subsequent years, the share of existing generating units is significantly higher and amounts to 91.67% for 2022 and 84.54% for 2023. The results of the study carried out in this paper also show that one energy company, being the owner of power generating daughter companies, has a very high share in these capacity auctions. The PGE Capital Group contracted 51.95% for 2021, 69.92% for 2022 and 64.44% for 2023 of the total capacity obligation. The volume amounts to over 70% of their total installed capacity.
This is account of the first auction of rare magazines and newspapers organized at the Warsaw Academic Antiquarian Bookshop (Magazines and Newspapers) of the Publishing House Dom Książki in 1984. It offered over two thousand items, published in Poland and abroad, from the 18th until the 20th century.