Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The authors developed the definition of construction defect and fault and construction defect management based on Polish and foreign publications. In order to assist identification of faults and their analysis in the process of home collection, the authors applied the Case Based Reasoning (CBR) method. In the paper, the authors used Case Based Reasoning (CBR) to support acceptance of apartments. The CBR method allows to determine the magnitude of global similarity for the problem under consideration between the new and old case from the Case Base, using weighted sums of local similarities using criteria weights as coefficients. As a result of CBR-based solutions, an Employer’s representative receives information about the type of construction defects that can be expected, their location and significance, occurrence frequency, and estimated repair cost.

Go to article

Authors and Affiliations

K. Zima
S. Biel
Download PDF Download RIS Download Bibtex

Abstract

Hundreds or even thousands of defects can be found during the building acceptance, hence the need for solutions which will facilitate the defect management, including identification, costing and repair. The aim of the paper is to present the possible use of BIM to support the defect management process during the acceptance of apartments in multifamily residential buildings. The paper presents a concept of quality control support application called MWBIM (Map of Knowledge BIM) which will collect data about discovered construction defects, their recording and servicing with the BIM technology. MWBIM will run based on Building Information Modelling (BIM), Augmented Reality (AR), Case-Based Reasoning (CBR) and maps of knowledge. There are three phases in the operation of the application: preparatory phase (planning the order of acceptance meetings and elements to be checked), acceptance phase (data collection and assigning them to the building information model) and the reporting phase (reports generation, assigning defects to contractors, follow-up of repair status). The intended uses of the application are mainly personnel involved in the acceptance of apartments.
Go to article

Authors and Affiliations

Sebastian Biel
1
ORCID: ORCID

  1. MSc., Eng., Cracow University of Technology, Faculty of Civil Engineering, Division of Management in Civil Engineering (L-7), Warszawska 24 Street, 31-155 Cracow, Poland

This page uses 'cookies'. Learn more