Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

A failure analysis of Babar dam on the El Arab River was performed to highlight the impact of flood wave and velocities on the four villages downstream of the dam; Hella, Khérenne, Chebla and El Oueldja. The simulation of wave propagation along the El Arab River under several scenarios was performed by the hydraulic HEC-RAS model. This model is dedicated to the description of floods at the dam following a breach in the dike. The main factors considered in this simulation include the level of flood water, the flood hydrograph, and the typical scenario for this breach. The flood risk analysis revealed that the maximum of flood wave flow registered at the breach is (Qmax = 9253.02 m3∙s–1), and is beginning to mitigate downstream of the dam along the El Arab River where it reached at the last village with a low flow (Q = 1110.64 m3∙s–1). This simulation allowed drawing the risk map which showed the areas threatened by flood wave resulting from a total failure of the work, and consequently required a plan of security measures to moderate as much as possible the consequences of floods. A sensitivity analysis was conducted to approach the parameters of impact of the breach on the dam failure scenario. It was confirmed that these parameters as formulation time, breach width and side slope have a great influence on the dam failure scenario with the four adjustments (±20 and ±50).

Go to article

Authors and Affiliations

Aissam Gaagai
ORCID: ORCID
Abderrahmane Boudoukha
ORCID: ORCID
Lahcen Benaabidate
ORCID: ORCID
Download PDF Download RIS Download Bibtex

Abstract

Small earth dams are most valuable in arid and semi-arid areas where they are used for both domestic and agricultural purposes. These dams however, continue to fail. The causes of such failures are interconnected in the sense that one can trigger the other. Most research into earth dams nevertheless, uses reductionist approaches. Such approaches do not consider the complex interactions between these modes and/or causes. This research used fuzzy cognitive mapping to identify the prominent modes and causes of small earth dam failure in Swaziland and to capture their interactions. A sample of seven earth dam construction experts was purposively selected from five institutions for individual interviews. An individual map was developed from each interview. An aggregated map was thereafter developed by combining seven individual maps. The results indicated that overtopping, piping and sliding were the common modes of earth dam failure. Overtopping was mainly due to siltation whilst animal barrows and tree roots were largely responsible for piping. Sliding was mostly associated construction defects and sudden drawdown. It was concluded that most of the failures were linked to poor management of catchments and that of the dams. It is recommended that future designs and management should increase the level of community participation in order to limit some of the causes associated with land use practices.

Go to article

Authors and Affiliations

Mduduzi I. Shongwe
Thabo Maseko
Bruce R.T. Vilane

This page uses 'cookies'. Learn more