Abstract

The paper presents results of numerical calculations of a diaphragm wall model executed in Poznań clay formation. Two selected FEM codes were applied, Plaxis and Abaqus. Geological description of Poznań clay formation in Poland as well as geotechnical conditions on construction site in Warsaw city area were presented. The constitutive models of clay implemented both in Plaxis and Abaqus were discussed. The parameters of the Poznań clay constitutive models were assumed based on authors’ experimental tests. The results of numerical analysis were compared taking into account the measured values of horizontal displacements.

Go to article

Authors and Affiliations

M. Superczyńska
A. Zbiciak
K. Józefiak
Download PDF Download RIS Download Bibtex

Abstract

The overall efficiency of a construction of a deep excavation urban project does not depend only on the duration of the construction but also on its influence on the urban environment and the traffic [9, 10]. These two things depend greatly on the excavation method and the construction stages defined during the design process. This paper describes the construction stages of three metro stations (two stations in Warsaw and one in Paris) and discusses their advantages and disadvantages including among other things its impact on neighbouring infrastructure and the city’s traffic. An important conclusion drawn from this analysis is that the shape of the slabs used can considerably affect the design and the construction stages. For example, a vaulted top slab allows an almost immediate traffic restoration and a vaulted bottom raft allows a much shorter dewatering period.
Go to article

Bibliography

[1] A. Stańczyk, “Doświadczenia z budowy stacji metra "Ratusz" i "Marymont" w Warszawie”, Inżynieria i Budownictwo, 5, pp. 244–247, 2008.
[2] Daktera, T., Bourgeois, E., Schmitt, P., Jeanmaire, T., Delva, L., & Priol, G., “Design of deep supported excavations: comparison between real behavior and predictions based on the subgrade coefficient method”, Proceedings of the XVII European Conference on Soil Mechanics and Geotechnical Engineering, pp. 2608–2615, 2019.
[3] Daktera T. “Amélioration des méthodes de calcul des écrans de soutènement à partir du retour d'expérience de grands travaux récents » PhD Thesis, Univ Gustave Eiffel, (to be published) 2020.
[4] M. Graff, “Subway in Warsaw”, Transport systems, 12, pp. 25–35, 2018.
[5] K.F. Unrug, “Shaft design criteria”, International Journal of Mining Engineering, 2, 141–155, 1984.
[6] ILF CONSULTING ENGINEERS, “Design and construction of the underground line II from “Rondo Daszyńskiego” station to the “DworzecWileński” station in Warsaw”, 2010.
[7] M. Mitew-Czajewska, “Geotechnical investigation and static analysis of deep excavation walls – a case study of metro station construction in Warsaw”, Ann. Warsaw Univ. Life Sci. – SGGW, Land Reclam. 47 (2), pp. 163–171, 2015. http://doi.org/10.1515/sggw-2015-0022
[8] A. Sieminska-Lewandowska, “Budowa obiektu a obudowa wykopu – niełatwe zależności”, Nowoczesne Budownictwo Inżynieryjne, marzec kwiecień, pp. 64–71, 2010.
[9] A. Siemińska-Lewandowska, “Głębokie wykopy. Projektowanie i wykonawstwo.”, WKŁ, Warszawa, 2010.
[10] G. Kacprzak, S. Bodus, “The modelling of excavation protection in a highly urbanised environment”, Technical Transactions, Vol. 1, pp. 133–142, 2019. https://doi.org/10.4467/2353737XCT.19.009.10049
Go to article

Authors and Affiliations

Grzegorz Kacprzak
1
ORCID: ORCID
Tomasz Daktera
2
ORCID: ORCID
Andrzej Stańczyk
3
ORCID: ORCID
Urszula Tomczak
1
ORCID: ORCID
Seweryn Bodus
3
ORCID: ORCID
Michał Werle
3
ORCID: ORCID

  1. Warsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw, Poland
  2. Soletanche Bachy International 280 Avenue Napoléon Bonaparte, 92500 Rueil Malmaison, France
  3. Warbud S.A.
Download PDF Download RIS Download Bibtex

Abstract

The diaphragm wall and the open caisson represent two main competitive technologies used in the construction of underground objects. In modern times, diaphragm walls are primarily applied for large-size objects, with open caissons being preferred in the case of small-sized ones. Currently, objects of this type are designed mainly for sewage treatment plants and detention reservoirs. Their construction involves highly labour-intensive processes. During the execution of works unforeseen negative effects are observed to occur. During the underground objects construction the most common phenomena are: deviations from the vertical (tilt), sagging, sinking below the designed level, cracking, scratches or leakage through the wall. The purpose of the paper is to classify undesired risk factors emerging in the process of underground objects construction and selection of the optimal technological and material solution for municipal facilities. The implementation of this task involved the selection of Multi-Criteria Decision Making methods, taking into account the cause-effect rating, as the mathematical apparatus. The Ratio Estimation in Magnitudes or deciBells to Rate Alternatives which are Non-DominaTed (REMBRANDT) method was applied. The research proved that it is possible to analytically assess unforeseen risk factors conducive to emergency situations during the implementation of underground objects, using the REMBRANDT method.

Go to article

Authors and Affiliations

R. Dachowski
K. Gałek

This page uses 'cookies'. Learn more