The paper considers a digital design of time-invariant systems in the case of step-invariant (ZOH), bilinear (Tustin's) and fractional order hold (FROH) discretization methods. The design problem is formulated as linear matrix inequalities (LMI). A closed-loop stability of the digitally designed control systems is discussed.
This paper presents the design of digital controller for longitudinal aircraft model based on the Dynamic Contraction Method. The control task is formulated as a tracking problem of velocity and flight path angle, where decoupled output transients are accomplished in spite of incomplete information about varying parameters of the system and external disturbances. The design of digital controller based on the pseudo-continuous approach is presented, where the digital controller is the result of continuous-time controller discretization. A resulting output feedback controller has a simple form of a combination of low-order linear dynamical systems and a matrix whose entries depend nonlinearly on certain known process variables. Simulation results for an aircraft model confirm theoretical expectations.
Software power protection tester implemented in a real-time operating system (RTOS) might replace the conventional testing setups in IEC 61850 protection systems. This paper describes an open power protection testing platform. Linux RT capabilities related to runtime environment for such a tester are examined and OS latency sources are identified and evaluated. An algorithm for a multithreaded tester operation is proposed, including Sampled Values (SV) publisher, GOOSE input/output and time synchronization. SV and GOOSE services implemented in RT Linux environment are evaluated in accordance with IEC 61850‒5 transfer time requirements. Linux PTP time synchronization service of two similar systems controlling its electrical ports is evaluated in different synchronization scenarios. The developed tester is compared to an equivalent conventional setup during the test of IED over-current function. The conducted tests show that the Linux implementation of power protection tester in the case of scheduler latency, time synchronization accuracy and transfer time all meet the requirements of IEC 61850.