The paper presents a static load test of a pile with the largest vertical load in Poland to-date up to the force of 23000 kN. The test was performed in the centre of Warsaw on the construction site of a future high-rise building to be the tallest building in European Union. The designed building height measured from the ground level is 310 meters including an 80-metre mast. The foundation of the building was designed as a Combined Piled Raft Foundation (CPRF) utilising the barrettes and diaphragm walls technology. The test was carried out on barrettes with lengths of approx. 28 and 34 m and was aimed to estimate the stiffness (load-settlement relation) of the designed 17.5 metre-long barrette situated below the foundation level. In addition to that a series of extensometric sensors was placed inside the barrette to determine the distribution of the axial force.

Go to article

Authors and Affiliations

G. Kacprzak
S. Bodus

This page uses 'cookies'. Learn more