Abstract

The article introduces a new proposal of a defuzzification method, which can be implemented in fuzzy controllers. The first chapter refers to the origin of fuzzy sets. Next, a modern development based on this theory is presented in the form of ordered fuzzy numbers (OFN). The most important characteristics of ordered fuzzy numbers are also presented. In the following chapter, details about the defuzzification process are given as part of the fuzzy controller model. Then a new method of defuzzification is presented. The method is named center of circles intersection (CCI). The authors compare this method with a similar geometric solution: triangular expanding (TE) and geometric mean (GM). Also, the results are compared with other methods such as center of gravity (COG), first of maxima (FOM) and last of maxima (LOM). The analysis shows that the proposed solution works correctly and provides results for traditional fuzzy numbers as well as directed fuzzy numbers. The last chapter contains a summary, in which more detailed conclusions are provided and further directions of research are indicated.

Go to article

Authors and Affiliations

H. Zarzycki
W.T. Dobrosielski
Ł. Apiecionek
T. Vince
Download PDF Download RIS Download Bibtex

Abstract

The traction power supply system based on Inductively Coupled Power Transfer (ICPT) technology is one of the new traction power supply technologies that will be developed in the future. As the core part of rail transit energy transfer and conversion, the traction power supply system is not only the critical system for the safe operation of rail transit, but also the main source of its failures, so it is of great significance to study its reliability. In this paper, the reliability analysis of the non-contact traction power supply system based on mobile ICPT technology is carried out using the method of (Fault Tree Analysis) FTA combined with triangular fuzzy theory and grey relational theory. Firstly, the fault tree of the system is established, and the minimum cut sets and structure function of the fault tree are obtained. Then the triangular fuzzy numbers are introduced to represent the probability of the bottom events, and the fuzzy probability of the top event and the fuzzy importance of the bottom events are determined, after that, the maximum probability of failure of the top event is obtained. Finally, the grey relational degrees of each minimum cut set are obtained and ranked. Furthermore, in order to prove the correctness of this method, the trapezoidal fuzzy FTA is introduced and compared with it. Both research results show that the loosely coupled transformer and Insulated Gate Bipolar Transistor (IGBT) module are the weak links of the system. The results obtained are consistent and realistic, which proves the correctness of the method selected in this article.
Go to article

Bibliography

[1] Yang Q.X., Zhang P.C., Zhu L.H., Xue M., Zhang X., Li Y., Key fundamental problems and technical bottlenecks of the wireless power transmission technology, Transactions of China Electrotechnical Society, vol. 30, no. 5, pp. 1–8 (2015).
[2] He Z.Y., Feng D., Lin S., Sun X.J., Research on security risk assessment for traction power supply system of high-speed railway, Journal of Southwest Jiaotong University, vol. 51, no. 3, pp. 418–429 (2016).
[3] Mai R.K., Li Y., He Z.Y., Wireless power transfer technology and its research progress in rail transportation, Journal of Southwest Jiaotong University, vol. 51, no. 3, pp. 446–461 (2016).
[4] Li X., Li R.Q., Review of contactless traction power supply system based on ICPT, High Voltage Apparatus, vol. 55, no. 7, pp. 1–9 (2019).
[5] Lin F., The Analysis of indexes and reliability of the traction power supply system, MA Thesis, Southwest Jiaotong University (2006).
[6] Wang Z., Lin S., Feng D., Gao S.B., Chen J., Research on reliability evaluation method for catenary system considering weather condition, Journal of the China Railway Society, vol. 40, no. 10, pp. 49–56 (2018).
[7] Liu K., Liu Z.G., Chen J.W., Crack detection of messenger wire supporter in catenary support devices of high-speed railway, Journal of the China Railway Society, no. 7, pp. 43–49 (2019).
[8] Ali K., Mohammad E.H., Ebadollah K., Prioritization approach for circuit breakers to equip with condition monitoring devices, Archives of Electrical Engineering, vol. 69, no. 2, pp. 403–422 (2020).
[9] Chen M.W., Tian H., Song Y.L., Reliability optimization of co-phase power supply device based on frequency conversion control strategy, Journal of Southwest Jiaotong University, vol. 55, no. 1, pp. 9–17 (2020).
[10] Xi Y., Chen B., Guo X.B., Reliability assessment of distribution automation based on IEC61850, Power System Protection and Control, vol. 47, no. 16, pp. 129–135 (2019).
[11] Zhao H.S., Zhao H.Y., Distribution system reliability analysis considering the elements failure rate changes, Power System Protection and Control, vol. 43, no. 11, pp. 56–62 (2015).
[12] Hu S.W., Zhou H., Cong L., Reliability analysis of distribution network with power electronic substation based on fault tree, Power System Protection and Control, vol. 46, no. 21, pp. 25–31 (2018).
[13] Li Y.F., Du L., Xiao N.C., Fuzzy fault tree analysis for auto drive axle system, Journal of Southwest Jiaotong University, vol. 43, no. 7, pp. 110–114 (2009).
[14] Liu P., Yang L.X., Gao Z.Y., Fault tree analysis combined with quantitative analysis for high-speed railway accidents, Safety Science, pp. 344–357 (2015).
[15] Tanaka H., Fan L.T., Lai F.S., Fault-tree analysis by fuzzy probability, IEEE Transactions on Reliability, vol. 32, no. 5, pp. 453–457 (1983).
[16] Liu Y., Xiao Y.L., Zhang G.B., Fault tree analysis of grinding wheel rack system of CNC grinder based on trapezoidal fuzzy number, Chinese Journal of Engineering Design, vol. 25, no. 4, pp. 394–401 (2018).
[17] Singer D., A fuzzy set approach to fault tree and reliability analysis, Fuzzy Sets and Systems, vol. 34, no. 2, pp. 145–155 (1990).
[18] Huang W.C., Liu Y.K., Zhang Y., Tree and fuzzy D–S evidential reasoning combined approach: An application in railway dangerous goods transportation system accident analysis, Information Sciences, pp. 117–129 (2020).
[19] Zhou Z., Ma D.Z., Yu X.Y., Application of fuzzy grey relational analysis in fault tree analysis, Electric Machines and Control, vol. 16, no. 3, pp. 60–64 (2012).
[20] Wang T., Zhao Y., Chen J., Fault tree analysis of automobile drive axle system based on fuzzy grey correlation theory, Journal of Central South University (Science and Technology), vol. 49, no. 11, pp. 2716–2722 (2018).
[21] Zhou G.L., Zhang J.T., Liu X.T., Study on reliability of disc brake system for mine hoist based on fuzzy dynamic fault tree, Journal of China Coal Society, vol. 44, no. 2, pp. 639–646 (2019).
[22] Zhao L.L.,Wang M.X., Ni M., Analysis of hardware system’s reliability of security and stability control device, Power System Protection and Control, vol. 44, no. 13, pp. 67–73 (2016).
[23] Nan Y., Song R.Q., Chen P., Study on the factors influencing the reliability analysis in distribution network based on improved entropy weight grey correlation analysis algorithm, Power System Protection and Control, vol. 47, no. 24, pp. 101–107 (2019).
[24] Mo Y.F., Zhang Y.J., Optimal object selection of power utilization reliability promotion for smart distribution grid based on weighted grey correlation, Power System Protection and Control, vol. 47, no. 5, pp. 26–34 (2019).
[25] Andruszkiewicz J., Lorenc J., Weychan A., Distributed generation as efficient measure to improve power generation adequacy, Archives of Electrical Engineering, vol. 68, no. 2, pp. 373–385 (2019).
[26] Zhao Z.Y., Yang Z.P., Lin F., Coil optimization of wireless power transfer system applied in trams based on parking error law, Proceedings of the CSEE, vol. 37, no. A1, pp. 196–203 (2017).
[27] Gao Q.L., Study on wireless charging system of electric vehicle based on ICPT, Electronics World, no. 4, pp. 189–191 (2016).
[28] Mai R.K., Lu L.W., Li Y., Circulating current elimination of parallel dual-inverter for IPT Systems, Transactions of China Electrotechnical Society, vol. 31, no. 3, pp. 8–15 (2016).
[29] Han X.T., Yin X.G., Application of fault tree analysis method in reliability analysis of substation communication system, Power System Technology, no. 1, pp. 56–59 (2004).
Go to article

Authors and Affiliations

Yanxia Pei
1
ORCID: ORCID
Xin Li
2
ORCID: ORCID

  1. Key Laboratory of Opto-Technology and Intelligent Control Ministry of Education, Lanzhou Jiaotong University, China
  2. School of New Energy and Power Engineering, Lanzhou Jiaotong University, China
Download PDF Download RIS Download Bibtex

Abstract

The problem considered in the paper is motivated by production planning in a foundry equipped with a furnace and a casting line,

which provides a variety of castings in various grades of cast iron/steel for a large number of customers. The goal is to create the order of

the melted metal loads to prevent delays in delivery of goods to customers. This problem is generally considered as a lot-sizing and

scheduling problem. However, contrary to the classic approach, we assumed the fuzzy nature of the demand set for a given day. The paper

describes a genetic algorithm adapted to take into account the fuzzy parameters of simultaneous grouping and scheduling tasks and

presents the results achieved by the algorithm for example test problem.

Go to article

Authors and Affiliations

J. Duda
A. Stawowy
Download PDF Download RIS Download Bibtex

Abstract

Buildings in Poland are still constructed using technologies and methods created decades ago, even though many new technologies can be applied. Such an approach in the construction process is not sufficient to ensure the sustainable development of the world. Therefore, there is a great need for implementing new, innovative technical, economic, and social solutions. Innovation can be considered as any change that is beneficial for the entity that introduces it. The challenges that the construction sector faces nowadays are mostly related to the concept of sustainable development. The main trends in innovations are the shift towards more resource- and energy-efficientways of construction aswell as implementing the principles of the circular economy. In this article, we present innovative technologies applied in the construction sector that meet the requirements of sustainable development. Also, we propose a method for assessing the environmental impact of innovative technologies currently used in the construction sector. As the proposed methods are primarily based on expert knowledge, it was necessary to determine the risk of making a wrong decision to apply innovative technology in practice based on an assessment made by a person with appropriate competencies.
Go to article

Authors and Affiliations

Arkadiusz Węglarz
1
ORCID: ORCID
Paweł Gilewski
2
ORCID: ORCID

  1. Warsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw, Poland
  2. Warsaw University of Technology, Faculty of Building Services, Hydro and Environmental Engineering, ul. Nowowiejska 20, 00-653 Warsaw, Poland
Download PDF Download RIS Download Bibtex

Abstract

The new approach to the construction project planning is presented in the article. The classical net model is enriched by the fuzzy decision node. The decision node allows for alternate choices dependent on appearing circumstances. The alternative net model with fuzzy decision node is an acyclic multi-graph, where some, chosen nodes (events) have multiple connections. These connections represent alternative methods of the certain work execution. Every work (activity) (i, j) in the net model with alternative methods of work execution, despite the basic information comprising the execution time, the cost, the number of necessary workers, should comprise additional information e.g. about a complexity of works, a real feasibility. The alternative ways of a given work execution are evaluated in the decision node based on the fuzzy decision model. Each method is evaluated by assigning it the preference level in a form of the value of the membership function – „equal or higher” μ. The most preferable way of the work execution in a given circumstances, will have the highest value of preference level. When the choice is done the net model is solved in the traditional way. Therefore, the paper concentrates on the process of choosing the method of work execution in the fuzzy decision node. The example calculations accompanying the process of decision taking are presented too. The model requires the use of linguistic variables, a fuzzy numbers, as well as fuzzy preference relations together with some calculations applied the probability theory.

Go to article

Authors and Affiliations

N. Ibadov
Download PDF Download RIS Download Bibtex

Abstract

The purpose of this article is to develop a multicriteria group decision making (MCGDM) method in dual hesitant fuzzy (DHF) environment by evaluating the weights of the decision makers from the decision matrices using two newly defined prioritized aggregation operators based on score function to remove the inconsistencies in choosing the best alternative. Prioritized weighted averaging operator and prioritized weighted geometric operator based on Einstein operations are described first for aggregating DHF information. Some of their desirable properties are also investigated in details. A method for finding the rank of alternatives in MCGDM problems with DHF information based on priority levels of decision makers is developed. An illustrative example concerning MCGDM problem is considered to establish the application potentiality of the proposed approach. The method is efficient enough to solve different real life MCGDM problems having DHF information.

Go to article