Abstract

The paper presents a method of priority scheduling that is useful during the planning of multiple-structure construction projects. This approach is an extension of the concept of interactive scheduling. In priority scheduling, it is the planner that can determine how important each of the technological and organisational constraints are to them. A planner's preferences can be defined through developing a ranking list that defines which constraints are the most important, and those whose completion can come second. The planner will be able to model the constraints that appear at a construction site more flexibly. The article presents a general linear programming model of the planning of multiple-structure construction projects, as well as various values of each of the parameters that allow us to obtain different planning effects. The proposed model has been implemented in a computer program and its effectiveness has been presented on a calculation example.

Go to article

Authors and Affiliations

E. Radziszewska-Zielina
B. Sroka
Download PDF Download RIS Download Bibtex

Abstract

The basic element of a project organizing construction works is a schedule. The preparation of the data necessary to specify the timings of the construction completion as indicated in the schedule involves information that is uncertain and hard to quantify. The article presents the methods of building a schedule which includes a fuzzy amount of labour, time standards and number of workers. The proposed procedure allows determining the real deadline for project completion, taking into account variable factors affecting the duration of the individual works.

Go to article

Authors and Affiliations

E. Plebankiewicz
P. Karcińska
Download PDF Download RIS Download Bibtex

Abstract

This paper presents a model of scheduling of multi unit construction project based on an NP-hard permutation flow shop problem, in which the considered criterion is the sum of the costs of the works' execution of the project considering the time of the project as a constraint. It is also assumed that each job in the units constituting the project may be realized in up to three different ways with specific time and cost of execution. The optimization task relies on solving the problem with two different decision variables: the order of execution of units (permutation) and a set of ways to carry out the works in units. The task presented in the paper is performed with the use of a created algorithm which searches the space of solutions in which metaheuristic simulated annealing algorithm is used. The paper presents a calculation example showing the applicability of the model in the optimization of sub-contractors' work in the construction project.

Go to article

Authors and Affiliations

M. Podolski
Download PDF Download RIS Download Bibtex

Abstract

Construction risk assessment is the final and decisive stage of risk analysis. When highly changeable conditions of works execution are predicted, risk should be evaluated in the favorable, moderate, and difficult random conditions of construction. Given the random conditions, the schedule and cost estimate of the construction are developed. Based on these values, the risk of final deadline delay and the risk of total cost increase of construction completion are calculated. Next, the charts of the risks are elaborated. Risk changes are shown in the charts and are analyzed in the range [1, 0].

Go to article

Authors and Affiliations

T. Kasprowicz
Download PDF Download RIS Download Bibtex

Abstract

Production rates for various activities and overall construction project duration are significantly influenced by crew formation. Crews are composed of available renewable resources. Construction companies tend to reduce the number of permanent employees, which reduces fixed costs, but at the same time limits production capacity. Therefore, construction project planning must be carried out by means of scheduling methods which allow for resource constrains. Authors create a mathematical model for optimized scheduling of linear construction projects with consideration of resources and work continuity constraints. Proposed approach enables user to select optimal crew formation under limited resource supply. This minimizes project duration and improves renewable resource utilization in construction linear projects. This paper presents mixed integer linear programming to model this problem and uses a case study to illustrate it.

Go to article

Authors and Affiliations

S. Biruk
P. Jaśkowski