Abstract

Irrigation and hydropower are among the most important sectors in the construction industry that propel the economic needs of a developing country like Vietnam. The construction of these projects often suffers from severe delays, leading to financial losses and other negative impacts on the economy. This paper aims to determine delay factors in the construction of these projects. Among many, 39 most important candidates of delay causes were identified from the literature review. Further surveys on project participants were conducted for the severity of these causes. An exploratory factor analysis was utilized to identify latent factors that cause delays in construction projects. The analysis result categorized a few groups of factors such as abnormal factors on the construction site (e.g., labor accidents, hydrology, water flow, extreme weather) and technical factors related to the construction contractor (e.g., unsuitable schedule, outdated construction technology, unprofessional workers) that have the greatest impact on the delay in construction of irrigation and hydropower projects in Vietnam. These findings contribute to the body of knowledge of project management and risk management, hence an improvement in the efficiency of the project sectors’ performance.
Go to article

Authors and Affiliations

Van Son Nguyen
1
ORCID: ORCID
Huu-Hue Nguyen
1
ORCID: ORCID
Duc Anh Nguyen
2
ORCID: ORCID
Dinh Tuan Hai
3
ORCID: ORCID

  1. ThuyLoi University, Faculty of Civil Engineering, No. 175 Tay Son Road, Dong Da District, Hanoi City, Vietnam
  2. Hanoi University of Civil Engineering, Faculty of Department of Building and Industrial Construction, No. 55 Giai Phong Street, Hai Ba Trung District, Hanoi City, Vietnam
  3. Hanoi Architectural University, Faculty of Civil Engineering, Km 10, Nguyen Trai Street, Thanh Xuan District, Hanoi City, Vietnam
Download PDF Download RIS Download Bibtex

Abstract

Using loans is an effective solution for the investment and construction of energy works in general and power plants in particular, especially for developing countries. In economic and financial studies of the project investment preparation stage, the options of using capital and paying interest will be taken into account to minimize risks and increase the project’s ability to pay due debts. However, it is difficult to know which loan repayment option is the most beneficial for the project and when the risk is for the project in the context of debt repayment. The current economic and financial analysis of the project mainly focuses on determining the feasibility of the project through basic parameters, such as net present value (NPV), benefit – cost – ratio (B/C), internal rate of return (IRR), profitability index (PI) and payback period (PP). These parameters do not indicate the most difficult time to pay off the project’s loans. This paper analyzes two options for repayment of long-term loans in Vietnam using the case study of Son La hydropower plant to clarify the above difficult times and recommend a suitable repayment plan for the power project. The analytical method is used to actualize the cash flow of capital and interest during the construction and operation of the works. In Option 1, the debt is paid annually for interest and capital with a constant amount of money during the repayment period. In Option 2, the original dept without interest is paid with a constant amount of money during the repayment period, the interest (due to the remaining original capital) must be paid in the year when the interest is incurred. The study results show that the amount of the annual payment in option 1 is smaller than in Option 2 in the first four years (of ten years of debt repayment). Thus, capital and interest payment in Option 2 may be more detrimental than Option 1 in the first three years of debt repayment, and the amount of money from debt repayment is greater than the profit obtained from power generation. Thus, depending on the profit in the first years when the power plant comes into operation, the investor needs to decide on a reasonable way to repay the loan so that the project can self-finance.
Go to article

Authors and Affiliations

Le Tat Tu
1
ORCID: ORCID
Vu Minh Phap
1
ORCID: ORCID
Nguyen Thi Thu Huong
1
ORCID: ORCID

  1. Institute of Energy Science, Vietnam Academy of Science and Technology, Viet Nam
Download PDF Download RIS Download Bibtex

Abstract

Hydropower use of watercourses has tangible consequences for the environment, society and economy. Based on a literature review and their own research, the authors present current data on changes in the ecological status of waters within run-of-river and reservoir hydropower plants, i.e. changes in biological elements (benthic macroinvertebrates, plankton, ichthyofauna, macrophytes), as well as hydromorphological and physicochemical changes. Previous researchers have noted that the impact of hydropower use of rivers on ecological status of those rivers is extensive, consisting of, among others, changes in species structure and populations of macrophytes, benthic macroinvertebrates, plankton and ichthyofauna (positive as well as negative changes), algal blooms due to increased turbidity, constrained migration of water organisms, changes in temperature within hydroelectric power plants, the phenomenon of supersaturation, eutrophication, changes in hydrological conditions (e.g., increased amplitudes of diurnal water levels and their consequent annual reduction), and increased erosion below the damming and deposition of bottom sediments on the damming barriers. In addition to such changes in ecological status, hydropower use also has a visible impact on socio-economic conditions (e.g., living standards of the population) and the environment (e.g., quality of bottom sediments and biodiversity). The article offers an assessment of the impact of hydropower use of rivers on ecological status (biological, hydromorphological, physicochemical elements and hydrological conditions of such rivers), society, economy and environment; it also proposes a research scheme to assess the impact of hydropower structures.
Go to article

Authors and Affiliations

Paweł Tomczyk
1
Mirosław Wiatkowski
1

  1. Institute of Environmental Engineering, Wrocław University of Environmental and Life Sciences, Poland

This page uses 'cookies'. Learn more