Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

Starting in May 2021, green building is mandatory for new buildings in Indonesia. Greenship is a green building certification system in Indonesia issued by the Green Building Council Indonesia (GBCI) which is a member of the World GBC for the conservation and efficiency of resources (energy, water, land, materials, and nature). Greenship will be implemented in MICE which is a building for Meetings, Incentives, Conventions, and Exhibitions that has a strong economic attractiveness in Indonesia, which has a population of 270 million. Using the SEM-PLS it was quickly concluded that energy is the most influential factor in achieving platinum ratings from GBCI.With the value engineering (VE) method and life cycle cost analysis (LCC), it is needed an additional 4,689% cost for the platinum grade green costs through energy optimization will get a payback period of 3 years and 10 months. The novelty of this research, since the design, it is necessary to take steps to measure energy efficiency and other resources with a selection of materials/machines and working methods of the green concept to know the amount of additional initial costs that do not much burden investment costs compared with some future benefits of green MICE.
Go to article

Authors and Affiliations

Sutikno Sutikno
1
ORCID: ORCID
Albert Eddy Husin
1
ORCID: ORCID
Maria Magdalena Enny Yuliati
1
ORCID: ORCID

  1. Mercu Buana University, Jalan Meruya Selatan No 1 Kembangan, Jakarta Barat, Jakarta 11650, Indonesia
Download PDF Download RIS Download Bibtex

Abstract

In green concept hospital work, several provisions must be obeyed so that all processes, including material selection, project implementation, and building operations, must refer to green principles. Green building planning and construction costs higher than conventional by 10–20%. By using theValue Engineering (VE) method and combined with the Lifecycle Cost Analysis (LCCA), the researcher applies the green hospital concept to a project which is a case study but is still cost-effective even lower than the original Bill of Quantity. To see the strong influence of effectiveness on the hospital project, the researcher distributed a questionnaire to stakeholders. The results of the questionnaire were processed and analyzed using the Statistics Products and Solution Services (SPSS) tool. VE is implemented after first creating a Function Analysis System Technique (FAST) diagram, before and after adding functions for certain work items. It turns out that the use of the VE and LCCA methods is very influential in improving cost performance. From the calculation of the VE method, the resulting costs are up to 2.62% of the initial cost and LCCA shows the payback period of the Solar Power Plant with time = 9:64 years 9 years 7 months. The novelty of this research is the selection materials and the green concept of working methods is still cost efficient and the installation of Photovoltaics (PV) on the roof of Hospital reaches a payback period which is feasible for new investment.
Go to article

Authors and Affiliations

Ali Imron
1
ORCID: ORCID
Albert Eddy Husin
1
ORCID: ORCID

  1. Universitas Mercu Buana, Department of Civil Engineering, Jakarta Barat 11650, Indonesia