Abstract
We consider the manure removal system, which is used in most pig farms being built and
reconstructed at present in Ukraine, and it has been discovered that there are major mistakes during the baths
construction in the correct geometry and depth, and
therefore discusses their rules of operation. If the baths
geometry is wrongly executed, for instance, if the slope is
made to slant toward the bottom of the tub filler drain
pipe, which in itself is unacceptable, or not properly
executed in the form of a special pit steps towards the
neck drain, and etc., then a number of problems is
inherent of its exploitation. The basic requirements for
laying fused-pipe is compliance with its slope. The
considered equipment must be equipped with pumping
stations to pump manure. The pumps for pumping
manure: submersible sewage pumps and dry-installed in
the mine and long sewage pumps with electric or PTO
shaft of a tractor were analyzed. Attention was paid to the
designing of modern equipment for the distribution of
manure waste into fractions. The classification of manure
storage and the basic requirements for their placement and
arrangement was carried out, and recommendations are
made for the designing of pumping stations, to select
pumps for the pumping stations and the design during the
modern construction and reconstruction of old pig farms.
Go to article