Search results

Filters

  • Journals
  • Date

Search results

Number of results: 1
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The presented method is constructed for optimum scheduling in production lines with parallel

machines and without intermediate buffers. The production system simultaneously

performs operations on various types of products. Multi-option products were taken into

account – products of a given type may differ in terms of details. This allows providing for

individual requirements of the customers. The one-level approach to scheduling for multioption

products is presented. The integer programming is used in the method – optimum

solutions are determined: the shortest schedules for multi-option products. Due to the lack

of the intermediate buffers, two possibilities are taken into account: no-wait scheduling,

possibility of the machines being blocked by products awaiting further operations. These two

types of organizing the flow through the production line were compared using computational

experiments, the results of which are presented in the paper.

Go to article

Authors and Affiliations

Marek Magiera

This page uses 'cookies'. Learn more