Infrared (IR) science and technology has been mainly dedicated to surveillance and security: since the 70’s specialized techniques have been emerging in thermal imaging for medical and cultural heritage diagnostics, building and aeronautics structures control, energy savings and remote sensing. Most of these applications were developed thanks to IR FPAs sensors with high numbers of pixels and, actually, working at room temperatures. Besides these technological achievements in sensors/ receivers, advanced developments of IR laser sources up to far IR bands have been achieved in the form QCL (quantum cascade laser), allowing wide band TLC and high sensitivity systems for security. recently new sensors and sources with improved performances are emerging in the very far IR region up to submillimeter wavelengths, the so called terahertz (THz) region.
A survey of the historical growth and a forecast of the future developments in Devices and Systems for the new frontier of IR will be discussed, in particular for the key questions: “From where and when is IR coming?”, “Where is it now?” and “Where will it go and when?”. These questions will be treated for key systems (Military/Civil), key devices (Sensors/ Sources), and new strategic technologies (Nanotech/TeraHertz).
Circuit Breakers (CBs) play an important role in ensuring the safe operation of protection systems. Condition Monitoring (CM) devices are widely implemented to extend lifetime, and to improve the maintenance quality. The present paper proposes a cost-based prioritization approach for CBs in a network equipped withCMdevices. To this end, a mathematical formulation is developed for the categorization and modeling of equipment failures based on their severity. This formulation quantifies the effect of the CM devices on the outage rate of the equipment. The reliability parameters of the substations 400/132/20 KV, including the failure rate, λ, average repair time, r, average outage time, U, substations, in two status of without CM and with CM of the CBs are calculated. These parameters are calculated implementing a minimal cut-set method. The outage rate of equipment with and without the CM devices is used to determine the effect of the CM devices on the reliability of the network. Finally, the prioritization of substations to install theCMdevices on the CBs has been investigated in terms of the Expected Energy Not Supplied (EENS) and costs of CM. To verify the effectiveness and applicability of the method, the proposed approach is applied to the CBs in the power transmission network in the Khorasan Regional Electricity Company (KREC) in Iran.