Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The article presents briefly several methods of working time estimation. However, three methods of task duration assessment have been selected to investigate working time in a real construction project using the data collected from observing workers laying terrazzo flooring in staircases. The first estimation has been done by calculating a normal and a triangular function. The next method, which is the focus of greatest attention here, is PERT. The article presents a way to standardize the results and the procedure algorithm allowing determination of the characteristic values for the method. Times to perform every singular component sub-task as well as the whole task have been defined for the collected data with the reliability level of 85%. The completion time of the same works has also been calculated with the use of the KNR. The obtained result is much higher than the actual time needed for execution of the task calculated with the use of the previous method. The authors argue that PERT is the best method of all three, because it takes into account the randomness of the entire task duration and it can be based on the actual execution time known from research.

Go to article

Authors and Affiliations

E. Plebankiewicz
M. Juszczyk
J. Malara
Download PDF Download RIS Download Bibtex

Abstract

Deposits in the form of seams are most often exploited by means of mechanised longwall systems. Hard coal seams of various thicknesses are mined by plowing and shearer complexes. Both solutions are commonly used in Polish and global mining. Mechanised longwall systems consist of many machines, the most important of which are the mining machine, powered support, armoured face conveyor and beam stage loader. The article is concerned with the failure frequency of longwalls equipped with plow and shearer longwall systems in one of the Polish hard coal mines. The analysis covers a period of 13 months of the mine’s operation, during which 2,589 failures were recorded. It was carried out for all longwalls exploited in that period, i.e. five plow and five shearer ones, operating in six different sections. In the analysed period, these longwalls worked for an average of 150 days, and a total of 1,484 days. The analysis takes into account the basic division of failures used in the mining branch, i.e. mining, electrical and mechanical failures. The plow and shearer complexes were analysed separately, taking into account the failure category for all devices. A comprehensive analysis of the failure rates has revealed that the failure rate of longwalls equipped with plow complexes is noticeably higher than that of shearer ones. Moreover, it has been demonstrated that mining failures are prevalent in the analysis of both the number of failures and the average duration of failures.
Go to article

Authors and Affiliations

Łukasz Bołoz
1
ORCID: ORCID
Zbigniew Rak
2
ORCID: ORCID
Jerzy Stasica
2
ORCID: ORCID

  1. AGH University of Krakow, Faculty of Mechanical Engineering and Robotics, Department of Machinery Engineering and Transport, Al. Mickiewicza 30, 30-059 Krakow, Poland
  2. AGH University of Krakow, Faculty of Civil Engineering and Resource Management, Department of Mining Engineering and Occupational Safety, Al. Mickiewicza 30, 30-059 Krakow, Poland

This page uses 'cookies'. Learn more