@ARTICLE{Prihantoro_Agung_Value_2021, author={Prihantoro, Agung and Husin, Albert Eddy}, volume={vol. 67}, number={No 4}, journal={Archives of Civil Engineering}, pages={487-496}, howpublished={online}, year={2021}, publisher={WARSAW UNIVERSITY OF TECHNOLOGY FACULTY OF CIVIL ENGINEERING and COMMITTEE FOR CIVIL ENGINEERING POLISH ACADEMY OF SCIENCES}, abstract={Waste or additional costs in infrastructure projects such as jetty projects are often caused by rework. Besides having an impact on costs, rework is also a very significant contributor to waste or adding time which causes delays in the completion schedule of the project. A lot of research on rework has been carried out on both building and road construction projects, but there is no jetty construction project. This study aims to develop improvement scenarios to minimize the emergence of rework on pier infrastructure projects by modelling and simulating cost performance. The research variables were obtained based on the results of a literature study by asking for opinions from experts who are compatible in their scope. The initial model used the causal loop diagram form which was later developed into a Stock Flow Diagram, after which a repair simulation was carried out using the dynamic system method to determine the effect on cost performance. From the research results obtained 14 factors that affect the cost and time performance on the jetty project, the implementation of a dynamic system can provide the optimum solution with the ability to reduce the percentage of the number of reworks by 24.12% for 12 months.}, type={Article}, title={Value increase of jetty project based on system dynamics}, URL={http://journals.pan.pl/Content/122010/PDF-MASTER/art31_corr.pdf}, doi={10.24425/ace.2021.138513}, keywords={jetty project, rework, system dynamics, cost-efficiency}, }