TY - JOUR N2 - The selection of the formwork system for high rise building affects the entire construction project duration and cost. The study reports the factors influencing the selection of different formwork system in the construction of high rise buildings through structural questionnaire survey from the client, contractor, consultant, and interviews with expert members. Total of 40 technical factors was identified from the literature and 220 filled questionnaires were received from the respondent. Relative Importance Index method is used to find the topmost factors affecting the selection of formwork system. Additionally, from factor analysis 22 factors were identified to have a correlation with one another. Regression analysis reveals that duration of the project, maintenance cost, adaptability, and safety have impact on formwork selection across time, cost and quality. These findings could potentially increase the construction company’s existing knowledge in relation to formwork selection. L1 - http://journals.pan.pl/Content/115673/PDF-MASTER/15_ace-2019-0029.pdf L2 - http://journals.pan.pl/Content/115673 PY - 2019 IS - No 2 EP - 222 KW - Formwork system KW - Factor analysis KW - Correlation KW - Regression analysis A1 - Rajeshkumar, Viswanathan A1 - Sreevidya, V. PB - WARSAW UNIVERSITY OF TECHNOLOGY FACULTY OF CIVIL ENGINEERING and COMMITTEE FOR CIVIL ENGINEERING POLISH ACADEMY OF SCIENCES VL - Vol. 65 DA - 30.06.2019 T1 - Performance evaluation on selection of formwork systems in high rise buildings using regression analysis and their impacts on project success SP - 209 UR - http://journals.pan.pl/dlibra/publication/edition/115673 T2 - Archives of Civil Engineering ER -