TY - JOUR N2 - Strip backfilling mining technology is of great significance for eliminating coal gangue, improving coal recovery rate, harmonizing the development between resources and environment in diggings. This paper firstly analyzed the roof control mechanism, the deformation and failure mechanism and characteristics of the filling body through theoretical analysis. Then, through numerical simulation combined with the geological conditions on site, a gangue strip filling scheme was designed for the 61303 working face of the 13th layer of the rear group coal of the Wennan Coal Mine in Shandong Province, and the filling scheme of filling 50 m and leaving 25 m was determined. Finally, an on-site engineering test was carried out on the 61303 working face. Through the analysis of the measured data of “three quantities” after the filling test, it can be seen that the test has achieved a good engineering application effect and verified the rationality of the filling scheme design. It solves the coal gangue problem, improves the resource recovery rate, and provides a reference for other similar mines. L1 - http://journals.pan.pl/Content/121878/PDF/Archiwum-66-4-07-Huang.pdf L2 - http://journals.pan.pl/Content/121878 PY - 2021 IS - No 4 EP - 609 DO - 10.24425/ams.2021.139599 KW - coal gangue KW - strip backfilling mining KW - numerical simulation KW - scheme design KW - construction technology A1 - Xing, Wenbin A1 - Huang, Wanpeng A1 - Feng, Fan PB - Committee of Mining PAS VL - vol. 66 DA - 2021.12.23 T1 - Research on Application of Strip Backfilling Mining Technology – A Case Study SP - 595 UR - http://journals.pan.pl/dlibra/publication/edition/121878 T2 - Archives of Mining Sciences ER -