Details Details PDF BIBTEX RIS Title Method of the Assessment of the Influence of Longwall Effective Working Time Onto Obtained Mining Output Journal title Archives of Mining Sciences Yearbook 2016 Issue No 4 Authors Napieraj, Aneta ; Snopkowski, Ryszard ; Sukiennik, Marta Divisions of PAS Nauki Techniczne Publisher Committee of Mining PAS Date 2016 Identifier DOI: 10.1515/amsc-2016-0064 ; ISSN 0860-7001 Source Archives of Mining Sciences; 2016; No 4 References Snopkowski (2012), Selection of the longwall face crew with respect to stochastic character of the production process part procedural description No, Arch Min Sci, 1. ; Snopkowski (2012), Method of the production cycle duration time modeling within hard coal longwall faces No, Arch Min Sci, 573. ; Snopkowski (2009), Stochastic model of the longwall face excavation using two - way shearer mining technology No, Arch Min Sci, 573. ; Snopkowski (2013), Longwall face crew selection with respect to stochastic character of the production process part calculation example No, Arch Min Sci, 2, 227. ; Snopkowski (2000), Boundary conditions for elementary functions of probability densities for the production process realized in longwalls No, Arch Min Sci, 501. ; Snopkowski (2002), Longwall output plan considered in probability aspect No, Arch Min Sci, 413. ; Snopkowski (2005), The use of the Stochastic Simulation for Identyfication of the Function of Output Probability Density No, Arch Min Sci, 497.