Details
Title
The influence of electronic detonators on the quality of the tunnel excavationJournal title
Archives of Civil EngineeringYearbook
2021Volume
vol. 67Issue
No 3Authors
Affiliation
Skłodowska, Anna Monika : Warsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw, Poland ; Skłodowska, Anna Monika : Now at: Instituto Nazionale di Oceanografia e di Geofisica Sperimentale – OGS, Borgo Grotta Gigante 42/C - 34010 - Sgonico, Italy & University of Trieste, Piazzale Europa 1, Trieste, Italy ; Mitew-Czajewska, Monika : Warsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw, PolandKeywords
Drill&blast method ; contour quality ; scanning ; electronic detonatorsDivisions of PAS
Nauki TechniczneCoverage
333-349Publisher
WARSAW UNIVERSITY OF TECHNOLOGY FACULTY OF CIVIL ENGINEERING and COMMITTEE FOR CIVIL ENGINEERING POLISH ACADEMY OF SCIENCESBibliography
[1] D. Chapman, N. Metje, A. Stark, “Introduction to tunnel construction” Second edition. CRC Press. Taylor&Francis Group, LLC, 2018. https://doi.org/10.1201/9781315120164
[2] S. Zare, A. Bruland, J. Rostami, “Evaluating D&B and TBM tunnelling using NTNU prediction models”, Tunnelling and Underground Space Technology 59: pp. 55–64, 2016. https://doi.org/10.1016/j.tust.2016.06.012
[3] Norwegian Tunnelling Technology, Publication no. 23: pp. 13–16, pp. 99–113. Norwegian Tunnelling Society, Oslo, 2014.
[4] B. Maidl, M. Thewes, U. Maidl, “The handbook of tunnel engineering. Drill and blast tunneling” (chapter 5), WILEY‐VCH Verlag GmbH, 2013. https://doi.org/10.1002/9783433603499.ch5
[5] D. Zou, “Contour Blasting for Underground Excavation”. In: Theory and Technology of Rock Excavation for Civil Engineering. Springer, Singapore, 2017. https://doi.org/10.1007/978-981-10-1989-0_17
[6] C. Jimeno, E. L. Jimeno, F. J .A. Carcedo, T. V. Ramiro, “Drilling and Blasting of Rocks”, Taylor & Francis Group, 2017. https://doi.org/10.1201/9781315141435
[7] Y. Kim, A. Bruland, “Analysis and Evaluation of Tunnel Contour Quality Index”, Automation in Construction 99: pp. 223–237, 2019. https://doi.org/10.1016/j.autcon.2018.12.008
[8] A. Skłodowska, M. Mitew-Czajewska, “Contour quality in drill and blast method in Norwegian Tunnelling Method”, Inżynieria i Budownictwo 3/2017: pp. 159–161, 2017 (in Polish).
[9] H. L. Arora, D. V. Singh, “Overbreak in underground excavations-some key insights”, 12th International Symposium on Rock Fragmentation by Blasting, Luleå Sweden, 11–13 June 2018.
[10] J. A. Ibarra, N. H. Maerz, J. A. Franklin, “Overbreak and underbreak in underground openings Part 2: causes and implications”, Geotechnical and Geological Engineering, Vol. 14, No. 3: pp. 325–340, 1996. https://doi.org/10.1007/BF00421947
[11] E. Costamagna, C. Oggeri, P. Segarra, R. Castedo, J. Navarro, “Assessment of contour profile quality in D&B tunneling”, Tunnelling and Underground Space Technology 75: pp. 67–80, 2018. https://doi.org/10.1016/j.tust.2018.02.007
[12] G. M. Foderà, A. Voza, G. Barovero, F. Tinti, D. Boldini, “Factors influencing overbreak volumes in drill-and-blast tunnel excavation. A statistical analysis applied to the case study of the Brenner Base Tunnel – BBT”, Tunnelling and Underground Space Technology 105: pp. 103–475, 2020. https://doi.org/10.1016/j.tust.2020.103475
[13] H. K. Verma, N. K. Samadhiya, M. Singh, R. K. Goel, P. K. Singh, “Blast induced rock mass damage around tunnels”, Tunnelling and Underground Space Technology 71: pp. 149–158. 2018. https://doi.org/10.1016/j.tust.2017.08.019
[14] B. Zou, Z. Xu, J. Wang, Z. Luo, L. Hu, "Numerical investigation on influential factors for quality of smooth blasting in rock tunnels", Advances in Civil Engineering 2020: 9854313, 2020. https://doi.org/10.1155/2020/9854313
[15] P. Montagneux, P. Buffard Vercelli, “A new approach for qualifying blasting works in underground”, Tunnels and Underground Cities: Engineering and Innovation meet Archeology, Architecture and Art, volume 3: Geological and geotechnical knowledge and requirements for project implementation – Peila, Viggiani & Celestino (Eds), Taylor & Francis Group, London, 2020.
[16] A. Mottahedi, F. Sereshki, M. Ataei, “Development of overbreak prediction models in drill and blast tunneling using soft computing methods”, Engineering with Computers 34: pp. 45–58, 2018. https://doi.org/10.1007/s00366-017-0520-3
[17] A. H. Salum, V. M. S. R. Murthy, “Optimizing blast pulls and controlling blast-induced excavation damage zone in tunnelling through varied rock classes”, Tunnelling and Underground Space Technology 85: pp. 307–318, 2019. https://doi.org/10.1016/j.tust.2018.11.029
[18] E. Salas Garcia, A. Diaz Butron, “Tunnels: Blasting Optimization for advance 100%, with overbreak and underbreak lower than 5%. Work Cycle Quality, direct improvement of the efficiency and profitability of an underground work”, DNA-TEC-N-013-B-TUNNEL & MINING, 2019.
[19] A. F. McKown, “Perimeter controlled blasting for underground excavations in fractured and weathered rocks”, Environmental and Engineering Geoscience, xxiii (4): pp. 461–478, 1986. https://doi.org/10.2113/gseegeosci.xxiii.4.461
[20] N. Innaurato, R. Mancini, M. Cardu, “On the influence of rock mass quality on the quality of blasting work in tunnel driving”, Tunnelling and Underground Space Technology 13 (1): pp. 81–89, 1998. https://doi.org/10.1016/S0886-7798(98)00027-3
[21] S. Zare, “Prediction Model and Simulation Tool for Time and Cost of Drill and Blast Tunnelling”, Ph.D Thesis, Norwegian University of Science and Technology, Trondheim, 2007.
[22] K. Dey, V. M. S. R. Murthy, “Prediction of blast-induced overbreak from uncontrolled burn-cut blasting in tunnels driven through medium rock class”, Tunnelling and Underground Space Technology 28: pp. 49–56, 2012. https://doi.org/10.1016/j.tust.2011.09.004
[23] H. Mohammadi, A. Azad, “Applying rock engineering systems approach for prediction of overbreak produced in tunnels driven in hard rock”, Geotechnical and Geological Engineering 38: pp. 2447–2463, 2020. https://doi.org/10.1007/s10706-019-01161-z
[24] H. Mohammadi, B. Barati, A. Y. Chamzini, “Prediction of blast-induced overbreak based on geo-mechanical parameters, blasting factors and the area of tunnel face”, Geotechnical and Geological Engineering 36: pp. 425–437, 2018. https://doi.org/10.1007/s10706-017-0336-3
[25] J. van Eldert, “Measuring of over-break and the excavation damage zone in conventional tunneling”, Proceedings of the World Tunnel Congress 2017: Surface challenges – Underground solutions [Internet], 2017.
[26] H. Jang, Y. Kawamura, U. Shinji, “An empirical approach of overbreak resistance factor for tunnel blasting”, Tunnelling and Underground Space Technology 92: 103060, 2019. https://doi.org/10.1016/j.tust.2019.103060
[27] A. Mottahedi, F. Sereshki, M. Ataei, “Overbreak prediction in underground excavations using hybrid ANFIS-PSO model”, Tunnelling and Underground Space Technology 80: pp. 1–9, 2018. https://doi.org/10.1016/j.tust.2018.05.023
[28] W. Zhang, J. Tang, D-S. Zhang, L. Zhang, Y. Sun, W-S. Zhang, “Experimental study on the joint application of innovative techniques for the improved drivage of roadways at depths over 1km: a case study”, Archives of Mining Sciences 65 (2020), 1: pp. 159–178, 2020. https://doi.org/10.24425/ams.2020.132713
[29] J. Pengfei, X. Zhang, X. Li, B. Jiang, B. Liu, H. Zhang, “Optimization analysis of construction scheme for large-span highway tunnel under complex conditions”, Archives of Civil Engineering 64(4): pp. 55–68, 2018. https://doi.org/10.2478/ace-2018-0044
[30] Q. Gao, W. Lu, Z. Leng, Z. Yang, Y. Zhang, H. Hu, "Effect of initiation location within blasthole on blast vibration field and its mechanism", Shock and Vibration 2019: 5386014, 2019. https://doi.org/10.1155/2019/5386014
[31] R. König, “Improvement of tunnel profile by means of electronic detonators”, Modern Trends in Tunnelling and Blast Design: pp. 123–130, 2000.
[32] H. P. Rossmanith, "The mechanics and physics of electronic blasting", Proceedings of the 29th ISEE Annual Conference on Explosives and Blasting Technique, Nashville, Tennessee, 2-5 February, vol. 1: pp. 83–101, 2003.
[33] H. P. Grobler, “Using Electronic Detonators to Improve All-Round Blasting Performances”, Fragblast, 7:1, pp. 1–12, 2003, https://doi.org/10.1076/frag.7.1.1.14061
[34] Y. Bleuzen, F. Monath, M. Quaresma, M. Joao, “Tunnel blasting in a sensitive environment using electronic detonators”, The Journal of Explosives Engineering, sept./oct.: 6–14, 2005.
[35] A. Fauske, “La construccion de tuneles urbanos en Noruega”, Rocas y Minerales, July: pp. 62–74, 1998.
[36] M. Stratmann, “Moderne Bohr-und Sprengverfahren beim Vortrieb des Mitholztunnel”, Nobel Hefte, 1/2: pp. 31–39, 1996.
[37] M. Yamamoto, T. Ichijo, Y. Tanaka, “Smooth blasting with the electronic delay detonator”, 21 st ISEE Int. Conf. on Explosives & Blasting Technique, International Society of Explosives Engineers: pp. 144–156, 1995. https://doi.org/10.1080/13855149909408030
[38] H. Fu, L. N. Y. Wong, Y. Zhao, Z. Shen, C. Zhang, Y. Li, “Comparison of Excavation Damage Zones Resulting from Blasting with Nonel Detonators and Blasting with Electronic Detonators”, Rock Mech Rock Eng 47: pp. 809–816, 2014. https://doi.org/10.1007/s00603-013-0419-2
[39] M. Cardu, A. Giraudi, P. Oreste, “A review of the benefits of electronic detonators”, REM: Revista Escola de Minas 66(3): pp. 375–382, 2013. https://doi.org/10.1590/S0370-44672013000300016
[40] Y. Kim, “Tunnel Contour Quality Index in a drill and blast tunnel” (Ph.D.). Norwegian University of Science and Technology, 2009.
[41] Manual 021. Road tunnels, Norwegian Public Roads Administration, NPRA Printing Center, Norway 2004. ISBN 82-7207-540-7
[42] V. Isheyskiy, J. A. Sanchidrián, “Prospects of applying MWD technology for quality management of drilling and blasting operations at mining enterprises”, Minerals 10: p. 925, 2020. https://doi.org/10.3390/min10100925
[43] J. Navarro, J.A. Sanchidrián, P. Segarra, R. Castedo, E. Costamagna, L.M. López, “Detection of potential overbreak zones in tunnel blasting from MWD data”, Tunnelling and Underground Space Technology 82: pp. 504–516, 2018. https://doi.org/10.1016/j.tust.2018.08.060
[44] Statens vegvesen. Håndbok R761 Prosesskode 1: standard beskrivelsestekster for vegkontrakter: hovedprosess 1-7 (1st ed.), Oslo, 2015.
[45] Digitalisation in Norwegian tunneling. Publication no 28, Nowregian Tunnelling Society, Oslo, Norway, 2019. ISBN 978-82-92641-45-3
[46] Q. Jiang, S. Zhong, P-Z. Pan, Y. Shi, H. Guo, Y. Kou, “Observe the temporal evolution of deep tunnel's 3D deformation by 3D laser scanning in the Jinchuan No. 2 Mine”, Tunnelling and Underground Space Technology 97: pp. 103–237, 2020. https://doi.org/10.1016/j.tust.2019.103237
[47] H. Sun, Z. Xu, L. Yao, R. Zhong, L. Du, H. Wu, “Tunnel monitoring and measuring system using mobile laser scanning: design and deployment”, Remote Sensing 12(4): p. 730, 2020. https://doi.org/10.3390/rs12040730
[48] N. H. Maerz, J. A. Ibarra, J. A. Franklin, “Overbreak and underbreak in underground openings part 1: measurement using the light sectioning method and digital image processing”, Geotechnical & Geological Engineering 14: pp. 307–323, 1996. https://doi.org/10.1007/BF00421946
[49] S. Amvrazis, K. Bergmeister, R. W. Glatzl, “Optimizing the excavation geometry using digital mapping”, Tunnels and Underground Cities: Engineering and Innovation meet Archeology, Architecture and Art, volume 3: Geological and geotechnical knowledge and requirements for project implementation – Peila, Viggiani & Celestino (Eds), Taylor & Francis Group, London, 2020.
[50] K. Voit, S. Amvrazis, T. Cordes, K. Bergmeister, “Drill and blast excavation forecasting using 3D laser scanning”, Geomechanic und Tunnelbau 10(3): pp. 298–316, 2017. https://doi.org/10.1002/geot.201600057