Use of the EVM method for analysis of extending the construction project duration as a result of realization disturbances - case study

Journal title

Archives of Civil Engineering

Yearbook

2021

Volume

vol. 67

Issue

No 3

Authors

Affiliation

Starczyk-Kołbyk, Anna : Military University of Technology, Faculty of Civil Engineering and Geodesy, ul. gen. Sylwestra Kaliskiego 2, 00–908 Warsaw, Poland ; Kruszka, Leopold : Military University of Technology, Faculty of Civil Engineering and Geodesy, ul. gen. Sylwestra Kaliskiego 2,00–908 Warsaw, Poland

Keywords

EVM method ; realization disturbances ; delays in construction works

Divisions of PAS

Nauki Techniczne

Coverage

373-393

Publisher

WARSAW UNIVERSITY OF TECHNOLOGY FACULTY OF CIVIL ENGINEERING and COMMITTEE FOR CIVIL ENGINEERING POLISH ACADEMY OF SCIENCES

Bibliography


[1] N. Kongchasing, and G. Sua-Iam, “The major causes of construction delays identified using the Delphi technique: perspectives of contractors and consultants in Thailand”. Int J Civ Eng (2020). https://doi.org/10.1007/s40999-020-00575-8.
[2] K. Park, H.W. Lee, K. Choi, et al., “Project Risk Factors Facing Construction Management Firms”. Int J Civ Eng 17, pp. 305–321 (2019). https://doi.org/10.1007/s40999-017-0262-z
[3] ANSI EIA – 748 Standard – Earned Value Management Systems.
[4] K. Araszkiewicz, and M. Bochenek, “Control of construction projects using the Earned Value Method – case study”, Open Engineering 9 (2019), pp. 186–195. https://doi.org/10.1515/eng-2019-0020
[5] M. Bilal, L.O. Oyedele, H.O. Kusimo, H.A. Owolabi, L.A. Akanbi, A.O. Ajayi, O.O. Akinade, and J.M.D. Delgado, “Investigating profitability performance of construction projects using big data: A project analytics approach”, Journal of Building Engineering, 26 (2019). https://doi.org/10.1016/j.jobe.2019.100850
[6] D.W.M. Chan, T. O. Olawumi, and A. M.L. Ho, “Perceived benefits of and barriers to Building Information Modelling (BIM) implementation in construction: The case of Hong Kong”, Journal of Building Engineering, 25 (2019). https://doi.org/10.1016/j.jobe.2019.100764
[7] R. Charef, S. Emmitt, H. Alaka, and F. Fouchal, (2019). “Building Information Modelling adoption in the European Union: An overview”. Journal of Building Engineering, 25, (2019). https://doi.org/10.1016/j.jobe.2019.100777
[8] T. Chen et al, “How do project management competencies change within the project management career model in large Chinese construction companies?”, International Journal of Project Management, 37 (2019), pp. 485–500. https://doi.org/10.1016/j.ijproman.2018.12.002
[9] U. Dwivedi, “Earned Value Management Explained”, 2019 Project Smart reserved, https://www.projectsmart.co.uk/earned-value-management-explained.php
[10] F. Elghaish, S. Abrishami, M. RR. Hosseini, S. Abu-Samra, and M. Gaterell, “Integrated project delivery with BIM: An automated EVM-based approach”, Automation in Construction, 106, (2019). https://doi.org/10.1016/j.autcon.2019.102907
[11] M. Lendo-Siwicka, M. Poloński, and K. Pawluk, “Identification of the interference in the investment process during the realization of a shopping centre – a case study”, Archives of Civil Engineering, LXII (2016), pp. 159–172. https://doi.org/10.1515/ace-2015-0058
[12] L. Lin, R. Müller, F. Zhu, and H. Liu, “Choosing suitable project control modes to improve the knowledge integration under different uncertainties”, International Journal of Project Management, 37 (2019), pp. 896–911. https://doi.org/10.1016/j.ijproman.2019.07.002
[13] L. Song, “Earned Value Management: A Global Cross-Industry Perspective on Current EVM Practice”. PMI 2010.
[14] S.T. Matarneha, M. Danso-Amoako, S.T. Matarneh, S. Al-Bizri, M. Gaterell, and R. Matarneh, “Building information modeling for facilities management: A literature review and future research directions”, Journal of Building Engineering, 24 (2019). https://doi.org/10.1016/j.jobe.2019.100755
[15] P. A de Andrade, A. Martens, and M. Vanhoucke, ”Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities”, Automation in Construction, 99 (2019), pp. 68–78. https://doi.org/10.1016/j.autcon.2018.11.030
[16] A. Miguel, W. Madria, and R. Polancos, “Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management”, 6th International Conference on Industrial Engineering and Applications (ICIEA), Tokyo, Japan, 2019, pp. 622–628
[17] N. Moradi, S.M. Mousavi, and B. Vandani, “An earned value model with risk analysis for project management under uncertain conditions”, Journal of Intelligent & Fuzzy Systems, 32 (2017), pp. 97–113. https://doi.org/10.3233/JIFS-151139
[18] S.A. Mubarak, “Construction Project Scheduling and Control”. John Wiley & Sons, 2015.
[19] M. Oraee, M.R. Hosseini, D.J. Edwards, H. Li, E. Papadonikolaki, and D. Cao, “Collaboration barriers in BIM-based construction networks: A conceptual model”, International Journal of Project Management, 37 (2019), pp. 839–854. https://doi.org/10.1016/j.ijproman.2019.05.004
[20] E. Papadonikolaki, C. van Oel, and M. Kagioglou, “Organising and Managing boundaries: A structurational view of collaboration with Building Information Modelling (BIM)”, International Journal of Project Management, 37 (2019), pp. 378–394. https://doi.org/10.1016/j.ijproman.2019.01.010
[21] P. Piroozfar, E. R.P. Farr, A.H.M. Zadeh, S.T. Inacio, S. Kilgallone, and R. Jin, “Facilitating Building Information Modelling (BIM) using Integrated Project Delivery (IPD): A UK perspective”, Journal of Building Engineering, 26 (2019). https://doi.org/10.1016/j.jobe.2019.100907
[22] B. Roseke, “The Earned Value Method”. https://www.projectengineer.net/the-earned-value-method/
[23] A. Starczyk-Kołbyk, and L. Kruszka, “The influence of construction works disturbances on the EVM analysis outcomes – case study”, Archives of Civil Engineering, LXVI (2020), pp. 161–177. https://doi.org/10.24425/ace.2020.131781
[24] A. Webb, “Using Earned Value – a project manager guide”. Gower Publishing, Ltd., 2003.

Date

2021.09.08

Type

Article

Identifier

DOI: 10.24425/ace.2021.138061
×