Details

Title

Research on the intelligent positioning method of tunnel excavation face

Journal title

Archives of Civil Engineering

Yearbook

2022

Volume

vol. 68

Issue

No 1

Authors

Affiliation

Zhang, Jiesheng : The First Engineering Co., LTD. of CTCE Group, No. 434 Fuyang North Road, Hefei 230041, China ; Qi, Yongzheng : Jiangsu University of Science and Technology, School of Civil Engineering and Architecture, No. 2 Mengxi Road, Zhenjiang 212003, China

Keywords

tunnel excavation face ; intelligent positioning method ; graphic data conversion

Divisions of PAS

Nauki Techniczne

Coverage

431-441

Publisher

WARSAW UNIVERSITY OF TECHNOLOGY FACULTY OF CIVIL ENGINEERING and COMMITTEE FOR CIVIL ENGINEERING POLISH ACADEMY OF SCIENCES

Bibliography

[1] K. Rabensteiner, “Automated surveying speeds construction”, Tunnels & Tunnelling, 1996, vol. 28, no. 1, pp. 40–41.
[2] H.E. Bin, “Application of CASIO Measurement Program Assisted by Total Station in Survey of Tunnel Cross-Section”, Tunnel Construction, 2009, vol. 29, no. 1, pp. 120–122.
[3] Z. Lei, “Application of Total Station ’s Surrounding Measurement Function in Highway Survey and Design”, Peak Data Science, 2017, vol. 6, no. 4, pp. 105–107.
[4] L.F. Geng, “Analysis of mechanical properties of full section excavation of single arch four-lane highway tunnel”, Shanxi Architecture, 2009, vol. 2.
[5] Y.H. Deng, “Determination of full section excavation boundary of transition curve tunnel”, Mine Surveying, 2004, vol. 2004, no. 2, pp. 34–36.
[6] W.W. Yan, “Application of CASIO Series Programming Calculator in the Measurement of Tunnel Sections”, Shanxi ence and Technology, 2011, vol. 26, no. 4, pp. 123–124.
[7] W.B. Luo, “The realization of real-time communication between mobile intelligent equipment and total station under net environment”, Surveying and mapping equipment, 2007, vol. 9, no. 4, pp. 42–43.
[8] C.X. Niu, “Construction Survey of Tanba No. 4 Spiral Tunnel on Xiaohe-Ankang Highway”, Tunnel Construction, 2014, vol. 34, no. 2, pp. 163–166, DOI: 10.3973/j.issn.1672-741X.2014.02.013.
[9] L.H. Luo, S.L. Wei, “Application of Surveying Robot in Pipe Jacking Crossing Subway Tunnel Project”, Jiangsu Construction, 2018, vol. 2018, no. 6, pp. 65–66.
[10] W. He, C. Song, B. Du, “Chinese Longest Sea-crossing Metro Tunnel: Wuyuan Bay Station-Liuwudian Station Section of Xiamen Metro Line 3”, Tunnel Construction, 2018, vol. 38, no. 3, pp. 501–505.
[11] Y.X. Hu, Y. Yue, H.D. Zhang, et al., “Application of Gyroscope in Directional Measurement of Long Distance Cross Sea Metro Tunnel”, Urban Geotechnical Investigation & Surveying, 2019, vol. 2019, no. 6, pp. 172–175.
[12] Y. Zhou, S. Wang, M. Xi, et al., “Railway Tunnel Clearance Inspection Method Based on 3D Point Cloud from Mobile Laser Scanning”, Sensors, 2017, vol. 17, no. 9, DOI: 10.3390/s17092055.
[13] W.Wei, “3D Laser scanning technique is applied to the measurement of tunnel section deformation”, Beijing Surveying and Mapping, 2020, vol. 34, no. 4, pp. 561–565.

Date

2022.03.30

Type

Article

Identifier

DOI: 10.24425/ace.2022.140178
×