Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

Two-way curved arch bridges inherit the fine tradition of masonry structures, making full use of the advantages of prefabricated assembly, it adapts to the situation of no support construction and no large lifting machine and tools, and has the characteristics of convenient construction method and saving material consumption. In appearance, the two-way curved arch bridge has strong national cultural characteristics. The prefabricated components of the two-way curved arch bridge are fragmentary, complicated in bearing and poor in integrity. Most of the two-way curved arch bridges in service have been built for a long time and lack of maintenance and management. Increasing the cross-section reinforcement method is one of the two-way curved arch reinforcement methods. It has a significant effect, convenient construction, good rigidity and stability characteristics after the reinforcement. Through theoretical analysis, combined with a static load test results of the assessment of the bridge reinforcement effect. Through load test, it is found that the deflection of the arch rib after reinforcement is reduced by 9%~19% and the strain of the arch rib is reduced by 12%~22%. Through finite element calculation, the crack width of the reinforced arch rib decreases by 8.3%~14.2%. The results show that the stress and deflection are greatly improved by the method of increasing section.
Go to article

Authors and Affiliations

Kexin X. Zhang
1
ORCID: ORCID
Tianyu Y. Qi
2
ORCID: ORCID
Xingwei W. Xue
1
ORCID: ORCID
Yanfeng F. Li
1
ORCID: ORCID
Zhimin M. Zhu
3
ORCID: ORCID

  1. PhD., Eng., Shenyang Jianzhu University, School of Traffic Engineering, No. 25 Hunnan Zhong Road, Hunnan District, 110168 Shenyang, China
  2. Master Degree Candidate, Shenyang Jianzhu University, School of Traffic Engineering, No. 25 Hunnan Zhong Road, Hunnan District, 110168 Shenyang, China
  3. Master, Liaoning Urban Construction Design Institute Co. LTD, Shenyang, No.77-1 Jinfeng Street, Shenyang, China
Download PDF Download RIS Download Bibtex

Abstract

Concrete-filled steel tube arch bridge is filled with concrete inside the steel tube. The radial constraint of the steel tube limits the expansion of the compression concrete, which makes the concrete in the three-way compression state, thus significantly improving the compressive strength of the concrete. At the same time, it can simplify the construction process and shorten the construction period. Since the rapid development of concretefilled steel tubular tied arch bridge in the 1990s, a large number of such Bridges have suffered from the defects of steel concrete, loose tie rod, and hanger rod rust, etc. Therefore, the reinforcement technology for various diseases has been studied, among which the reinforcement technology for hanger rod replacement is the most complicated and more difficult. As more and more bridges of this type enter the period of reinforcement, it ismore and more urgent to study the reinforcement technology of suspenders. Taking a bridge that has been in service for 23 years as an example, this paper discusses the construction method and construction monitoring of replacing the suspender, so as to guide the construction monitoring of the bridge. Finally, the construction monitoring results of the bridge are given, which can provide reference for the replacement of the suspender of this type of bridge.
Go to article

Authors and Affiliations

Kexin X. Zhang
1
ORCID: ORCID
Tianyu Y. Qi
2
ORCID: ORCID
Xingwei W. Xue
1
ORCID: ORCID
Yanfeng F. Li
1
ORCID: ORCID
Zhimin M. Zhu
3
ORCID: ORCID

  1. PhD., Eng., Shenyang Jianzhu University, School of Traffic Engineering, No. 25 Hunnan Zhong Road, Hunnan District, 110168 Shenyang, China
  2. Master Degree Candidate, Shenyang Jianzhu University, School of Traffic Engineering, No. 25 Hunnan Zhong Road, Hunnan District, 110168 Shenyang, China
  3. Master, Liaoning Urban Construction Design Institute Co. LTD, Shenyang, No.77-1 Jinfeng Street, Shenyang, China

This page uses 'cookies'. Learn more