Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 2
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

With the availability of UHV engineering technology, the scale of the power network is expanding, and the level of the short-circuit current is getting higher, which brings hidden trouble to the safe and stable operation of the power network. Further this article issued a method that optimized the configuration of a current limiter based on the reliability of the power network. According to the reliability analysis under the influence of a short circuit, the quantitative evaluation of reliability of the power network is realized by the calculation of the short-circuit current.Aquantitative model is established among reliability evaluation and the short-circuit current as well as load loss, the candidate installation site of a current limiter can be determined according to reliability quantification results. This method uses the particle swarm optimization algorithm to optimize the distribution of the limiter, aiming at the reliability level and the minimum number of current limiters in the short circuit of a power grid. Finally, taking the actual power grid of a province as an example, the result shows that this method can reduce the search space of the optimal solution, optimize the configuration of the current limiter, and effectively limit the short-circuit current and improve the reliability of the power network.

Go to article

Authors and Affiliations

Jianjun Zeng
Yonggao Zhang
Download PDF Download RIS Download Bibtex

Abstract

A novel in-phase disposition (IPD) SPWM pulse allocation strategy applied to a cascaded H-bridge (CHB) converter is presented in this paper. The reason causing the power of the CHB converter imbalance is analyzed according to the traditional structure, the conception of power imbalance degree is introduced and the principle of the novel in-phase disposition SPWM allocation strategy is deduced in detail. The new pulse allocation scheme can ensure the power balance in 3/4 cycles through interchanging the PWM pulse sequence of the different CHB cell, meanwhile it makes the full advantage of the IPD control strategy, lower the total harmonic distortion (THD) of line voltage compared to a carrier phase shifted (CPS) control strategy, which is verified by theoretical derivation. A seven-level cascaded inverter composed by three H-bridge cells is taken as the exam- ple. The simulation and experiment is performed. The results indicate the validity of the analysis and verify the effectiveness of the proposed SPWM allocation strategy.
Go to article

Authors and Affiliations

Yonggao Zhang
Jian Xiong
Lingtao Kong
Xiaochen Wang

This page uses 'cookies'. Learn more