This paper describes practical issues related to control of the active power buffer (APB) developed for a 2 kVA single-phase inverter. The buffer is designed using the latest GaN HEMTs controlled with triangular current mode to reduce switching losses, however, the switching frequency should be limited to 1 MHz. In the case of the presented analogue-digital controller, frequency is influenced by a reference current of the APB and circuit. Therefore, the operation at start-up and shut-down is especially challenging. A modified control algorithm that also includes pre-charging and discharging process of the energy buffer is presented and experimentally verified by series of tests of the 2 kVA GaN based inverter with the APB.
The paper presents methods of determining the location of cost buffers and corresponding contingency costs in the CPM schedule based on its work breakdown structure. Application of correctly located cost buffers with appropriately established reserve costs is justified by the common overrunning of scheduled costs in construction projects. Interpolated cost buffers (CB) as separate tasks have been combined with relevant summary tasks by the starttostart (SS) relationship, whereas the time of their execution has been dynamically connected with the time of accomplishment of particular summary tasks using the “paste connection” option. Besides cost buffers linked with the group of tasks assigned to summary tasks, a definition of the cost buffer for the entire project (PCB) has been proposed, i.e. as one initial task of the entire project. Contingency costs corresponding to these buffers, depending on the data that the planner has at his disposal, can be determined using different methods, but always depend on the costs of all tasks protected by each buffer. The paper presents an exemplary schedule for a facility and the method of determining locations and cost for buffers CB and PCB, as well as their influence on the course of the curve illustrating the budgeted cost of work scheduled (BCWS). The proposed solution has been adjusted and presented with consideration of the possibilities created by the scheduling software MS Project, though its general assumptions may be implemented with application of other similar specialist tools.
The paper presents a Car Sequencing Problem, widely considered in the literature. The issue considered by the researchers is only a reduced problem in comparison with the problem in real automotive production. Consequently, a newconcept, called Paint Shop 4.0., is considered from the viewpoint of a sequencing problem. The paper is a part of the previously conducted research, identified as Car Sequencing Problem with Buffers (CSPwB), which extended the original problem to a problem in a production line equipped with buffers. The new innovative approach is based on the ideas of Industry 4.0 and the buffer management system. In the paper, sequencing algorithms that have been developed so far are discussed. The original Follow-up Sequencing Algorithm is presented, which is still developed by the authors. The main goal of the research is to find the most effective algorithm in terms of minimization of painting gun changeovers and synchronization necessary color changes with periodic gun cleanings. Carried out research shows that the most advanced algorithm proposed by the authors outperforms other tested methods, so it is promising to be used in the automotive industry.
A method of creating production schedules regarding production lines with parallel machines is presented. The production line setup provides for intermediate buffers located between individual stages. The method mostly concerns situations when part of the production machines is unavailable for performance of operations and it becomes necessary to modify the original schedule, the consequence of which is the need to build a new schedule. The cost criterion was taken into account, as the schedule is created with the lowest possible costs regarding untimely completion of products (e.g. fines for delayed product completion). The proposed method is relaxing heuristics, thanks to which scheduling is performed in a relatively short time. This was confirmed by the presented results of computational experiments. These experiments were carried out for the rescheduling of machine parts production.
The article presents the problem of the settlements development in the Ojców National Park (ONP) and its buffer zone, both located in the suburban area of Cracow (Poland). The aim of the research was to recognize the social perception of this phenomenon, as well as the residents opinion about the limitations in spatial management related to the functioning of the Park. Interviews were made among 204 residents, and 40 representatives of local self-governments, cultural institutions, associations, administrators of tourist facilities and entrepreneurs. The local community perceives constraints in the new buildings construction and in enlargement or modernization of the existing ones as the main problem for people living in the ONP or its buffer zone. Driven by their particular interests, residents advocate the further development of the settlements and tourist infrastructure within the Park and the buffer zone, the liberalization of regulations, and even the liquidation of the Park’s buffer zone. They do not understand that the natural and landscape values (highly appreciated by them) can be degraded due to these activities.