Abstract

The paper presents an approach to evaluating a building throughout its whole life cycle in relation to its sustainable development. It describes basic tools and techniques of evaluating and analysing the costs in the whole life cycle of the building, such as Life Cycle Assessment, Life Cycle Management, Life Cycle Cost and Social Life Cycle Assessment. The aim of the paper is to propose a model of cost evaluation throughout the building life cycle. The model is based on the fuzzy sets theory which allows the calculations to include the risks associated with the sustainable development, with the management of the investment and with social costs. Costs incurred in the subsequent phases of the building life cycle are analysed and modelled separately by means of a membership function. However, the effect of the analysis is a global cost evaluation for the whole life cycle of the building.

Go to article

Authors and Affiliations

E. Plebankiewicz
K. Zima
D. Wieczorek
Download PDF Download RIS Download Bibtex

Abstract

Planning maintenance costs is not an easy task. The amount of costs depends on many factors, such as value, age, condition of the property, availability of necessary resources and adopted maintenance strategy. The paper presents a selection of models which allow to estimate the costs of building maintenance, which are then applied to an exemplary office building. The two of the models allow a quick estimation of the budget for the maintenance of the building, following only indicative values. Two other methods take into account the change in the value of money over time and allow to estimate, assuming the adopted strategy and assumed costs, the value of the current amount allocated to the maintenance of the building. The final model is based on the assumptions provided for in Polish legislation. Due to significant simplifications in the models, the obtained results are characterized by a considerable discrepancy. However, they may form the basis for the initial budget planning related to the maintenance of the building. The choice of the method is left to the decision makers, but it is important what input data the decision maker has and the purpose for which he performs the cost calculation.
Go to article

Authors and Affiliations

Edyta Plebankiewicz
1
ORCID: ORCID
Agnieszka Leśniak
1
ORCID: ORCID
Eva Vitkova
2
ORCID: ORCID
Vit Hromadka
2
ORCID: ORCID

  1. Cracow University of Technology, Faculty of Civil Engineering, Warszawska 24, 31-155 Kraków, Poland
  2. Brno University of Technology, Faculty of Civil Engineering, Veverí 331/95, 602 00 Brno, Czech Republik
Download PDF Download RIS Download Bibtex

Abstract

The model for estimating the whole life costs of the building life cycle that allows the quantification of the risk addition lets the investor to compare buildings at the initial stage of planning a construction project in terms of the following economic criteria: life cycle costs (LCC), whole life costs (WLC), life cycle equivalent annual costs (LCEAC) and cost addition for risk (ΔRLCC). The subsequent stages of the model development have been described in numerous publications of the authors, while the aim of this paper is to check the accuracy of the model in the case of changing the parameters that may affect the results of calculations. The scope of the study includes: comparison of the results generated by the model with the solutions obtained in the life cycle net present value method (LCNPV) for time and financial input data, not burdened with the risk effect; the analysis of the variability of results due to changes in input data; analysis of the variability of results as a consequence of changing the sets of membership functions for input data and methods for defuzzification the result.

Go to article

Authors and Affiliations

E. Plebankiewicz
K. Zima
D. Wieczorek
Download PDF Download RIS Download Bibtex

Abstract

Estimates of the Losses Incurred by the Society Living in the Functional Urban Areas. The study presents estimates of the losses incurred by the society living in the Functional Urban Areas of regional capitals of Poland in connection with the phenomenon of urban sprawl. The estimates are presented in terms of diagnostic to 2016 and as projected reaching 2030. The results of the analysis indicate that the social losses due to the urban sprawl in Poland can be evaluate as high, as it amounts to 25.4 billion PLN per year. In the 2030 losses could reach nearly 0.5 trillion PLN, of which 264 billion PLN of losses incurred directly, and 227 billion PLN on the value of lost time.
Go to article

Authors and Affiliations

Piotr Lityński
Artur Hołuj
Download PDF Download RIS Download Bibtex

Abstract

The issues discussed in the study mainly relate to the costs presented by the structure of positions. This study, on the example of the KGHM Polska Miedź SA mining company (three mining plants), examines the position and cost calculation structure relating to technological works, cost settlement and receivables between branches and mining plants. Cost comparisons were also carried out from the perspective of the organizational structure. The cost centers, registration and settlement of costs in the accounting records, i.e. SAPR3 were highlighted. In the course of the examination, a comparative analysis was carried out aimed at determination of common features and differences between the cost of technological works by their function in the technical cost of manufacturing. As a result of the analysis, it was determined that in the years 2000–2017, the cost structure based on the position function underwent changes. The changes occurred as a result of organizational and technical and geological and mining conditions. The cost analysis allows to identify the directions of specialization of the entity in the future. The basic operating activity of the mines concentrates on extraction. Due to copper extraction in the concession areas, the analysis was to evaluate the costs incurred in the KGHM Polska Miedź SA mining plants.

Go to article

Authors and Affiliations

Anna Bajus
Download PDF Download RIS Download Bibtex

Abstract

The corporate cost of capital is used by valuators to discount future flows of income from an entity in order to derive a present-day, forward-looking value of that entity. The cost of capital is therefore determined as the weighted cost of the various sources of funding, being typically equity, debt and preference instruments. The tricky and important part is estimating the cost of equity, which usually needs the application of finance models. The study on the texts on mineral valuation or mineral project evaluation demonstrates that the capital asset pricing model (CAPM) is a general model for estimating the cost of equity. However, according to shortfalls and problems relating to it a relatively similar and simpler model i.e. the single-index market model is proposed. The single index market model is an important tool in contemporary research in finance. Much of the importance of the model follows from its 'beta' parameter which, ideally, measures the sensitivity of returns on a security to changes in a market model. To estimate the cost of equity of the mining and cement companies listed in Tehran Stock Exchange (TSE) The single-index market model is selected because of the shortfalls and problems of the CAPM as well as the lack of commercial services for determining the market premium. The regression analysis as well as the statistical analysis is carried out using Excel spreadsheet. The statistic significance of the model is tested using t and F test statistics. The results showed that the independent variable (the rate of return on the market index) has a genuine effect on the dependent variable (the rate of return for the stock) and there is a statistically significant linear relationship between the two variables at significance level of 5%. Finally, the cost of equity formining and cement companies is estimated 25.0% and 31.0% respectively. Knowing the cost of equity, calculating the discount rate will not be very difficult.

Go to article

Authors and Affiliations

Mohsen Taheri
Mehdi Irannajad
Majid Ataee-Pour
Download PDF Download RIS Download Bibtex

Abstract

The construction industry of Ukraine has a number of problems and barriers that hinder its development. The main problems affecting Ukraine are corruption, high level of opacity, inefficient use of resources and inefficient process management. Moreover, ineffective design and construction management reduce labor productivity and leads to reworks. Unfortunately, in Ukrainian construction industry most cases of rework have been accepted as a part of construction activities. Rework is one of the main factors in the growth of total costs and the excess of the schedule for the construction project. The problem of rework costs is important and needs to be studied more to alleviate these overruns in the future. However, rework data are usually quite difficult to obtain and most studies have been conducted in developed countries. It can be assumed that there is a greater probability of reworks and rework costs in developing countries than in the developed ones. Thus, the purpose of this article was to determine and systematize reworks factors, quantify amount of direct rework costs, determine the relationship between actual project costs, project duration variation and rework costs.
Go to article

Authors and Affiliations

Roman Trach
1
ORCID: ORCID
Marzena Lendo-Siwicka
2
ORCID: ORCID
Katarzyna Pawluk
2
ORCID: ORCID
Mieczysław Połoński
3
ORCID: ORCID

  1. PhD., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, Poland
  2. PhD., Eng., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, Poland
  3. Prof. PhD. Eng., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, Poland
Download PDF Download RIS Download Bibtex

Abstract

The fact that mines have to be established at the place where they are located without having a chance to choose a location brings out area usage conflicts with areas that need to be protected. In fact, forestlands are most common in these overlapping areas in Turkey. In order to perform mining activities in this overlapping forestlands, mining enterprises in Turkey receive forest land permit fees (FLPF), reforestation fees, rehabilitation fees + security deposit of conformity to the environment (SDCE), and other fees. In order to determine the share of these costs in mining investments and operating costs (OC) and to bring a solution proposal so that these costs do not pose a risk of loss of the investment in the mining enterprises, questions have been asked to mining enterprises within Turkey using the “Survey Monkey” program. The averages of all forest fees determined from the answers are proportioned to the mining investment amounts (MIA) and the annual average OC of each mining company responding to the Survey.

Thus, the distribution criteria of different forest fees that are required to be paid by the mining enterprises in order to carry out mining operations in the forestlands in Turkey and their distribution on the basis of mineral groups were analyzed. In this calculation, it was suggested that all the fees in Turkey should be reduced to a more reasonable degree by suggesting solutions regarding the calculation method envisaged by the FLPF, which has a very high share. Otherwise, the result of these rates shows that the costs of forest land-use for mining stipulated by the legislation in Turkey are quite high compared to other countries, and that the current mining investments can have difficulty in maintaining their economic operability in the presence of these required costs.

Go to article

Authors and Affiliations

Taşkın Deniz Yildiz
Download PDF Download RIS Download Bibtex

Abstract

This article presents a concept method which aids the forecasting of the reclamation cost in post- rock mining areas. The method may also prove useful in estimating the investment profitability of a mining operation at its planning stage as well as managing a potential Reserve Fund to cover future activities, such as land reclamation. The development of the method consisted in defining a set of basic/typical land reclamation directions and the typical structure of reclamation operations/works, which are based on “statistically stable” values. The estimations included the distribution of the probable cost of these works with respect to the reclamation direction and were calculated on the basis of the analyzed current price lists and historical land reclamation projects. The article proposes a method for estimating the cost structure of multi-directional projects by combining the basic directions. The changeability and predictability of various land reclamation solutions was analyzed in terms of fuzzy logic. A price list was developed, which included unit costs for separate types of reclamation works, independent of their type and scale. The assumed optimal measure involved comparing the cost of individual types of operations to the surface of the reclamation area. As an example, the method was also applied to hypothetical data from a clastic rock mine with a surface of 20 ha, and for the forest, agricultural and forest-agricultural reclamation directions. The forest-agricultural reclamation directions was presented in the proportions of 0.3:0.7.

Go to article

Authors and Affiliations

Urszula Kaźmierczak
Jerzy Malewski
Paweł Strzałkowski
Download PDF Download RIS Download Bibtex

Abstract

Geothermal waters are a source of clean energy. They should be used in a rational manner especially in energyand economic terms.

Key factors that determine the conditions in which geothermal waters are used, the amount of energy obtainedand the manner in which cooled water is utilised include water salinity. Elevated salinity levels and the presence oftoxic microelements may often lead to difficulties related to the utilisation of spent waters. Only a few Polishgeothermal facilities operate in a closed system, where the water is injected back into the formation after havingbeen used. Open (with water dumped into surface waterways or sewerage systems) or mixed (only part of the wateris re-injected into the formation via absorption wells while the rest is dumped into rivers) arrangements are morefrequently used. In certain circumstances, the use of desalinated geothermal water may constitute an alternativeenabling local needs for fresh water to be met (e.g. drinking water).

The assessment of the feasibility of implementing the water desalination process on an industrial scale islargely dependent on the method and possibility of disposing of, or utilising, the concentrate. Due to environmentalconsiderations, injecting the concentrate back into the formation is the preferable solution. The energy efficiency and economic analysis conducted demonstrated that the cost effectiveness of implementing the desalinationprocess in a geothermal system on an industrial scale largely depends on the factors related to its operation,including without limitation the amount of geothermal water extracted, water salinity, the absorption parameters ofthe wells used to inject water back into the formation, the scale of problems related to the disposal of cooled water,local demand for drinking and household water, etc. The decrease in the pressure required to inject water into theformation as well as the reduction in the stream of the water injected are among the key cost-effectiveness factors.Ensuring favourable desalinated water sale terms (price/quantity) is also a very important consideration owing tothe electrical power required to conduct the desalination process

Go to article

Authors and Affiliations

Barbara Tomaszewska
ORCID: ORCID
Leszek Pająk
ORCID: ORCID
Download PDF Download RIS Download Bibtex

Abstract

More than 6 billion square metres of new buildings are built each year. This is about 1.2 million buildings. If we translate these figures into carbon footprint (CF) generated during the construction, it will be approximately 3.7 billion tons of carbon dioxide. The contractors all over the world – also in Poland – decide to calculate the carbon footprint for various reasons, but mostly they are compelled to do so by the market. The analysis of costs and emissions of greenhouse gases for individual phases of the construction system allows implementing solutions and preventing a negative impact on the environment without increasing the construction costs. The share of each phase in the amount of produced carbon for construction and use of the building depends mainly on the used materials and applied design solutions. Hence, the materials and solutions with lesser carbon footprint should be used. It can be achieved by using natural materials or materials which do not need much energy to be produced. The author will attempt to outline this idea and present examples of integrated analysis of costs and amount of carbon footprint during the building lifecycle.
Go to article

Authors and Affiliations

Krzysztof Zima
1
ORCID: ORCID

  1. DSc., PhD., Eng., Prof. CUT, Cracow University of Technology, Faculty of Civil Engineering, ul. Warszawska 24, 31-155 Krakow, Poland
Download PDF Download RIS Download Bibtex

Abstract

This paper presents the results of a cost-effectiveness analysis and a cost-benefit analysis for the production of X-type zeolites from fly ash.
Positive results of the laboratory tests on the quality of zeolites derived from fly ash initiated a cost analysis on the production of this materials on an industrial scale. The cost-effectiveness analysis was conducted using the dynamic generation cost indicator (DGC). The calculated DGC expresses the technical manufacturing cost of 1 Mg of synthetic zeolites. Whereas the cost-benefit analysis (CBA) was completed using the economic net present value (ENP V) and the economic internal rate of return (EIRR ) indicators.
The calculated unit technical cost of producing 1 Mg of zeolites using an installation consisting of five reactors with a capacity of 25 m3 each is 211 EUR and is lower than the current market price of this product, including transportation costs. This proves the financial viability of the investment. The calculations of the economic efficiency of the installation (CBA method) show that it is fully economically viable to operate and use the products from a social point of view.
Go to article

Authors and Affiliations

Barbara Białecka
1
ORCID: ORCID
Magdalena Cempa
1
ORCID: ORCID
Zdzisław Adamczyk
2
ORCID: ORCID
Henryk Świnder
1
ORCID: ORCID
Piotr Krawczyk
1
ORCID: ORCID

  1. GIG Research Institute, Katowice, Poland
  2. Silesian University of Technology, Gliwice, Poland
Download PDF Download RIS Download Bibtex

Abstract

A significant part of hard coal production (15–19% in the years 2010–2017, i.e. 1.0–1.3 billion

tons per year) is traded on the international market. The majority of coal trade takes place by sea,

accounting for 91–94% of the total coal trade. The article discusses the share of coal in international

seaborne trade and the largest coal ports. Coal is one the five major bulk commodities (in addition

to iron ore, grain, bauxite, alumina, and phosphate rock). In the years 2010–2016, the share of coal

in international seaborne trade and major bulk commodities was 36–41% and 11–12%, respectively.

Based on the analysis of coal throughput in different ports worldwide, the ports with the

largest throughput include the ports of Qinhuangdao (China), Newcastle (Australia), and Richards

Bay (South Africa). For 2013–2017, their throughput amounted to a total of 411–476 million tons

of coal. The largest coal exporting countries were: Australia, Indonesia, Russia, Colombia, South

Africa, and the US (a total of 85% share in global coal exports), while the largest importers are

Asian countries: China, India, Japan, South Korea and Taiwan (a 64% share in global imports). In

Europe, Germany is the largest importer of coal (54 million tons imported in 2016). The article also

discusses the freight costs and the bulk carrier fleet. Taking the price of coal at the recipient’s (i.e.

at the importer’s port) into account, the share of freight costs in the CIF price of steam coal (the

price of a good delivered at the frontier of the importing country) was at the level of 10–14%. In

the years 2010–2016, the share of bulk carriers in the world fleet was in the range of 11–15%. In

terms of tonnage, bulk carriers accounted for 31–35% of the total tonnage of all types of ships in

the world. The share of new (1–4 years) bulk carriers in the total number of ships on a global scale

in the years 2010–2016 was 29–46%.

Go to article

Authors and Affiliations

Katarzyna Stala-Szlugaj
Zbigniew Grudziński
Download PDF Download RIS Download Bibtex

Abstract

Social and Economic Costs of Spatial Chaos – Settlement of Rural Areas. Among the features of spatial structures of villages and characteristics of rural areas, which support multidirectional socio-economic development and improvement of living conditions of inhabitants and users of the countryside, the focused and compact character of the development is of particular importance. The observed lack of determination in preventing and limiting suburbanization processes, including in rural areas, directly and negatively affects both the natural environment and forms of development of these areas, causing the generation of additional economic and social costs related to the chaotic management of space. The aim of the article is to estimate the degree of concentration of buildings in various types of communes in Poland and to determine the spatial distribution of this phenomenon to be able to estimate the size of chaos costs on a global basis and determine its level in the comparative system of municipalities.
Go to article

Authors and Affiliations

Piotr Gibas
Krystian Heffner
Download PDF Download RIS Download Bibtex

Abstract

The article contains considerations on possible actions directed at increasing productivity of hard

coal mining industry. It is necessary to improve the state of the industry, and ensure its survival. Basic

definitions and measures concerning productivity and management were presented to illustrate examples

referring to a mining enterprise. Then, basing on organizing, one of the management functions, the issue

of productivity in a mining enterprise and its influence on improving effectiveness of operational management,

was analysed. An assumption was presented that solutions concerning identification of sources

and volume of costs, hitherto existing in mining enterprises, ought to be complemented with the planning

function following process approach. It can be the starting point for decisions of economic feasibility of

given deposits, seams or parts of them, before mining operations start, and to control incurred costs in

process approach. The article is summed up with a process algorithm of cost management.

Go to article

Authors and Affiliations

Stanisław Prusek
Marian Turek
Józef Dubiński
Izabela Jonek-Kowalska
Download PDF Download RIS Download Bibtex

Abstract

The aim of the article is to present the selected results of analytical investigations concerning

possible directions of reducing the unit production costs in the mining company together with some

results of practical calculations. The investigations emphasize the role of the rate of utilising the

production capacity leading to reducing the unit production costs. The main component having an

essential influence on the unit production costs are the fixed unit costs. Two basic indices of a crucial

meaning for searching for possibilities leading to decreasing the unit production costs are assumed.

The first index (w1) is a measure of the rate of utilising the production capacity, the second one (w2)

concerns the fixed costs coincided with the unit of the production capacity. Theoretical considerations

concerning the mathematical modelling of the unit production costs as the values depending on the

rate of utilising the production capacity and the fixed costs coincided with the production capacity

unit, are presented in the first part of the paper. The rationalisation criteria of the mine unit production

costs are formulated. These criteria can constitute the elements of restructuring program for the mining

company. The calculation example with the use of the practical input data shows the impact of the

rate of utilising the production capacity on the mine unit production costs. In the example two variants

of annual working time are taken into account. Results of appropriate calculations are presented and

analysed in an aspect of reducing unit costs of production as a result of increasing rate of utilising the

mine production capacity.

Go to article

Authors and Affiliations

Roman Magda
Download PDF Download RIS Download Bibtex

Abstract

One of the important issues concerning development of spatial data infrastructures (SDIs) is the carrying out of economic and financial analysis. It is essential to determine expenses and also assess effects resulting from the development and use of infrastructures. Costs and benefits assessment could be associated with assessment of the infrastructure effectiveness and efficiency as well as the infrastructure value, understood as the infrastructure impact on economic aspects of an organisational performance, both of an organisation which realises an SDI project and all users of the infrastructure. The aim of this paper is an overview of various assessment methods of investment as well as an analysis of different types of costs and benefits used for information technology (IT) projects. Based on the literature, the analysis of the examples of the use of these methods in the area of spatial data infrastructures is also presented. Furthermore, the issues of SDI projects and investments are outlined. The results of the analysis indicate usefulness of the financial methods from different fields of management in the area of SDI building, development and use. The author proposes, in addition to the financial methods, the adaptation of the various techniques used for IT investments and their development, taking into consideration the SDI specificity for the purpose of assessment of different types of costs and benefits and integration of financial aspects with non- financial ones. Among the challenges are identification and quantification of costs and benefits, as well as establishing measures which would fit the characteristics of the SDI project and artefacts resulting from the project realisation. Moreover, aspects of subjectivity and variability in time should be taken into account as the consequences of definite goals and policies as well as business context of organisation undertaking the project or using its artefacts and also investors.
Go to article

Authors and Affiliations

Agnieszka Zwirowicz-Rutkowska
Download PDF Download RIS Download Bibtex

Abstract

M embrane-based water desalination processes and hybrid technologies are often considered as a technologically and economically viable alternative for desalination of geothermal waters. This has been confirmed by the results of pilot studies concerning the UF-RO desalination of geothermal waters extracted from various geological structures in Poland. The assessment of the feasibility of implementing the water desalination process analysed on an industrial scale is largely dependent on the method and possibility of disposing or utilising the concentrate. The analyses conducted in this respect have demonstrated that it is possible to use the solution obtained as a balneological product owing to its elevated metasilicic acid, fluorides and iodides ions content. Due to environmental considerations, injecting the concentrate back into the formation is the preferable solution. The energy efficiency and economic analysis conducted demonstrated that the cost effectiveness of implementing the UF-RO process in a geothermal system on an industrial scale largely depends on the factors related to its operation, including without limitation the amount of geothermal water extracted, water salinity, the absorption parameters of the wells used to inject water back into the formation, the scale of problems related to the disposal of cooled water, local demand for drinking and household water, etc. The decrease in the pressure required to inject water into the formation as well as the reduction in the stream of the water injected are among the key cost-effectiveness factors. Ensuring favourable desalinated water sale terms (price/quantity) is also a very important consideration owing to the electrical power required to conduct the UF-RO process.
Go to article

Authors and Affiliations

Michał Bodzek
Barbara Tomaszewska
Leszek Pająk
Download PDF Download RIS Download Bibtex

Abstract

The aim of the study carried out during 2002–2004 was to assess the effects and economic effectiveness of application of fungicides and insecticides in winter triticale crops. Its leaves were attacked by pathogenic fungi in 43.2% to 52.2% and the damage to leaf blade surfaces by cereal leaf beetle (Oulema spp.) ranged from 23.6% to 34.4%. The effectiveness of applied fungicides ranged from 44.7% to 90.8%, and that of insecticides was within 70.1% and 94.4%. The saved crops were evaluated for PLN 198 to 1 171 per ha. The cost coverage ratio ranged from 0.7 to 9.9 and the treatment profitability index ranged from 0.9 to 7.4. Cost index in percentage ranged from 0.8 to 8.5, with its average value of 4.2.

Go to article

Authors and Affiliations

Zdzisław Kaniuczak
Download PDF Download RIS Download Bibtex

Abstract

Social and Economic Costs of Spatial Disorder in Agriculture. The main objective of the study was the identification of the phenomena of chaos in the structure and spatial organization of agriculture, that is the agrarian fragmentation of farms, exclusion of land from agricultural production in suburban zones and the fragmentation of the agricultural landscape. These processes cause a major increase in economic and social costs, which results in the loss of resources and spatial disorder in agriculture. An attempt was made to estimate the costs of these processes in economic, social and environmental terms. The economic dimension of spatial disorder in agriculture is manifested by negative results in the production and consumption sphere related most often to high labour costs, and consequently to low incomes. The social dimension of spatial disorder in agriculture is demonstrated by the effects of de-agrarization processes and deformation of social structures. De-agrarization means the processes of agricultural area reduction, extensification and fallowing as well as an increasingly limited significance of agriculture as a workplace and a reduction in the source of income by rural residents. A conducted analysis of spatial disorder in agriculture resulting from the lack of appropriate regulation and taxation systems as well as historical factors allowed determining direct and indirect results influencing the structure and spatial organization of agriculture. Direct results include: a chessboard pattern of agricultural land, marginalization of the agricultural function in rural areas which mostly applies to suburban zones, unregulated ownership of farmland, its unjustified designation for other purposes, a decrease in biodiversity in agriculture and fragmentation of the agricultural landscape. Indirect results include: an increase in the costs of agricultural production, expensive agricultural-installation plans, loss of direct payments, easement appurtenant, the emergence of human-environment conflicts and major transformations of the agricultural landscape in a suburban zone.
Go to article

Authors and Affiliations

Barbara Maćkiewicz
Anna Kołodziejczak
Magdalena Szczepańska
Benicjusz Głębocki
Ewa Kacprzak
Download PDF Download RIS Download Bibtex

Abstract

Methane is accompanied by most of the coal deposits. The methane hazard is excessive content of this gas in the mining excavations. This is a source of high risk security and continuity of the mine. The Piast–Ziemowit is the only non-methane mine in the Polish Mining Group. In 2015, 66,4% of the coal mined in Kompania Węglowa S.A. mines comes from methane coal seams. Methane drainage is the most effective but very costly method of combating methane hazard.The costs of prevention and eradication of methane hazard is charged to the costs of coal mining. Therefore, performance of methane drainage in the mines of the Polish Mining Group is adapted to the scale of the methane hazard. The article presents an analysis of the costs of prevention of methane hazard for mines with different absolute methane and its impact on the level of these costs.

Go to article

Authors and Affiliations

Halina Potoczek
Piotr Bojarski
Leszek Kloc
Download PDF Download RIS Download Bibtex

Abstract

One of the most important business areas of the company is the management of working capital. Energy companies that produce electricity and heat are the main consumers of steam coal, so their decision concerning stock levels is a major determinant of supply schedules. These decisions depend on legal and technical requirements as well as economic aspects. The seasonality of coal consumption jointly with pre-purchase costs and storage costs has a straight impact on delivery scheduling in a parabolic way. There is a divergence in expectations regarding delivery schedules among the coal market participants (energy, mining, transport companies). The purpose of this article is to present the concept of pricing of steam coal and transport service on the Polish market, assuming the use of price incentives, resulting in delivery scheduling during the year. The article presents selected theoretical content in the field of coal logistics and working capital management in the company, the expectations of the steam coal market participant regarding delivery schedules have been identified. The proposed concept of pricing steam coal and transport service should be discussed further in scientific and expert work.

Go to article

Authors and Affiliations

Patryk Dunal
Filip Bolesta
Wojciech Dydyk
Małgorzata Kozik
Download PDF Download RIS Download Bibtex

Abstract

The problem of research undertaken in the article concerns the adaptation of traditional models of calculating the cost of capital to the specifics of mining companies. Solutions known from the literature do not give reasonable results. This is due to the uniqueness of the activities of mining companies, in which case we are dealing with a lack of reference to the typical market situations. The aim of this article is to identify solutions that allow rational and reliable results to be obtained. One of the proposals is a modified Fama-French method. The article was tested by calculating the cost of capital in the largest Polish mining enterprises. The problem of calculation of the cost of capital is particularly important in the area of assessing the effectiveness of investment projects. The cost of capital is used as the discount rate in dynamic measures of performance, such as NPV.

Go to article

Authors and Affiliations

Marian Turek
Aneta Michalak
Download PDF Download RIS Download Bibtex

Abstract

Satellite-based positioning, which started being developed in the mid-1960s for military purposes, is now used in almost every area. For the studies single and/or double frequency receivers are used. The cost of a receiver and antenna couple that have capable of high coordinate accuracies ranges from $3000 to $15000. With the production of Original Equipment Manufacturer (OEM) receivers, the cost of satellite-based location determination decreases to approximately one in 10 for the civilian user compared to the operations performed with geodetic receivers and antennas. However, although these receivers collect data in multi-Global Navigation Satellite System (GNSS) and frequencies, the accuracy of the coordinate values estimated is not as high as geodetic receivers and antennas. Therefore, it is necessary to carry out an accuracy study to obtain information about which studies can be used in. In this study, measurements were made at the UZEL point located on the roof of the Yıldız Technical University Geomatics Engineering Department by using the ZED-F9P-02B OEM multi GNSS receiver and ANN-MB L1/L2 multi-band GNSS patch antenna. The performance of the test results has been examined by comparing the results from CSRS(Canadian Spatial Reference System)-PPP with the coordinates of the UZEL point. As a result of the comparison, the difference between the coordinate determined with collected 3.5 hr data and the coordinates of the UZEL point has been determined as – 1.4 cm, 2.8 cm, and 9.3 cm in the East, North, and Height directions, respectively
Go to article

Authors and Affiliations

Mustafa Fahri Karabulut
1
ORCID: ORCID
Nedim Onur Aykut
1
ORCID: ORCID
Burak Akpınar
1
ORCID: ORCID
Güldane Oku Topal
1
ORCID: ORCID
Zübeyir Bilal Çakmak
1
ORCID: ORCID
Bilge Doran
1
ORCID: ORCID
Ahmet Anıl Dindar
2
ORCID: ORCID
Cemal Özer Yiğit
2
ORCID: ORCID
Mert Bezcioğlu
2
ORCID: ORCID
Anıl Zafer
2
ORCID: ORCID

  1. Yildiz Technical University, Istanbul, Turkey
  2. Gebze Technical University, Gebze, Turkey

This page uses 'cookies'. Learn more