Search results

Filters

  • Journals
  • Authors
  • Keywords
  • Date
  • Type

Search results

Number of results: 98
items per page: 25 50 75
Sort by:
Download PDF Download RIS Download Bibtex

Abstract

The transitional siliceous rocks from the Belchatow lignite deposit belong to the deposits with heterogeneous petrographic composition. The research allows us to identify among others, opoka-rocks and gaizes. The mineralogical-chemical analysis proves that the main ingredients of the studied rocks commonly used as building material are minerals of the SiO₂ group. Laboratory tests show that the nature of siliceous mineral phases has several effects on the geomechanical parameters of the studied transitional rocks. They are a reduction in water content and rock porosity, which leads to the transition of opal type A to opal type crystobalit and trydymit and then to quartz or microquartz. Their density and strength parameters are increased.

Go to article

Authors and Affiliations

A. Pękala
Download PDF Download RIS Download Bibtex

Abstract

What is patriotism as opposed to nationalism? And which of these is what sometimes surfaces in contemporary rock music?

Go to article

Authors and Affiliations

Michał Maurycy Mazurkiewicz
Download PDF Download RIS Download Bibtex

Abstract

Earth is filled with a myriad of minerals and rocks that charm us with their beauty and diversity. They usually take the form of solids or mineral components dissolved in water.
Go to article

Authors and Affiliations

Agnieszka Gałuszka
Zdzisław M. Migaszewski
Download PDF Download RIS Download Bibtex

Abstract

Three types of rock glaciers (moraine, cirque and subslope ones) were distinguished in northwestern Wedel Jarlsberg Land. Subslope rock glaciers were found different from nival moraines. A development of subslope and fossil cirque rock glaciers was connected with the older Holocene whereas of active cirque and moraine rock glaciers with the Little Ice Age.

Go to article

Authors and Affiliations

Jan Dzierżek
Jerzy Nitychoruk
Download PDF Download RIS Download Bibtex

Abstract

In 2017, the Central Mining Institute (GIG), Jastrzębska Spółka Węglowa SA (JSW SA), the largest producer of coking coal in Europe, and JOY KOMATSU, the producer of mining machinery, signed a consortium. The project’s main goal was to reduce the costs of driving mine workings by reintroducing the rock bolt support. The works began in November 2019, and for the first time in the history of Polish coal mining, a Bolter Miner machine was used for the purpose. The paper presents the results of measuring the axial forces in rock bolts at the measurement base and their analysis with numerical modelling.
Go to article

Bibliography

[1] V. Artemyev, P. McInally, Improvements in Longwall Technology and Performance in Kuzbass Mines of Suek. Proceedings of the 18th Coal Operators’ Conference, Mining Engineering, University of Wollongong, 124-133 (2018).
[2] S . Banerjee, Performance evaluation of continuous miner based underground mine operation system: An OEE based approach. New Trends in Production Engineering 2, 1, 596-603 (2019). DOI: https://doi.org/10.2478/ntpe-2019-0065
[3] D . Bolstad, J. Hill, Bureau of Mines rock bolting research. Proceedings of the International Symposium on Rock Bolting, Abisko, Sweden, 313-320 (1983).
[4] F. Breinig, K. Opolony, Geplante Doppelnutzung einer Rechtankerstrecke in 1200 m Teufe im Flöz D2/C. Aachen International Mining Symposia, 5th International Symposium – Roofbolting in Mining, RWTH Aachen, 159-177 (2004).
[5] T . Bush, Streckenausbau mit eisernen Ankern. Zeitschrift für das Berg – Hütten – und Salinenwesen, Berlin, 7-9 (1919).
[6] I . Canbulat, A. Wilkinson, G. Prohaska, M. Mnisi, N. Singh, An investigation into the support systems in South African collieries. Safety in Mines Research Advisory Committee, Project No SI M 020205, CSIR Division of Mining Technology, Ground Consulting (Pty) Ltd (2005).
[7] C . Cao, PhD thesis, Bolt profile configuration and load transfer capacity optimisation. School of Civil, Mining and Environmental Engineering, University of Wollongong (2012).
[8] D .R. Dolinar, S.K. Bhatt, Trends in roof bolt application. Proceedings: new technology for coal mine roof support. C. Mark, D.R. Dolinar, R.J. Tuchman, T.M. Barczak, S.P. Signer, P.F. Wopat, (Eds.) Cincinnati, OH: U.S. Department of Health and Human Services, Public Health Service, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, DHHS (NIOSH) Publication No. 2000-151 (IC 9453), 43-51 (2000).
[9] R . Fletcher, Roof Bolting Equipment and Practices. Mng. Cong. J., Nov., 80-82 (1956).
[10] S .D. Flook, J.J. Leeming, Recent developments in longwall mining entry development and room and pillar systems. Gospodarka Surowcami Mineralnymi 24, 4/3, 11-23 (2008).
[11] Golder Associates UK Ltd, Initial Rockbolt Support Design. Rockbolting Trial, Budryk Colliery, Poland. Nottingham (2018).
[12] B. Hebblewhite, 25 Years of Ground Control Developments, Practices, and Issuses in Australia. 25th International Conference on Ground Control in Mining, Morgantown, WV, 111-117 (2006).
[13] H. Jalalifar, PhD thesis, A new approach in determining the load transfer mechanism in fully grouted bolts. School of Civil, Mining and Environmental Engineering, University of Wollongong (2006).
[14] H. Jurecka, Ankerausbau eine Schlüsseltechnologie für Hochleistungsstrebbetriebe in großen Teufen. Aachen International Mining Symposia, 4th International Symposium – Roofbolting in Mining, RWTH Aachen, 1-17 (2001).
[15] V. Kajzar, R. Kukutsch, P. Waclawik, P. Konicek, Coal pillar deformation monitoring using terrestrial laser scanner technology in room and pillar panel – A case study from the Ostrava-Karvina Coal Field. Rock Mechanics and Rock Engineering: From the Past to the Future – Ulusay et al. (Eds.), Taylor & Francis Group, London, 951-956 (2016).
[16] H. Kang, Support technologies for deep and complex roadways in underground coal mines: a review. Int. J. Coal Sci. Technol. 1 (3), 261-277 (2014). DOI: https://doi.org/10.1007/s40789-014-0043-0
[17] H. Kang, Sixty years development and prospects of rock bolting technology for underground coal mine roadways in China. Journal of China University of Mining & Technology 45 (6), 1071-1081 (2016).
[18] K . Kovári, The Control of Ground Response – Milestones up to the 1960s. Proc. of the AITES -ITA World Tunnel Congress, Italy, Milan, 93-119 (2001).
[19] A . Kumar, R. Singh, P. Waclawik, Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of Cover. 37TH International Conference on Ground Control in Mining, 193-203 (2018).
[20] B. Langhanki, Planungskonzeption zur Doppelnutzung einer Rechtankerstrecke im Flöz D2/C in 1.200 m Teufe. Aachen International Mining Symposia, 4th International Symposium – Roofbolting in Mining, RWTH Aachen, 217-233 (2001).
[21] J. Luo, PhD thesis, A New Rock Bolt Design Criterion and Knowlwdge-based Expert System for Stratified Roof. Faculty of the Virginia Polytechnic Institute and State University, Blacksburg, Virginia (1999).
[22] T . Majcherczyk, A. Szaszenko, E. Sdżwiżkowa, Fundamentals of geomechanics. Wydawnictwo AGH, Kraków (2006).
[23] C .P. Mangelsdorf, Current Trends in Roof Truss Hardware. Proc. of 2nd Conference on Ground Control in Mining, edited by S.S. Peng, 108-112 (1982).
[24] C . Mark, Design of roof bolt systems. Proc.New Technology For Coal Mine Roof Support. U.S. Department of Health and Human Services, Pittsburgh, PA, 111-131 (2000).
[25] J. Modi, S. Bharti, R. Kant, Applicability of Continuous Miner in Room and Pillar Mining System: Higher Production and Productivity with Safety. International Conference on Deep Excavation, Energy Resource and Production (DEE P16), IIT Kharagpur, India (2017).
[26] A . Nierobisz, Rockbolting – history, present and future. Międzynarodowa Konferencja Szkoleniowa: Perspektywy stosowania obudowy kotwowej w polskich kopalniach węgla kamiennego, Jaworze, kwartalnik GIG Nr 2/1/2010, 184-203 (2010).
[27] A . Nierobisz, Development of Roof Bolting Use in Polish Coal Mines. Journal of Mining Science 47, No. 6, 751- 760 (2011).
[28] B. Neyman, R. Gocman, Guidelines for rockbolt support in workings. Biuletyn techniczno-informacyjny GIG nr 9 (1960).
[29] K. Opolony, H. Witthaus, A. Hucke, A. Studeny, Ergebnisse von numerischen Berechnungen und physikalischen Modellversuchen als Planungshilfe für eine Rechteckankerstrecke in Flöz D2/C. Aachen International Mining Symposia, 5th International Symposium – Roofbolting in Mining, RWTH Aachen, 539-554 (2004).
[30] S. Peng, Coal Mine Ground Control. (3rd ed.), Syd Peng Publisher, Morgantown (2008).
[31] K. Podgórski, W. Podgórski, Rockbolt support of underground workings. Wydawnictwo Śląsk. Katowice (1969).
[32] L. Rabcewicz, Bolted support for tunnels. Mine and Quarry- Engineering, April, 153-159 (1955).
[33] E.U. Reuther, A. Heime, Verbesserte Bemessung von Ankerausbau in Abbau- und Basisstrecken. Kommission der Europäischen Gemeinschaften, technische Forschung Kohle, Forschungsvertrag Nr. 7220-AB/120, Luxemburg (1990).
[34] A. Sahebi, J. Hossein, M. Ebrahimi, Stability analysis and optimum support design of a roadway in a faulted zone during longwall face retreat – case study: Tabas Coal Mine. N. Aziz (Eds.), 10th Underground Coal Operators’ Conference, University of Wollongong & the Australasian Institute of Mining and Metallurgy, 88-96 (2010).
[35] R. Schach, K. Garshol, A.M. Heltzen, Rock bolting: a practical handbook. Pergamon Press (1979).
[36] A.J.S. Spearing, G. Bylapudi, K. Mondal, A.W. Bhagwat, Rock anchor corrosion potential determination in US underground coal mines. The Southern African Institute of Mining and Metallurgy 6th South African Rock Engineering Symposium SARES (2014).
[37] A.J.S. Spearing, B. Greer, M. Reilly, Improving rockbolt installations in US coal mines. The Journal of The Southern African Institute of Mining and Metallurgy, Vol. 111, 555-563 (2011).
[38] S. Tadolini, R. Mazzoni, Understanding roof bolt selection and design still remains priceless. 25th International Conference on Ground Control, July 2006. Morgantown, WV, USA , 382-389 (2006).
[39] S . Taghipoor, Application of numerical modelling to study the efficiency of roof bolting pattern in east 1 main roadway of Tabas coal mine. 6th International Conference on Case Histories in Geotechnical Engineering, Arlington, 2-5 (2008).
[40] P. Waclawik, J. Ptacek, P. Konicek, R. Kukutsch, J. Nemcik, Stress-state monitoring of coal pillars during room and pillar extraction. Journal of Sustainable Mining 15, 49-56 (2016). DOI: https://doi.org/10.46873/2300-3960.1207
[41] P. Waclawik, R. Snuparek, R. Kukutsch, Rock Bolting at the Room and Pillar Method at Great Depths. Procedia Engineering 191, 575-582 (2017). DOI: https://doi.org/10.1016/j.proeng.2017.05.220
[42] W. Weigel, Channel Iron for Roof Control. Engineering and Mining Journal, Vol. 144, May, 70-72 (1943).
[43] J. Arthur, Ground control in coal mines in Great Britain. Coal 2006: Coal Operators’ Conference, University of Wollongong & the Australasian Institute of Mining and Metallurgy, 10-19 (2006).
Go to article

Authors and Affiliations

Wojciech Masny
1
ORCID: ORCID
Łukasz Nita
2
ORCID: ORCID
Jerzy Ficek
3

  1. Central Mining Institute, 1 Gwarków Sq., 40-166 Katowice, Poland
  2. Jastrzębska Spółka Węglowa SA, KWK „Budryk”, Poland
  3. „Geofic“ Scientific and Technical Office, Poland
Download PDF Download RIS Download Bibtex

Abstract

Cutting blasting has been widely used for tunnel excavation. The cutting forms significantly influence the blasting effect. This research focuses on the study of the relationship between cutting forms and blasting effects. Similarity theory is proposed for the experimental study of the rock blasting using small models. Then four experimental modes with different cutting forms are used to study the blasting effect due to the cutting forms. The cutting depth, borehole utilization rate, fragments volume, and average fragment size are analysed. The blasting effects with various cutting forms are compared. The influences of the borehole space and the blasting delay are discussed. It is concluded that the spiral cutting form can produce more fragments and is recommend for the small section tunnel excavation.
Go to article

Bibliography


[1] Sato, T., T. Kikuchi, and K. Sugihara, “In-situ experiments on an excavation disturbed zone induced by mechanical excavation in Neogene sedimentary rock at Tono mine, central Japan,” Engineering geology 56(1): pp. 97–108, 2000. https://doi.org/10.1016/S0013-7952(99)00136-2.
[2] Cunningham, C., “Fragmentation estimations and the Kuz-Ram model-Four years on”, in Proc. 2nd Int. Symp. on Rock Fragmentation by Blasting,1987.
[3] Kisslinger, C., The generation of the primary seismic signal by a contained explosion, DTIC Document, 1963.
[4] Kuznetsov, V., “The mean diameter of the fragments formed by blasting rock,” Journal of Mining Science 9(2): pp. 144–148, 1973. https://doi.org/10.1007/BF02506177.
[5] Clark, L.D. and S.S. Saluja, “Blasting mechanics” Trans. Am. Inst. Min. Engrs229: pp. 78–90, 1964.
[6] Langefors, U. and B. Kihlström, “The modern technique of rock blasting” Wiley, 1978.
[7] Porter, D.D., “Crater formation in plaster of Paris models by enclosed charges” Colorado School of Mines, 1961.
[8] Saluja, S.S., “Mechanism of rock failure under the action of explosives”, in The 9th US Symposium on Rock Mechanics (USRMS): American Rock Mechanics Association, 1967.
[9] Wei, X., Z. Zhao, and J. Gu, “Numerical simulations of rock mass damage induced by underground explosion” ,International Journal of Rock Mechanics and Mining Sciences 46(7): pp. 1206–1213, 2009. https://doi.org/10.1016/j.ijrmms.2009.02.007.
[10] Liu, H., D. Williams, D. Pedroso, et al., “Numerical procedure for modelling dynamic fracture of rock by blasting”, in Controlling Seismic Hazard and Sustainable Development of Deep Mines: 7th International Symposium On Rockburst and Seismicity in Mines (rasim7), Vol 1 and 2: Rinton Press, 2009.
[11] Saharan, M.R. and H. Mitri, “Numerical procedure for dynamic simulation of discrete fractures due to blasting,” Rock mechanics and rock engineering 41(5): pp. 641–670, 2008. https://doi.org/10.1007/s00603-007-0136-9.
[12] Ma, G. and X. An, “Numerical simulation of blasting-induced rock fractures,” International Journal of Rock Mechanics and Mining Sciences. 45(6): pp. 966–975, 2008. https://doi.org/10.1016/j.ijrmms.2007.12.002.
[13] Wang, Z.-L., Y.-C. Li, and R. Shen, “Numerical simulation of tensile damage and blast crater in brittle rock due to underground explosion,” International Journal of Rock Mechanics and Mining Sciences. 44(5): pp. 730–738, 2007. https://doi.org/10.1016/j.ijrmms.2006.11.004.
[14] Wang, Z., Y. Li, and J. Wang, “A method for evaluating dynamic tensile damage of rock”, Engineering fracture mechanics. 75(10): pp. 2812–2825, 2008.
[15] Zhu, Z., B. Mohanty, and H. Xie, “Numerical investigation of blasting-induced crack initiation and propagation in rocks,” International Journal of Rock Mechanics and Mining Sciences. 44(3): pp. 412–424, 2007.
[16] Huang, D., X.Y. Qiu, X.Z. Shi, et al., “Experimental and Numerical Investigation of Blast-Induced Vibration for Short-Delay Cut Blasting in Underground Mining,” Shock and Vibration. 2019: 13, 2019.
[17] Liu, K., Q.Y. Li, C.Q. Wu, et al., “A study of cut blasting for one-step raise excavation based on numerical simulation and field blast tests” ,International Journal of Rock Mechanics and Mining Sciences, 109: pp. 91–104, 2018. https://doi.org/10.1016/j.ijrmms.2018.06.019.
[18] Man, K., X.L. Liu, J. Wang, et al., “Blasting Energy Analysis of the Different Cutting Methods” ,Shock and Vibration. 2018: p. 13, 2018. https://doi.org/10.1155/2018/9419018.
[19] Xie, L.X., W.B. Lu, Q.B. Zhang, et al., “Analysis of damage mechanisms and optimization of cut blasting design under high in-situ stresses” , Tunnelling and Underground Space Technology. 66: pp. 19–33, 2017. https://doi.org/10.1016/j.tust.2017.03.009.
[20] Xie, L.X., W.B. Lu, Q.B. Zhang, et al., “Damage evolution mechanisms of rock in deep tunnels induced by cut blasting”, Tunnelling and Underground Space Technology. 58: pp. 257–270, 2016. https://doi.org/10.1016/j.tust.2016.06.004.
[21] Qu, S.J., X.B. Zheng, L.H. Fan, et al., “Numerical simulation of parallel hole cut blasting with uncharged holes” ,Journal of University of Science and Technology Beijing 15(3): 209–214, 2008.
Go to article

Authors and Affiliations

Huaming An
1
ORCID: ORCID
Yushan Song
1
ORCID: ORCID
Deqiang Yang
2

  1. Kunming University of Science and Technology, Faculty of Public Security and Emergency Management, 650093, Kunming, China
  2. University of Science and Technology Beijing, School of Civil and Resource Engineering, 100083, Beijing, China
Download PDF Download RIS Download Bibtex

Abstract

The assessment of a rock’s behaviour around excavations and the effectiveness of its reinforcement in underground ore mines is dependent on the performance of the rock-bolt and rock-mass interaction, which can be estimated on the basis of appropriately designed measurements. Based on the background of various measurements solutions described in the literature, concerning rock bolt monitoring methods, the authors proposed a new, original device for mass measurements in mine conditions. After examining the advantages and disadvantages of existing constructions, the article presents the essence, principle of operation and method of measuring anchor load in an underground excavation with the a instrument, indicator WK-2/8. The prototype has been carefully researched and successfully tested in a full-scale laboratory environment. This instrument, also referred to as a load indicator or force pad, does not require electrical power and allows for relatively accurate (with a resolution of 10-14kN, up to about 90kN loading capacity) and a remote reading of the axle loading of the anchor (AGH patent) by any person present in the specified area. The device can be installed in mining excavations under loading conditions. The relatively low cost of a measuring instrument, practically used as an additional washer, as well as an easy assembly method, makes it universally applicable in mines where anchoring is used as a means of strengthening the rock.

Go to article

Authors and Affiliations

Waldemar Korzeniowski
Krzysztof Skrzypkowski
Łukasz Herezy
Download PDF Download RIS Download Bibtex

Abstract

This article presents a concept method which aids the forecasting of the reclamation cost in post- rock mining areas. The method may also prove useful in estimating the investment profitability of a mining operation at its planning stage as well as managing a potential Reserve Fund to cover future activities, such as land reclamation. The development of the method consisted in defining a set of basic/typical land reclamation directions and the typical structure of reclamation operations/works, which are based on “statistically stable” values. The estimations included the distribution of the probable cost of these works with respect to the reclamation direction and were calculated on the basis of the analyzed current price lists and historical land reclamation projects. The article proposes a method for estimating the cost structure of multi-directional projects by combining the basic directions. The changeability and predictability of various land reclamation solutions was analyzed in terms of fuzzy logic. A price list was developed, which included unit costs for separate types of reclamation works, independent of their type and scale. The assumed optimal measure involved comparing the cost of individual types of operations to the surface of the reclamation area. As an example, the method was also applied to hypothetical data from a clastic rock mine with a surface of 20 ha, and for the forest, agricultural and forest-agricultural reclamation directions. The forest-agricultural reclamation directions was presented in the proportions of 0.3:0.7.

Go to article

Authors and Affiliations

Urszula Kaźmierczak
Jerzy Malewski
Paweł Strzałkowski
Download PDF Download RIS Download Bibtex

Abstract

Methane is an atmospheric trace gas, which is estimated to contribute about 20% to global warming. Coal mining used to be regarded as attributing considerably to the anthropogenic emissions of that potent greenhouse gas. Recently discovered methanotrophic abilities of coalbed rocks brought a new argument to the discussion about the environmental impact of the mining industry. In the present work, we determined the methanotrophic activity and maximum capacity (Vmaxl of methane oxidation originating from rocks surrounding seam 385/2 of the "Bogdanka" coal mine. Methane oxidation rates ranged from 0.23lμM CH4 g "day ·1 in the rock from the middle of the seam to 0.619 μM CH4 g "day ·1 in the bottom rock (4.4 m depth). Methanotrophic activity and Ymax increased with the distance to the coal body and with decreasing TOC content. Initial and terminal redox conditions (Eh>320 mV, pH 7.60-8.62) confirmed the oxic character of the methane oxidation process.
Go to article

Authors and Affiliations

Zofia Stępniewska
Anna Pytlak
Download PDF Download RIS Download Bibtex

Abstract

Through in-situ stress measurements, stress data were obtained from an auxiliary transportation roadway in a coal mine in Shanxi Province, China. Based on the principles of elastic mechanics and using a generalized plane strain model, the mechanical effects of the in-situ stresses on an idealized roadway were calculated and the distributions of stresses, displacements, and plastic zones determined. Building on this model, the vulnerable zones in the roadway cross section were identified. Ground support specifications were developed and during specification design, comprehensive consideration was given to factors affecting the stability of the rock surrounding the roadway. A scientific and reasonable support scheme was put forward. Practical experience in the coal mine shows the normal forces of anchor bolt and cable, the minimal convergence of roof to floor, and a generally good support in the auxiliary transportation roadway. The support should ensure safe production during its service life. This study provides a new method for designing roadway support systems that can be particularly valuable for high-stress roadways.

Go to article

Authors and Affiliations

Hongjun Guo
Ming Ji
Weisheng Zhao
Download PDF Download RIS Download Bibtex

Abstract

The Legnica deposit is one of the most prospective in the context of future lignite mining. Its extraction will be inseparable from the removal of the rocks of the overburden, the volume of which is very large. Due to the raw material properties, some of the rocks can be classified as accompanying minerals. The raw material identification of overburden sediments in the Legnica lignite deposit is insufficient. So far, they haven’t been the subject of detailed and comprehensive research to prove their usefulness. The article was a summary of the knowledge on this subject. The following should be included in the accompanying minerals: Quaternary sands and gravels, tertiary sands and clays (Poznan clays). They are present in two colour variants in the Legnica deposit - and fiery. The mineral composition of greenish-blue clays allows them to be included in illite-kaolinite- smectite varieties, in turn fiery clays as kaolinite-illite-smectite varieties. The tertiary clays are a very useful raw material for the production of building materials. In addition, they are potential mineral sorbents due to the nature of the association of clay minerals (occurrence of montmorillonite). They also show suitability for building waterproofing barriers. Quaternary gravels and sands, developed in the overburden Legnica deposit are differentiated raw materials. Some of them are raw materials for the construction industry. The glacial tills can be used as a component of ceramic mixtures. Tertiary sands can be used as a proppant material. The information on the raw material properties of these sediments will be one of the essential criteria for their treatment as accompanying minerals. Minerals accompanying those developed in the Legnica deposit should be exploited and deposited selectively. The creation of anthropogenic deposits accumulating these minerals will provide the possibility of their use for decades after the termination of operation.

Go to article

Authors and Affiliations

Tadeusz Ratajczak
Elżbieta Hycnar
Download PDF Download RIS Download Bibtex

Abstract

Optimum truck numbers of an enterprise can be found by dividing the period of time passed between a departing truck after loading, the arrival at the dumping location, the arrival at the point of loading again and the average loading time parameters of a truck. The average loading time of the truck is directly associated with the bucket fill factor and cycle time of the excavator. While the bucket fill factor depends on the mechanical strength and the discontinuity characteristics of the rock, the cycle time is related to bucket volume, the strength and the discontinuity characteristics of the rock. In this study, two relations predicting the average cycle time of the bucket fill factor for both hydraulic and electric excavators is done by seven excavators with different bucket volumes, and mass characteristics of eight different rocks from a coal open pit mine. According to the above, the optimum truck number was developed.
Go to article

Bibliography

[1] S. Alarie, M. Gamache, Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines. International Journal of Surface Mining Reclamation and Environment 16, 59-76 (2002).
[2] M. Beaulieu, M. Gamache, An Enumeration Algorithm for Solving the Fleet Management Problem in Underground Mines. Computers and Operations Research 33 (6), 1606-1624 (2006).
[3] A.C.M.M. Campelo, T. Marin, The Impact of Payload Truck Factor Use in Mine Performance Reports for an Open Pit Copper Mine in Brazil. REM – International Engineering Journal 71 (3), (2018). DOI: https://doi. org/10.1590/0370-44672017710189
[4] Y. Chang, Ren and S. Wang, Modelling and Optimizing an Open-Pit Truck Scheduling Problem. Discrete Dynamics in Nature and Society (745378), 8 (2015). DOI: https://doi.org/10.1155/2015/745378
[5] P. Chaowasakoo et al., Digitalization of Mine Operations Scenarios to Benefit in Real-Time Truck Dispatching. International Journal of Mining Science and Technology 27 (2), 229-236 (2017).
[6] Y . Choi et al., Multi-Criteria Evaluation and Least-Cost Path Analysis for Optimal Haulage Routing of Dump Trucks in Large Scale Open Pit Mines. International Journal of Geographical Information Science 23 (12), 1541- 1567 (2009).
[7] S.R. Dindarloo, M. Osanloo, S. Frimpong, A Stochastic Simulation Framework for Truck and Shovel Selection and Sizing in Open Pit Mines. Journal of the Southern African Institute of Mining and Metallurgy 115 (3), 209-219 (2015).
[8] S.G. Ercelebi, A. Bascetin, O ptimization of Shovel-Truck System for Surface Mining. Journal of The Southern African Institute of Mining and Metallurgy 109, 433-439 (2009).
[9] Y . Li, N.L. Hu ,G.Q. Li, Open-Pit Hauling Dispatching Optimization Based on Improved Pso Algorithm. China’s Mining Magazine 22 (4), 98-105 (2013).
[10] G . Liu, S. Chai, Optimizing Open-Pit Truck Route Based on Minimization of Time-Varying Transport Energy Consumption. Mathematical Problems in Engineering (687108) (2019). DOI: https://doi.org/10.1155/2019/6987108
[11] P.R. Michaud, J.Y. Blanchet, Establishing a Quantitative Relation Between Post Blast Fragmentation and Mine Productivity a Case Study. Proceedings of 5th International Symposium on Rock Fragmentation by Blasting 386- 396 (1996).
[12] A. Moradi Afrapoli, H. Askari-Nasab, Mining Fleet Management Systems: A Review of Models and Algorithms. International Journal of Mining Reclamation and Environmental 1-19 (2017).
[13] M. Munirathinam, J.C. Yingling, A Review of Computer-Based Truck Dispatching Strategies for Surface Mining Operations. International Journal of Surface Mining Reclamation and Environmental 8, 1-15 (1994).
[14] S.P. Singh, T. Yalcin, Effects of Muck Size Distribution on Scooping Operations. Proceedings of 28th Annual Conference on Explosives and Blasting Techniques 315-325 (2002).
[15] M. Sarı, P.J.A. Lever, Effect of Blasted Rock Particle Size on Excavation Machine Loading Performance. 20th International Mining Congress and Exhibition of Turkey. ISBN 978-9944-89-288-9 (2007).
[16] R .F. Subtil, D.M. Silva, J.C. Alves, 35th Apcom Symposium/ Wollongong, Nsw, 24-30 September, 765-777 (2011).
[17] L . Zhang, X. Xia, An Integer Programming Approach for Truck-Shovel Dispatching Problem in Open-Pit Mines. Energy Procedia 75, 1779-1784 (2015).
Go to article

Authors and Affiliations

Abdurrahman Tosun
1
ORCID: ORCID

  1. Dokuz Eylul University, Bergama, 35062, Izmir, Turkey
Download PDF Download RIS Download Bibtex

Abstract

The correct management of underground works, petroleum and gas reservoirs and geothermal applications relies on the hydromechanical behaviour of rock masses. We describe a laboratory approach to measuring permeability for different types of rock specimens. A laboratory system was designed and set up using rock mechanics equipment (a servo-controlled hydraulic press, a Hoek cell, a pump for injecting water and a scale for measuring the volume of water flow). To verify the validity of the permeability measurements, tests were carried out on a reference porous rock (Corvio sandstone), with results showing good agreement with those published in the literature. Tests were subsequently carried out on artificially fissured granite specimens with different joint patterns, submitted to various confinement stresses up to 20 MPa. Results showed good agreement with traditional Klinkenberg test results. Other tests done with artificially fissured specimens are described for demonstrative purposes.

Go to article

Authors and Affiliations

Xian Estévez-Ventosa
Nubia Aurora González-Molano
Vanesa Blázquez-Pascual
José Alvarellos
Leandro R. Alejano
Download PDF Download RIS Download Bibtex

Abstract

This article describes some selected aspects of a preliminary treatment of measurement cycle results obtained by a new Pen206_18 type hydraulic borehole penetrometer (a borehole jack type), a tool of an in situ determining of mechanical properties of rocks. The pre-treatment of the measurement cycle results is a necessary step to prepare the data for a following appropriate analysis of stress-strain parameters of rocks. Aforementioned aspects are focused mainly on a pre-treatment of hydraulic pressure readouts.
The Pen206_18 type penetrometer is a modified version of a standard Pen206 type penetrometer. The standard version, based on a digital measurement of a critical hydraulic pressure, has been in use in polish hard coal mines for almost 15 years to determine various rock strength parameters. In contrary, the Pen206_18 type penetrometer now provides simultaneous recording of two main measurement cycle parameters (hydraulic pressure and a head pin stroke) during the whole measurement cycle duration. A recent modification of the penetrometer has given an opportunity to look closer at various factors having an influence on the measurement cycle data readouts and, as a consequence, to lay a foundation for a development a new penetrometric method of determining stress-strain parameters of rocks.
In this article it was shown that just before a main stage of the measurement cycle, a transitional stage could occur. It complicates a determination of the beginning of an useful set of measurement cycle data. This problem is widely known also in other static in situ methods of determining stress-strain parameters. Unfortunately, none of various known workouts of this problem were sufficiently adequate to the pre-treatment of the penetrometric measurement cycle results. Hence, a new method of determining the beginning of the useful set of pressure readouts has been developed. The proposed method takes into account an influence of an operational characteristics of the measuring device. This method is an essential part of a new pre-treatment procedure of the Pen206_18 measurement cycle’s pressure readouts.
Go to article

Bibliography

[1] A . Kidybiński, J. Gwiazda, Z. Hładysz, Ocena mechanicznych własności skał oraz stateczności górotworu hydraulicznym penetrometrem otworowym. Prace Głównego Instytutu Górnictwa, Seria Dodatkowa. Katowice (1976).
[2] R.E. Goodman, T.K. Van, F.E. Heuze, Measurement of Rock Deformability in Boreholes. In: Proceedings of the 10th U.S. Symposium on Rock Mechanics, University of Texas, Austin, TX, 523-555 (1970).
[3] AS TM D4971-02, Standard Test Method for Determining the In situ Modulus of Deformation of Rock Using the Diametrically Loaded 76-mm (3-in.) Borehole Jack. AS TM International, West Conshohocken, PA, (2002). DOI : https://doi.org/10.1520/D4971-16
[4] R. Pierszalik, S. Rajwa, A. Walentek, K. Bier, 2020. A Pen206 borehole jack suitability assessment for rock mass deformability determination. Arch. Min. Sci. 65 (3), 639-660 (2020). DOI : https://doi.org/10.24425/ams.2020.134135
[5] P.H.V. Nguyen, M. Rotkegel, H.D. Van, Analysis of Behaviour of the Steel Arch Support in the Geological and Mining Conditions of the Cam Pha Coal Basin, Vietnam. Arch. Min. Sci. 65 (3), 551-567 (2020). DOI : https://doi.org/10.24425/ams.2020.134134
[6] A . Walentek, T. Janoszek, S. Prusek, A. Wrana, Influence of longwall gateroad convergence on the process of mine ventilation network-model tests. International Journal of Mining Science and Technology 29, 585-590 (2019). DOI : https://doi.org/10.1016/j.ijmst.2019.06.013
[7] I RB Ogrodzieniec. Penetrometr otworowy typu Pen206. Dokumentacja techniczno-ruchowa + Załącznik A – pulpit Pen206E (2008).
[8] A . Nierobisz, Oznaczanie własności mechanicznych skał za pomocą hydraulicznego penetrometru otworowego nowej generacji. Górnictwo i Geoinżynieria 34 (2), 491-500 (2010).
[9] A . Nierobisz, J. Gawryś, K. Bier, Analiza konstrukcji hydraulicznego penetrometru otworowego i jego modernizacja dla zwiększenia zakresu pomiarowego. Przegląd Górniczy 72 (6), 1-15 (2016).
[10] F .E. Heuze, Estimating the Deformability and Strength of Rock Masses – In-Situ Tests, and Related Procedures. In: STRATCOM Advanced Concept Technology Demonstration (ACTD), Albuquerque (2003). DOI : https://doi.org/10.2172/15005085
[11] M. Rezaei, M. Ghafoori, R. Ajalloeian, Comparison between the In situ Tests’ Data and Empirical Equations for Estimation of Deformation Modulus of Rock Mass. Geosciences Research 1 (1), 47-59 (2016). DOI : https://doi.org/10.22606/gr.2016.11005
[12] A . Palmström, R. Singh, The deformation modulus of rock masses – comparisons between in situ tests and indirect estimates. Tunnelling and Underground Space Technology 16 (3), 115-131 (2001). DOI : https://doi.org/10.1016/S0886-7798(01)00038-4
[13] M. Bukowska, A. Kidybiński, Wpływ czynników naturalnych masywu skalnego na jego wytrzymałość określaną metodami penetrometryczną i laboratoryjną. Prace Naukowe Głównego Instytutu Górnictwa, Research reports mining and environment 1, 35-46 (2002).
Go to article

Authors and Affiliations

Rafał Pierszalik
1
ORCID: ORCID

  1. Central Mining Institute (GIG ), 1 Gwarków Sq., 40-166 Katowice, Poland
Download PDF Download RIS Download Bibtex

Abstract

Currently available field rock mass deformability determination methods are rather difficult to perform, due to their complexity and a time-consuming nature. This article shows results of a suitability assessment of a Pen206 borehole jack (a hydraulic penetrometer) for field rock mass deformability measurements. This type of the borehole jack is widely used in Polish hard coal mining industry. It was originally intended only for quick rock mass strength parameters determination. This article describes an analysis and scope of basic modifications performed mainly on a borehole jack head. It includes discussion of results with possible directions for future development of the device.

Go to article

Authors and Affiliations

Rafał Pierszalik
ORCID: ORCID
Sylwester Rajwa
ORCID: ORCID
Andrzej Walentek
Krzysztof Bier
Download PDF Download RIS Download Bibtex

Abstract

A “rock bridge”, defined as the closest distance between two joints in a rock mass, is an important feature affecting the jointed rock mass strength. Artificial jointed rock specimens with two parallel joint fractures were tested under uniaxial compression and numerical simulations were carried out to study the effects of the inclination of the rock bridge, the dip angle of the joint, rock bridge length, and the length of joints on the strength of the jointed rock mass. Research results show: (1) When the length of the joint fracture, the length of the rock bridge, and the inclination of the rock bridge stay unchanged, the uniaxial compressive strength of the specimen gradually increases as the inclination of the joint fracture increases from 0° to 90°. (2) When the length of the joint fracture, the length of the rock bridge, and the inclination of the joint fracture stay unchanged, the uniaxial compressive strength of the specimen shows variations in trends with the inclination of the rock bridge increasing from 30° to 150° (3). In the case when the joint is angled from the vertical loading direction, when the dip angle of the joint fracture, the inclination of the rock bridge, and the length of the rock bridge stay unchanged, the uniaxial compressive strength of the specimen gradually decreases with an increasing length of joint fracture. When the dip angle of the joint fracture, the inclination of the rock bridge, and the length of the joint fracture stay unchanged, the uniaxial compressive strength of the specimen does not show a clear trend with an increase of the length of the rock bridge.

Go to article

Authors and Affiliations

L.X. Xiong
H.Y. Yuan
Y. Zhang
K.F. Zhang
J.B. Li
Download PDF Download RIS Download Bibtex

Abstract

The mechanical characteristics of transversely isotropic rocks are significantly different under various levels of inclination, and it is difficult to describe exactly the mechanical behaviour of transversely isotropic rocks. Assuming that rock consists of a great deal of microelements, and the microelement strength controlled by Mohr–Coulomb criterion follows the log normal distribution. The elastic modulus is used to reflect the anisotropy of rock, and the weak patches stiffness model is verified and employed to depict the variation of elastic modulus with different inclination angle. Based on basic damage mechanics theory and statistical method, a nonlinear statistical empirical model for transversely isotropic rocks is proposed under uniaxial compressive condition. In order to verify the correctness of the proposed model, comparison analyses between predicted results and experimental data taken from published literature are carried out, which have good consistency. Finally, the discussions on the influences of the distribution parameters ��, �� and elastic modulus with different inclination angle, ����, on proposed model is offered.
Go to article

Authors and Affiliations

Yansheng Deng
1
ORCID: ORCID
Chenjie Shen
1
ORCID: ORCID
Baoping Zou
1
ORCID: ORCID

  1. School of Civil Engineering and Architecture, Zhejiang University of Science and Technology, Hangzhou 310023, China
Download PDF Download RIS Download Bibtex

Abstract

In this study, the compressive deformation of crushed sandstone was tested using a crushed rock deformation-seepage test system, and the effects of various factors, including crushed rock grade, grade combination, water saturation status, and stress loading method (i.e., continuous loading or cyclic loading and unloading), on the compressive deformation of crushed sandstone was analyzed from four perspectives including stress-strain, bulking coefficient, deformation mechanism and energy dissipation. The results indicate that the stress-strain relations of crushed sandstone are closely associated with all factors considered, and are well represented by exponential functions. The strain observed for a given applied stress increased with increasing crushed rock grade throughout the loading period. Crushed sandstone grades were combined according to a grading index (n), where the proportion of large-grade rocks in the sample increased with increasing n. The bearing capacity of a water-saturated crushed sandstone sample with n = 0.2 was less than that of an equivalent dry sample for a given applied stress. The stress-strain curve of a water-saturated crushed sandstone sample with n = 0.2 under cyclic loading and unloading was similar to that obtained under continuous loading. Observation and discovery, the deformation mechanism of crushed sandstone was mainly divided into four stages, including crushing, rupture, corner detachment and corner wear. And 20% of the work done by testing machine is used for friction between the crushed sandstone with the inner wall of the test chamber, and 80% is used for the closing of the void between the crushed sandstone, friction sliding, crushing damage.

Go to article

Authors and Affiliations

Yanan Sun
Peisen Zhang
ORCID: ORCID
Wei Yan
ORCID: ORCID
Fenqian Yan
Junda Wu
Download PDF Download RIS Download Bibtex

Abstract

A simple empirical study on the orientation, diameter, and extent of radial fractures (long and short) at the vicinity of the face-perpendicular preconditioned boreholes is described. Homogenous and heterogeneous mining faces were considered when studying the orientation of radial fractures, four and five face-perpendicular preconditioning practices were used to investigate the outspread and diameter of radial fractures from one blasted drill hole to another. Long radial fractures were observed to be developed along the direction of the maximum principal stress and short radial fractures were observed to be developed along the direction of the intermediate principal stress in a homogenous mining face. On the other hand, long radial fractures were observed to be developed along the direction of the intermediate principal stress, while short radial fractures were observed to be developed along the direction of the maximum principal stress when the mining faces subjected to heterogeneous rock mass. The diameters of the radial fractures observed were inconsistent and were not nine times the diameter of the original borehole. Furthermore, the extent of radial fractures from one borehole to another was noted to be gradually improved when the additional of preconditioned borehole was in place. This study maintained that the orientation of radial fractures is mostly controlled by the rock properties, however, extend and the diameters of the radial fractures are controlled by rock properties, the effectiveness of the stress wave and gas pressure and brittleness of the rock mass.

Go to article

Authors and Affiliations

Fhatuwani Sengani
Download PDF Download RIS Download Bibtex

Abstract

This work presents an innovative shaft-lining solution which, in accordance with a patent of the Republic of Poland, allows successive, periodic leaching of excess rock salt migrating to the shaft opening. As is commonly known, all workings in rock salt strata are exposed to an increased convergence of sidewalls, making it very difficult to use shafts properly. Rocks migrating towards the shaft opening cause very high stress on the shaft liner. As a result, if the lining does not show substantial deformability, it fails. Lining failure due to insufficient deformability has been extensively described in the literature. Also, throughout the history of mining construction, a number of solutions have been proposed for different types of lining-deformability enhancement. For instance, the KGHM mining corporation applied a deformable steel lining – a solution used in the mining construction of galleries – along a 155-m-long section of the SW-4 shaft with diameters of 7,5 m that passes through a rock salt strata. At KGHM, the SW-4 shaft passes through a rock salt strata along a section of 155 m, in which a deformable enclosed steel lining was made. After several years, the convergence of shaft sidewalls stabilised at a rate of 0.5 mm/day. This enormous activity of the rock mass made it necessary to reconstruct the entire shaft section after only four years. According to further predictions, it will be necessary to reconstruct this section at least four times by 2045. This paper discusses in short form the underlying weaknesses of the technology in question.

As a solution to the problems mentioned above, the authors of this work present a very simple design of a shaft lining, called the tubing-aggregate lining, which utilises the leachability of salt rock massifs. The essential part of the lining is a layer of coarse aggregate set between the salt rock sidewall and the inner column of the tubing lining. One the one hand, coarse aggregate supports the salt rock sidewall and is highly deformable due to its compressibility, but on the other hand it allows water or low saturated brine to migrate and dissolve salt rock sidewalls.

This paper presents the first stage of works on this subject. Patent No. PL 223831 B had been granted before these works commenced.

Go to article

Authors and Affiliations

Paweł Kamiński
Piotr Czaja
Download PDF Download RIS Download Bibtex

Abstract

The conduction of mining activity under the conditions of rock bursts and rock mass tremors means that designers often utilise support systems comprising various configurations of steel arch, rock bolt and surface support. Particularly difficult geological and mining conditions, when wire mesh does not provide sufficient dynamic resistance, it requires an additional reinforcement with wire rope lacing in the form of steel ropes installed between the bolt ends and fixed to them by means of various rope clamps (e.g. u-bolt clamps). Bench tests were conducted to compare the strength of wire ropes under static and dynamic loading. The tests involved wire ropes with an internal diameter of Ø15.7 mm. Tests under static loading demonstrated that the cable bolts transferred a maximum force Fs max = 289.0 kN without failure, while the energy absorbed until failure was E 1s = 16.6 kJ. A comparative test result analysis for the wire ropes used in the bolt designs revealed that the influence of dynamic loading forces has a significant effect on reducing the rope load capacity, which results in the brittle cracking of the wires in the rope. Although the average dynamic force leading to wire rope failure F dmax = 279.1 kN is comparable to the minimum static force Fmin = 279 kN defined in the relevant standard, the average energy E1d absorbed by the cable bolt until failure is 48% lower than the energy E1s determined for wire rope failure under static loading. Furthermore, cable bolt failure under dynamic loading occurred at an impact velocity of the combined ram and crosshead masses ranging within vp = 1.4-1.5 m/s.
Go to article

Authors and Affiliations

Andrzej Pytlik
1
Mariusz Szot
1
ORCID: ORCID

  1. GIG – National Research Institute, Plac Gwarków 1, 40-166 Katowice, Poland
Download PDF Download RIS Download Bibtex

Abstract

The purpose of this paper is to investigate the effects of natural uncertainties and effective parameters on the stability of plate-type rock walls. For this, the effective factors and geo-mechanical properties in the study area were obtained using field experiments. Stability analysis of rock walls was investigated for 40 scenarios in dry and saturated states. These parameters were then evaluated using Easyfit software and Markov chain analysis and Monte Carlo simulation by Rock Plane software. Comparison of the results of numerical and uncertainty methods shows that the rock walls with 60-80 degree slope are stable; and In saturated state they require stability due to the reduction of shear strength. Fixation of the rock walls was also investigated, indicating an optimum angle of 30° for the installation of the rock screw. The results show that the Monte Carlo simulation provides a simpler interpretation and the uncertainty methods are more accurate and reliable than the numerical methods.

Go to article

Authors and Affiliations

Sina Mokhtar
Mostafa Yousefira
Download PDF Download RIS Download Bibtex

Abstract

Underground mining extraction causes the displacement and changes of stress fields in the surrounding rock mass. The determination of the changes is extremely important when the mining activity takes place in the proximity of post-flotation tailing ponds, which may affect the stability of the tailing dams. The deterministic modeling based on principles of continuum mechanics with the use of numerical methods, e.g. finite element method (FEM) should be used in all problems of predicting rock mass displacements and changes of stress field, particularly in cases of complex geology and complex mining methods. The accuracy of FEM solutions depends mainly on the quality of geomechanical parameters of the geological strata. The parameters, e.g. young modulus of elasticity, may require verification through a comparison with measured surface deformations using geodetic methods. This paper presents application of FEM in predicting effects of underground mining on the surface displacements in the area of the KGHM safety pillar of the tailing pond of the OUOW Żelazny Most. The area has been affected by room and pillar mining with roof bending in the years 2008-2016 and will be further exposed to room-and-pillar extraction with hydraulic filling in the years 2017–2019.

Go to article

Authors and Affiliations

Ewa Warchała
Anna Szostak-Chrzanowski
Paweł Stefanek
Download PDF Download RIS Download Bibtex

Abstract

The paper presents the statical research tests of rod bolt made of plastic with a length of 5.5 m, which were performed in a modern laboratory test facility at the Department of Underground Mining of the University of Science and Technology. Innovative The Self-excited Acoustic System (SAS) used to measure stress changes in the bolt support was characterized. The system can be used for the non-destructive evaluation of the strain of the bolt around the excavations as well as in tunnels. The aim of the study was to compare the re-sults recorded by two different measuring systems, thanks to which it will be possible to assess the load of long bolt support by means of the non-destructive method. The speed and simplicity of measurement, access to the sensors, accuracy of measurement and reading should be kept in mind in determining the load of rock bolt support . In addition, the possibility of damage to the sensor as a re-sult of technological or natural hazards should also be taken into account. In economic conditions, the „technical - balance laws of production”, which ex-cludes the use of load sensors on each bolt must be preserved. The use of indi-vidual load sensors of rock bolt support for the boundary state, allows appro-priate protection actions of the mining crew against sudden loss of excavation stability to be taken. The paper presents two basic effects used in the ultrasonic measurement sys-tem. The first result was the existence of stable limit cycle oscillations for posi-tive feedback. This effect is called the self-excited effect. The second effect is called the elasto-acoustic effect. It means that with the change of elastic stress-es in the material bring the change of the speed of propagation of the wave. In this connection, the propagation time between measuring heads is also changed. This effect manifests itself in the change in the oscillation frequency of the self-excited system. For this reason, by measuring the frequency of self-excited oscillation, it is possible to indirectly determine the level of effort of the tested material.

Go to article

Authors and Affiliations

Krzysztof Skrzypkowski
Waldemar Korzeniowski
Krzysztof Zagórski
Krzysztof Lalik
Ireneusz Dominik
Janusz Kwaśniewski

This page uses 'cookies'. Learn more