To survive in the competitive challenges, the products have to be designed to meet the needs and requirements of customers, differ from the competitors, and be friendly with the environment. This research was to propose an innovative design approach for charcoal briquette packaging design to meet the customer requirements. The customer requirements were explored and translated to product characteristics by using quality function deployment. The customers’ perceptions to product visual forms were explored through the emotional design approach. Customers’ requirements and customer perceptions were integrated to create a new charcoal briquette packaging. A new packaging design and process during its life cycle was evaluated an impact on the environment through carbon footprint values. The result showed that the innovative design approach can be used to guide designer design the charcoal briquette packaging to meet the requirements and perceptions of customers, illustrate the product identity and be friendly with the environment.
Przejdź do artykułu

Autorzy i Afiliacje

Pilada Wangphanich
1
Nattapong Kongprasert
1

  1. Department of Industrial Engineering, Faculty of Engineering, Srinakharinwirot University, Thailand

Abstrakt

Improper planning of inventory will affect the factory operating costs, building costs, the cost of loss, and the cost of product defects due to being stored for too long which will eventually become a loss. This research discusses the processing industry which is experiencing lumpy demand. In carrying out the production process, the company has never made plans for future demand, resulting in a waste of message costs due to repeated orders of raw materials ordered to suppliers. This paper contributes to overcoming this issue by simulating future demand by using the Material Requirement Planning (MRP) method with a probabilistic Economic Order Quantity (EOQ) and Periodic Order Quantity (POQ) model. The demand in the coming period is determined using the Autoregressive Integrated Moving Average (ARIMA) method, and an aggregate plan is carried out to determine the regular cost of raw material production and optimal subcontracting. The final analysis states that the calculation of MRP on the selected items using POQ produces the lowest cost for planning S45C-F, SGT-R, and SKD11-R, while SLD-R uses the probabilistic EOQ method.
Przejdź do artykułu

Autorzy i Afiliacje

Filscha Nurprihatin
1
Glisina Dwinoor Rembulan
2
Yohanes Dwi Pratama
2

  1. Department of Industrial Engineering, Sampoerna University, Indonesia
  2. Department of Industrial Engineering, Universitas Bunda Mulia, Indonesia

Abstrakt

Recently, simultaneous monitoring of process mean and variability has gained increasing attention. By departing from the accurate measurements assumption, this paper investigates the effect of gauge measurement errors on the performance of the maximum generally weighted moving average (Max-GWMA) chart for simultaneous monitoring of process mean and variability under an additive covariate model. Multiple measurements procedure is employed to compensate for the undesired impact of gauge inaccuracy on detection capability of the Max- GWMA chart. Simulation experiments in terms of average run length (ARL) are conducted to assess the power of the developed chart to detect different out-of-control scenarios. The results confirm that the gauge inaccuracy affects the sensitivity of the Max-GWMA chart. Moreover, the results show that taking multiple measurements per item adequately decreases the adverse effect of measurement errors. Finally, a real-life example is presented to demonstrate how measurement errors increases the false alarm rate of the Max-GWMA chart.
Przejdź do artykułu

Autorzy i Afiliacje

Saeid Sharafi
1
Mohammad Reza Maleki
2
Ali Salmasnia
3
Reihaneh Mansoor
4

  1. Smart Research Center, Häme University of Applied Sciences, Finland
  2. Industrial Engineering Group, Golpayegan College of Engineering, Isfahan University of Technology, Golpayegan, Iran
  3. Department of Industrial Engineering, Faculty of Engineering, University of Qom, Iran
  4. Department of Industrial Engineering, University of Eyvanekey, Eyvanekey, Iran

Abstrakt

History has shown different approaches to improving productivity the way of companies do business. Since the early 1900s, the development of different production systems has played an increasingly remarkable role in global manufacturing countries. It seems, that the growth of understanding has widened the ideology of production systems used up to current ones. This article examines the development path of business development. It evaluates the suitability of the key tools used to support change in a modern business model in a customer-driven project business environment.
Przejdź do artykułu

Autorzy i Afiliacje

Jyri VUORELA
Mikael OLLIKAINEN
Vesa SALMINEN
Juha VARIS

Abstrakt

The purpose of the paper is to analyze the positioning of Ukraine in the global indices of innovative development and competitiveness, to evaluate the indicators of innovation activity and, based on the outcomes of the research, to determine the place of Ukraine in the global innovation space. The dynamics of innovation activity on an international scale based on the consolidated indicators of the Global Innovation Index are presented. Ukraine’s position in it and progress in achieving goals to better understand the processes that stimulate or constrain innovation are determined. Econometric methods to generalize the positioning of Ukraine in the global innovation space and the DEA method to study the relative individual effectiveness of the innovation environment and innovation activities in Europe are used.
Przejdź do artykułu

Autorzy i Afiliacje

Iryna VORONENKO
Nataliia KLYMENKO
Olena NAHORNA

Abstrakt

FMEAs have been prioritized using RPN; however, a new standard has introduced AP for prioritization. This study seeks to determine if the number of required improvement actions increases, decreases, or stays the same when using AP in place of RPN. Statistical software was used to simulate 10,000 combinations of severity, occurrence, and detection. Both AP and RPN were calculated for the 10,000 combinations. Statistical hypothesis testing was performed to determine if there was a difference between RPNs when sorted by AP and to determine if there was a difference in actions required using RPN or AP. There is a statistically significant difference between RPNs when sorted by high, medium, and low AP. Using an RPN threshold equal to or greater than 100 would result in no change in the number of actions required if prioritizing by high and medium, but would result in fewer actions required if only high is used.
Przejdź do artykułu

Autorzy i Afiliacje

Matthew Barsalou
1
ORCID: ORCID

  1. Automotive Industry, Germany

Abstrakt

Presently, digitalization is causing continuous transformation of industrial processes. However, it does pose challenges like spatially contextualizing data from industrial processes. There are various methods for calculating and delivering real-time location data. Indoor positioning systems (IPS) are one such method, used to locate objects and people within buildings. They have the potential to improve digital industrial processes, but they are currently underutilized. In addition, augmented reality (AR) is a critical technology in today’s digital industrial transformation. This article aims to investigate the use of IPS and AR in manufacturing, the methodologies and technologies employed, the issues and limitations encountered, and identify future research opportunities. This study concludes that, while there have been many studies on IPS and navigation AR, there has been a dearth of research efforts in combining the two. Furthermore, because controlled environments may not expose users to the practical issues they may face, more research in a real-world manufacturing environment is required to produce more reliable and sustainable results.
Przejdź do artykułu

Autorzy i Afiliacje

Kuhelee Chandel
1
Julia Åhlén
1
Stefan Seipel
1 2

  1. Department of Computer and Geospatial Sciences, University of Gävle, Sweden
  2. Division of Visual Information and Interaction, Department of Information Technology, Uppsala University, Sweden

Abstrakt

Supply Chain Management (SCM) is a very important part of the industrial world, especially in the manufacturing sector. The development of the business world affects the complexity of the supply chain due to the lack of logistics infrastructure, quality of materials and components, and much more. Supply chain disruption risk mapping needs to be done due to high uncertainty, which is overcome by implementing a decision support system. Based on the background of the problem, supply chain disruption mapping uses the help of the Six Sigma method, which consists of 5 stages: Define, Measure, Analyze, Improve, and Control (DMAIC). The measurement of disturbance also uses the Failure Mode and Effect Analysis (FMEA) approach to prioritize risk. Risks that have a high assessment and cause failure need to be prioritized for improvement. This study aims to map supply chain disruptions in the current manufacturing industry based on the barriers, resistances, and causes detected for making a decision support system prototype. By implementing a decision support system in the supply chain process, it is
Przejdź do artykułu

Autorzy i Afiliacje

Johanes Fernandes Andry
1
Filscha Nurprihatin
2
Lydia Liliana
1

  1. Department of Information Systems, Universitas Bunda Mulia, Indonesia
  2. Department of Industrial Engineering, Sampoerna University, Indonesia

Abstrakt

The article is to present the application of genetic algorithm in production scheduling in a production company. In the research work the assumptions of the methodology were described and the operation of the proposed genetic algorithm was presented in details. Genetic algorithms are useful in complex large scale combinatorial optimisation tasks and in the engineering tasks with numerous limitations in the production engineering. Moreover, they are more reliable than the existing direct search algorithms. The research is focused on the effectivity improvement and on the methodology of scheduling of a manufacturing cell work. The genetic algorithm used in the work appeared to be robust and fast in finding accurate solutions. It was shown by experiment that using this method enables obtaining schedules suitable for a model. It
Przejdź do artykułu

Autorzy i Afiliacje

Marcin Matuszny
1
ORCID: ORCID

  1. University of Bielsko-Biala, Bielsko-Biała, Poland

Abstrakt

The study was conducted to assess and substantiate the key systemic problems of the national engineering of different countries in the context of economic globalization. To achieve this goal, the study used the author’s method to assess the dependence of mechanical engineering in Ukraine, Poland and Germany on imports of intermediate goods. According to the results, it was determined that in the periods of increasing economic globalization of mechanical engineering in Ukraine, Poland and Germany has undergone systemic destructive changes and is in a threatening state, from the standpoint of economic security. In particular, in Ukrainian and Polish mechanical engineering, the dependence on imports of high-tech intermediate goods is excessively high. In contrast, German engineering, unlike Ukraine’s and Poland’s, is less dependent on imports of high-tech products, but requires much more resource-intensive intermediate goods. It is analytically substantiated that the identified problems with the import dependence of mechanical engineering in Ukraine, Poland and Germany are the result of irrational, one-sided perception of economic globalization by the main economic entities of these countries.
Przejdź do artykułu

Autorzy i Afiliacje

Svitlana Ishchuk
1
ORCID: ORCID
Lyubomyr Sozanskyy
1
ORCID: ORCID

  1. Department of Problems of the Real Sector of the Regional Economy, Institute of Regional Research named after M.I. Dolishniy of the NAS of Ukraine, Ukraine

Abstrakt

This paper presents the concept and methodology for the designing of a “tree-shaped” production line. The concept is a result of the search for production unit organization that meets the Lean Production assumptions, i.e. focusing on lead time (throughput time) shortening with simultaneous ability of use in conditions of varied product range. The varied product range characterized by lower technological-organizational similarity when compared to “Ushaped” units typical for Lean Production. The paper presents an algorithm for the designing of a “tree-shaped” production line and examples of its application. The designed unit underwent evaluation according to the criteria preferred by Lean Manufacturing experts. The designed production unit achieved results confirming the effectiveness of the proposed concept for the analysed sets of input data on the product range and production capacities.
Przejdź do artykułu

Autorzy i Afiliacje

Natalia Pawlak
1
Lukasz Hadas
1
Marek Fertsch
1

  1. Poznan University of Technology

Abstrakt

The manufacturing industry has been reshaping its operations using digital technologies for a smart production towards a more customized demand. Nevertheless, the flexibility to attend the production plan changes in real time is still challenging. Although the Internet of Services (IoS) has been addressed as a key element for Industry 4.0, there is still a lack of clarity about the IoS contribution for advanced manufacturing. Through a case study, the paper aims to validate the adherence of a theoretical model named Service-Oriented Manufacturing Architecture (SOMA) in two manufacturing companies that have been already engaged in Industry 4.0. As main results, it was concluded that IoS could suit in one case of Industry 4.0 flexible production process but not in a mass production one. Considering the scarcity of research that exemplifies the IoS contribution, the present paper brings an important assessment on a real manufacturing scenario.
Przejdź do artykułu

Autorzy i Afiliacje

Jacqueline Zonichenn Reis
1
Rodrigo Franco Goncalves
1
Marcia Terra Silva
1

  1. Graduate Studies in Production Engineering, Universidade Paulista, Brazil

Instrukcja dla autorów

All manuscripts should be submitted at:

https://www.editorialsystem.com/mper/

They are first examined by the Management and Production Engineering Review Editors. Manuscripts clearly not suitable for publication, incomplete or not prepared in the required style will be sent back to the authors without scientific review, but may be resubmitted as soon as they have been corrected. The ultimate decision to accept, accept subject to correction, or reject a manuscript lies within the prerogative of the Editor-in-Chief and is not subject to appeal. The editors are not obligated to justify their decision.

All manuscripts submitted to MPER at https://www.editorialsystem.com/mper/ will be sent to at least two and in some cases three reviewers for passing the double-blind review process. The responsible editor will make the decision either to send the manuscript to another reviewer to resolve the difference of opinion or return it to the authors for revision.

The material formatted in the MPER format must be unpublished and not under submission elsewhere. Once a year a list of co-operating reviewers is publish in electronic version of MPER.

All articles published in MPER are published in open access. In order to provide free access to readers, and to cover the costs of copyediting, typesetting, long-term archiving, and journal management, an article processing charge (APC) of 800 PLN (about 180 Euro, VAT included) for 10-page article applies to papers accepted after peer review. Each additional page of the article (over 10 pages) costs 80 PLN (about 18 Euro, VAT included). Maximum length of the article is 18 pages (using MPER template). There is no submission charge.

The average time during which the preliminary assessment of manuscripts is conducted - 14 days

The average time during which the reviews of manuscripts are conducted - 6 months

The average time in which the article is published - 12 months

Dodatkowe informacje

The non-commercial use of the article will be governed by the Creative Commons Attribution license as currently displayed on https://creativecommons.org/licenses/by/4.0/.

Zasady etyki publikacyjnej

The ethics statements for the journal Management and Production Engineering Review are based on the guidelines of Committee on publication ethics (COPE) and the ELSEVIER publishing ethics resource kit.
For Authors: All articles, published in the journal Management and Production Engineering Review have to comprise a list of references which correspond with the journal’s Instructions to authors for paper preparation. The authors should ensure that they have written entirely original works, and if the authors have used the work and/or words of others that this has been appropriately cited or quoted. All articles are tested using antyplagiarism programme. An author should not in general publish manuscripts describing essentially the same research in more than one journal or primary publication. Submitting the same manuscript to more than one journal concurrently constitutes unethical publishing behaviour and is unacceptable. Authorship should be limited to those who have made a significant contribution to the conception, design, execution, or interpretation of the reported study. The corresponding author should ensure that all co-authors have seen and approved the final version of the paper and have agreed to its submission for publication. All authors should disclose in their manuscript any financial or other substantive conflict of interest that might be construed to influence the results or interpretation of their manuscript. All sources of financial support for the project should be disclosed.
For Editor-in-Chief: The editor is responsible for decision which of the articles submitted to the journal should be published. The editor and editorial board and office must not disclose any information about a submitted manuscript to anyone other than the corresponding author, reviewers, potential reviewers, other editorial advisers, and the publisher, as appropriate. Unpublished materials disclosed in a submitted manuscript must not be used in an editor's own research without the express written consent of the author.
For Reviewers: Peer review helps the editor in making editorial decisions and also assist the author in improving the paper. Any selected referee who feels unqualified to review the research reported in a manuscript or knows that its prompt review will be impossible should notify the editor and excuse himself from the review process. Any manuscripts received for review must be treated as confidential documents. They must not be shown to or discussed with others except as authorized by the editor. Reviews should be conducted objectively. Personal criticism of the author is inappropriate. Reviewers should identify relevant published work that has not been cited by the authors. Any statement that an observation, derivation, or argument had been previously reported should be accompanied by the relevant citation. A reviewer should also call to the editor's attention any substantial similarity or overlap between the manuscript under consideration and any other published paper of which they have personal knowledge. Information obtained through peer review must be kept confidential and not used for personal advantage. Reviewers should not consider manuscripts in which they have conflicts of interest resulting from competitive, collaborative, or other relationships or connections with any of the authors, companies, or institutions connected to the papers. Other sources: http://apem-journal.org/

Procedura recenzowania

Received manuscripts are first examined by the Management and Production Engineering Review Editors. Manuscripts clearly not suitable for publication, incomplete or not prepared in the required style will be sent back to the authors without scientific review, but may be resubmitted as soon as they have been corrected. The corresponding author will be notified by e-mail when the manuscript is registered at the Editorial Office (office@mper.org). The ultimate decision to accept, accept subject to correction, or reject a manuscript lies within the prerogative of the Editor-in-Chief and is not subject to appeal. The editors are not obligated to justify their decision. All manuscripts submitted to MPER editorial office (e-mail: office@mper.org) will be sent to at least two and in some cases three reviewers for passing the double-blind review process. The responsible editor will make the decision either to send the manuscript to another reviewer to resolve the difference of opinion or return it to the authors for revision.

The average time during which the preliminary assessment of manuscripts is conducted - 14 days
The average time during which the reviews of manuscripts are conducted - 6 months
The average time in which the article is published - 8.4 months

Recenzenci

Zahid Hussain Agha Sarhad University of Science and IT Peshawar Pakistan
Mehmet Ali Akinlar Yildiz Technical University Turkey
Zoran Anisic University of Novi Sad, Faculty of Technical Sciences Serbia
Katarzyna Antosz Rzeszow University of Technology Poland
Rajesh As Maharaja Institute of Technology Thandavapura India
Erfan Babaee Tirkolaee Mazandaran University of Science and Technology Iran
Zbigniew Banaszak Koszalin University of Technology Poland
Jolanta Baran Silesian University of Technology Poland
Mariusz Bednarek WSB Warszawa Poland
Srinivasa Murthy Boorla Grupo Antolin Spain
Oumaima Bounou FST-Fez Marocco
Robert Cep VSB-TU OSTRAVA Czech Republic
Fatih Çetin Niğde Ömer Halisdemir University Turkey
Claudiu Cicea Bucharest University of Economic Studies Romania
Pedro Cunha Instituto Politécnico de Setúbal Portugal
Szymon Cyfert Poznań University of Economics and Business Poland
Asta Daunorienė Assoc. prof., Kaunas University of Technology Lithuania
Ahmed Deif Associate Prof. California Polytechnic State University USA
Yuliia Denysenko Sumy State University Ukraine
Jacek Diakun Poznań University of Technology Poland
Ewa Dostatni Poznan University of Technology Poland
Joanna Duda AGH University of Science and Technology Poland
Milan Edl University of West Bohemia Czech Republic
Joanna Ejdys Bialystok University of Technology Poland
Nurprihatin Filscha Department of Industrial Engineering, Universitas Bunda Mulia Indonesia
Adi Fitra Magister Industrial Engineering ,Mercubuana University Indonesia
Mosè Gallo Department of Chemical, Materials and Industrial Production Engineering, University of Napoli Federico II Italy
Józef Gawlik Cracow Univesity of Technology Poland
Andrzej Gessner Poznan University of Technology Poland
Arkadiusz Gola Lublin University of Technology, Poland Poland
Alireza Goli Department of industrial engineering, Yazd university, Yazd, Iran Iran
Błażej Góralski Poznan University of Technology Chair of Production Engineering Poland
Pop Grigore Marian Technical university of Cluj-Napoca Romania
Łukasz Grudzień Poznan University of Technology Poland
Vitalii Ivanov Sumy State University Ukraine
Małgorzata Jasiulewicz-Kaczmarek Poznan University of Technology Poland
Jozef Jurko Technical University in Košice Poland
Oksana Karpenko RUDN University Russia
Anna Karwasz Poznan University of Technology Poland
Sławomir Klos University of Zielona Góra, Institute of Mechanical Engineering Poland
Remigiusz Kozlowski University of Lodz Poland
Stanisław Krzyżaniak Poznań School of Logistics Poland
Anna Lewandowska-Ciszek State University of Applied Sciences in Konin Poland
Jerzy Lewandowski Warsaw University of Technology Poland
Anna Lis Gdańsk University of Technology Poland
Reza Lotfi Department of industrial engineering Yazd University Iran
Sylwia Łęgowik-Świącik Czestochowa University of Technology Poland
Iulian Malcoci PhD, Associate Professor / Mechanical Engineering Moldova
Damjan Maletic University of Maribor, Faculty of Organizational Sciences Slovenia
Paweł Mielcarek Poznań University of Economics and Business Poland
Anna Nagyova Technical University of Kosice Slovakia
Andrei Stefan Nestian Alexandru Ioan Cuza University Iasi, Romania Romania
Filip Osiński Poznan University of Technology Poland
Ivan Pavlenko Sumy State University Ukraine
Dragan Peraković University of Zagreb, Faculty of transport and traffic sciences Croatia
Niles Perera University of Moratuwa Sri Lanka
Jan Pitel Technical University of Kosice, Faculty of Manufacturing Technologies, Slovakia Slovakia
Paulina Rewers Poznan University od Technology Poland
Piotr Rogala Uniwersytet Ekonomiczny we Wrocłąwiu Poland
Izabela Rojek Kazimierz WIelki University Poland
Łukasz Rymaniak Poznan University of Technology Poland
Krzysztof Santarek Politechnika Warszawska Poland
Michał Sąsiadek Uniwersytet Zielonogórski Poland
Shah Rukh Shakeel University of Vaasa Finland Finland
Parveen Sharma Lovely Professional University Phagwara India
Dorota Stadnicka Rzeszow University of Technology Poland
Binod Timilsina University of Vaasa Finland
Justyna Trojanowska Poznan University of Technology Poland
Stefan Trzcielinski Poznan University of Technology, Faculty of Engineering Management Poland
Mariusz Uchroński Wroclaw University of Science and Technology Poland
Nicolae Stelian Ungureanu Technical University of Cluj-Napoca , Romania Romania
Wiesław Urban Politechnika Białostocka Poland
Wiesław Urban Bialystok University of Technology Poland
Gerhard-Wilhelm Weber FEM, PUT Poland
Ewa Więcek-Janka PUT Poland
Marek Wirkus Politechnika Gdańska, Wydział Zarządzenia i Ekonomii Poland
Rika Yunitarini Trunojoyo University Indonesia Indonesia
Jozef Zajac TU Kosice Slovakia
Paweł Zmarzły Kielce University of Technology Poland
Krzysztof Żywicki Poznan University of Technology Poland


Ta strona wykorzystuje pliki 'cookies'. Więcej informacji